Laserfiche WebLink
<br />Page 5 of 8 <br /> <br />Exhibit B <br /> <br /> <br /> <br /> <br />54 <br />136 <br />MATERIAL QUANTITY UNIT DESCRIPTION UNIT COST TOTAL COST <br />001115005 0 FT CROSSING, CONCRETE,115*,OMNI,9FT 232.05$ -$ <br />001115006 54 FT CROSSING, CONCRETE,136*,OMNI,9FT 226.94$ 12,254.76$ <br />001278343 55 EA PAD,TIE,GRADE CROSSING,PPI,16 1/2"PANDRL 22.31$ 1,227.05$ <br />082405050 0 FT RAIL,115*8R,PREMIUM,80'BLNK 15.21$ -$ <br />082421784 240 FT RAIL,136*8R,PREMIUM,80'BLNK 16.75$ 4,020.00$ <br />082405043 0 FT RAIL,115*8R,PREMIUM,CWR 20.87$ -$ <br />082421776 0 FT RAIL,136*8R,PREMIUM,CWR 28.12$ -$ <br />084710034 67 EA TIE,PRE-PLATED,10'-0",136LB,1:40, US 130.82$ 8,764.94$ <br />084100935 0 EA TIE,PRE-PLATED,10'-0",115LB,1:40 CANT 135.98$ -$ <br />002111013 290 EA CLIP,RAIL,PANDROL,E2055 1.78$ 516.20$ <br />002706001 0 EA RAIL,COMP,136-NEW-115-NEW,UNIVERSAL 1,008.00$ -$ <br />002706126 4 EA RAIL,COMP,136-NEW-115-3/8",UNIVERSAL 1,261.00$ 5,044.00$ <br />001410720 0 EA RAIL,TRANSITION,115*,14/32"701.76$ -$ <br />001410712 0 EA RAIL,TRANSITION,136*,14/32"791.04$ -$ <br />002303224 8 EA JOINT BAR, 115*,H/R,ROLLED,1 1/16"BOLT,US 48.75$ 390.00$ <br />002303226 8 EA JOINT BAR,136/132*,H/R,ROLLED,USA 54.70$ 437.60$ <br />001020561 32 EA BOLT,TRK,1 1/16"X6"2.63$ 84.16$ <br />001083601 32 EA WASHER,SPR,TRACK BOLT,1 1/16"0.62$ 19.84$ <br />799OTHER 240 FT 6" steel perforated drain pipe 10.00$ 2,400.00$ <br />002840256 200 LB SPIKE,TRACK,5/8"X6",BULK 0.46$ 92.00$ <br />007100628 190 TON BALLAST,GRADE 24 13.65$ 2,593.50$ <br />37,844.05$ <br />Manhours <br />Burdened <br />Labor ($) <br />Expenses <br />($)DESCRIPTION UNIT COST TOTAL COST <br />40 2,320.00$ 680.00$ Remove Existing Crossing Surface 75.00$ 3,000.00$ <br />120 6,960.00$ 2,040.00$ Build New Track Crossing 75.00$ 9,000.00$ <br />100 5,800.00$ 1,700.00$ Place and line track panels 75.00$ 7,500.00$ <br />80 4,640.00$ 1,360.00$ Place new concrete crossing surface 75.00$ 6,000.00$ <br />40 2,320.00$ 680.00$ Weld transition rails in to place 75.00$ 3,000.00$ <br />28,500.00$ <br />UNIT COST TOTAL COST <br />125.00$ 10,000.00$ <br />125.00$ 5,000.00$ <br />125.00$ 2,500.00$ <br />17,500.00$ <br />UNIT COST TOTAL COST <br />-50,000 <br />- <br />50,000.00$ <br />133,844.05$ <br />INSTALL CROSSINGS <br />LABOR - INSTALL CROSSING <br />MATERIAL TOTAL COST <br />CROSSING RAIL WT.:LBS (115 or 136) <br />MP12.27, Saint Paul SUB -Owasso Blvd <br />NETWORK NUMBER: <br />CROSSING LENGTH:LIN FT <br />LABOR TOTAL COST <br />Equipment Use <br />Crew Hours <br />80 <br />DESCRIPTION <br />Utility Crew <br />40 Surfacing Crew <br />20 Welding Crew <br />EQUIPMENT TOTAL COST <br />TOTAL COST OF REHABILITATION <br />OTHER TOTAL COST <br />OTHER <br />DESCRIPTION <br />Signage, Fuel, External equipment Rental, Heavy equipment contractor