My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-28-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
04-28-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:45 PM
Creation date
2/9/2022 3:17:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />12. 7. REHABILITATION – A project in which curb and gutter, sidewalks, bituminous <br />or concrete pavement, granular base or items appurtenant to these elements is are <br />modified or supplemented in-place, to restore the serviceability of the existing <br />street (i.e. bituminous overlays, cold-in-place recycling, etc.). <br /> <br />13. 8. RURAL STREET – Any street that has no curb and gutter and/or storm sewer, or <br />does not otherwise meet current City design standards. <br /> <br />14. SUBCOLLECTOR STREET – Residential street which carries between 250 and <br />1,000 ADT. Minimum construction width is 30 feet from face-of-curb to face-of- <br />curb. <br /> <br />15. 9. URBAN STREET – A street that has curb and gutter, storm sewer, and is <br />constructed to current City design standards. <br /> <br />16. 8”/3” URBAN SECTION – The basic street design section used by the City for <br />urban, residential streets. It consists of eight inches (8”) of Class V base and three <br />inches (3”) of bituminous surface for the roadway, concrete curb and gutter, as <br />well as all incidentals normally associated with the street construction project. In <br />some cases, this section will not be adequate due to soil conditions, traffic <br />loading, drainage factors, etc. When a street is upgraded from this basic section <br />in residential areas, the added costs associated with any upgrades will be borne by <br />the City. <br /> <br /> <br /> <br />SECTION II <br /> <br />GENERAL POLICIES AND PROCEDURES <br /> <br />The following are general principles, policies and procedures applicable to all types of <br />improvements: <br /> <br />1. Non-municipal funding sources such as Municipal State Aid (MSA) or grant <br />funds will not be credited to offset assessments as they will be utilized in a <br />revenue pool fund to offset total reconstruction program costs. <br /> <br />2. Special assessments will be levied as soon as practical. Normally this will be <br />within one year after substantial completion of the project. <br /> <br />3. Special assessments are intended to reflect the influence of a specific local <br />improvement upon the value of the property. Where the results of applying the <br />foregoing rules appear to result in an inequitable assessment, the comparative <br />market values of the lots in the area shall be considered with the ultimate test
The URL can be used to link to this page
Your browser does not support the video tag.