Laserfiche WebLink
<br /> <br />Staff is proposing to change the intersection to an all-way stop condition and will flag the new <br />signs for the first month or two to call attention to the change in the intersection. Staff can also <br />install flashing stop signs as the new signs to make drivers more aware of the change in the <br />intersection, but they may be disruptive to nearby homes. Staff will monitor the intersection and <br />stay in communication with school officials to see if flashing signs are warranted. <br /> <br />SOURCE OF FUNDS: <br />The cost to add two stop signs is less than $200 and will be paid for using the Streets Operating <br />Budget. City crews will install the signs and remove the rapid flashing crosswalk sign system. <br />Those signs could be used at a different location in the City. <br /> <br />STAFF RECOMMENDATIONS: <br />Staff recommends the implementation of an all-way stop at the intersection of Eli Road and <br />Desoto Street. <br /> <br />ATTACHMENTS: <br />Bolton & Menk Intersection Analysis <br />Aerial Views of the intersection prior to 2009 and in 2020 <br /> <br />