My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-2021 Workshop Packet
>
City Council Packets
>
2020-2029
>
2021
>
09-08-2021 Workshop Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:45 PM
Creation date
2/9/2022 3:43:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br /> <br /> <br /> <br />TO: Mayor Keis and Members of City Council <br /> <br />FROM: Chris Heineman, City Administrator <br />DATE: September 8, 2021 <br /> <br />RE: South Owasso & Spruce Street Development Proposal <br /> <br /> <br /> <br />BACKGROUND INFORMATION <br />Staff will provide preliminary information about a proposed 74,500 square foot industrial facility <br />to be located at the Northwest quadrant of South Owasso and Spruce Street. Staff has been <br />working with the proposed developer for the past 3-4 months on a proposed project at the <br />previously undeveloped site. This item is closely related to the third strategic direction (Maximize <br />the City’s Assets to Catalyze Development) in the City of Little Canada’s Strategic Plan. <br /> <br />Due to the poor soil conditions on this site, significant subsurface improvements are required for <br />a development of this nature to occur on this site. During the due diligence process, the developer <br />has invested in the following items related to this site. <br />1) Geotechnical Report / American Engineering Testing (AET) <br />2) Legal Survey of existing site <br />3) Preliminary Site Plan for approximately 74,500 SF Warehouse <br />4) Preliminary Building Cost Breakdown / RJ Ryan Construction <br />5) Estimates for Rigid Subsurface Ground Improvement / Subsurface Constructors, Inc. <br /> <br />Each of these items have been submitted and were provided to a municipal financial advisor at <br />Baker Tilly (Mikaela Huot). Mikaela will provide preliminary revenue projections and financial <br />feasibility for the proposed industrial development project at this site at the workshop. It is very <br />likely that this project will require additional funding sources to assist with the subsurface <br />improvements required to construct a building on this site. <br /> <br />The purpose of including this item on the City Council workshop agenda is to determine if the <br />City Council supports development on this site and is willing to offer public assistance. If so, <br />additional financial review and needs analysis will be completed by Baker Tilly. A representative <br />for the developer will also be in attendance to answer any additional questions you may have. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.