My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-2021 Workshop Packet
>
City Council Packets
>
2020-2029
>
2021
>
09-08-2021 Workshop Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:45 PM
Creation date
2/9/2022 3:43:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Fire Equipment Fund (457): An annual property tax levy also funds this fund. In addition, <br />donations from the LCFD are added to this fund. Fire equipment vehicles are funded through this <br />fund. There will be approximately $1,361,613 in this fund as of 12/31/2021. This is enough to <br />fund the aerial truck that will be purchased in 2022 and is budgeted at $1,352,000. <br /> <br />Cell Tower Sale: The closing on the two cell towers occurred in 2020. As part of the sale, the <br />City received a lump sum payment of $324,873 and will receive $72,774 per year for the next nine <br />years. All transactions related to the sale of these cell towers have been recorded in the <br />Owasso/Woodlyn Redevelopment Fund (474). The current cash balance in Fund 474 is $672,618. <br />A transfer from the EDA Fund (105) in the amount of $350,000 occurred in 2013 when Fund 474 <br />was created. It is proposed to return these funds plus interest to the EDA Fund in the amount of <br />$443,370. The remaining funds of $322,618 can be left in Fund 474 or the funds can be transferred <br />to another fund. <br /> <br />Storm Water Utility: Over the past few years, the City Council has been considering establishing <br />a Stormwater Utility due to the increasing costs of maintaining the City’s stormwater system. If <br />the utility is established, property owners will pay for stormwater fee based on their impact to the <br />stormwater system. The fee will be added to the quarterly utility bill. In addition, approximately <br />$16,490 in General Fund operating expenditures will shifted to the new utility fund and there will <br />be a corresponding reduction in the property tax levy. It is proposed to include $24,600 in the <br />Infrastructure Capital Projects Fund (450) to move the establishment of the storm water fund <br />forward. <br /> <br />PRESENTATION: <br />Staff will present the attached PowerPoint on the 2022 Budget and Operating Levy at the <br />workshop. <br />
The URL can be used to link to this page
Your browser does not support the video tag.