My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-22-2021 Workshop Packet
>
City Council Packets
>
2020-2029
>
2021
>
09-22-2021 Workshop Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:45 PM
Creation date
2/9/2022 3:44:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br /> <br /> <br /> <br />TO: Mayor Keis and Members of City Council <br /> <br />FROM: Chris Heineman, City Administrator <br />DATE: September 22, 2021 <br /> <br />RE: South Owasso & Spruce Street Development Project <br /> <br /> <br />BACKGROUND INFORMATION <br /> <br />Staff provided preliminary information about a proposed 74,500 square foot industrial facility to <br />be located at the NW corner of South Owasso and Spruce Street. Staff has been working with the <br />proposed developer for the past 6-9 months on a proposed project at the previously undeveloped <br />site. Due to the poor soil conditions on this site, significant subsurface improvements are required <br />for a development of this nature to occur on this site. <br /> <br />Mikaela Huot from Baker Tilly provided preliminary revenue projections and financial feasibility <br />for the proposed industrial development project at this site at the workshop on September 8th. City <br />Council members were asked if they would be willing to offer public assistance through a proposed <br />Economic Development Tax Increment Finance (TIF) District if it was determined that this project <br />requires additional funding sources to assist with the subsurface improvements and other <br />extraordinary costs required to construct a 74,500 square foot industrial building on this site. <br /> <br />City Council members indicated that they would be open to offering public assistance if it was <br />determined that such assistance was necessary. Over the past two weeks, Mikaela Huot and her <br />team at Baker Tilly have completed additional financial review. Community Development <br />Director Corrin Wendell has also reviewed the proposal against both our current and the new <br />proposed zoning code regulations, and the proposed project meets all setback, access, dimension, <br />and parking requirements. Corrin stated that there may be additional landscaping requirements for <br />trees along Spruce and South Owasso Streets, but these can be added during the final site plan <br />review process. The following project details are attached for your information: <br />1) Architectural Site Plan <br />2) Scope of Services <br />3) Baker Tilly Memorandum <br /> <br />Additional details and analysis will be provided by Mikaela Huot at the City Council workshop. <br />Please feel free to contact me if you have any additional questions. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.