My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-22-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
09-22-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:45 PM
Creation date
2/9/2022 3:45:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT <br />TO:Mayor Keis and Members of the City Council <br />FROM:Bill Dircks, Public Works Director <br />DATE: September 22, 2021 <br />RE:Reimbursement for Curb Cut at 2883 Condit Street <br />ACTION TO BE CONSIDERED: <br />Motion to approve the reimbursement of $3,000 for a curb cut for a new driveway at 2883 Condit <br />Street. <br />BACKGROUND: <br />Condit Street was reconstructed from South Owasso Boulevard to Nadeau Road in 2008. The road <br />was previously a rural section with no curb and gutter. Concrete curb and gutter was added to the <br />road and the work was completed in the fall of 2008. The property at 2883 Condit Street was <br />assessed $7,246.25 for the project, which was the capped rate at the time of construction. <br />Teresa Miller, 2883 Condit Street, built a garage this year and the driveway will be located off of <br />Condit Street. The property is on the corner of Condit Street and Nadeau Road and in the past cars <br />were parked on the Nadeau side of the property. It is believed that the City Engineer did not <br />include a curb cut on Condit Street since the cars were always parked on Nadeau Road. The <br />Engineer did not ask Ms. Miller if she wanted a curb cut while the project was underway. <br />Ms. Miller has now requested that the City reimburse her for the cost of the curb cut for the new <br />driveway since she was not afforded the opportunity to have one installed back in 2008. She <br />received an estimate for her entire new driveway and the curb cut portion of the driveway is $3,000. <br />The City Engineer has looked at the estimate and has said it is a reasonable price for the work <br />proposed. He estimates the City would pay $3,800-$4,500 to have a contractor come in and do the <br />work. The concrete contractor that worked on the City’s 2021 street projects has already completed <br />all of the concrete work and would not be available to come back in and install the curb cut at this <br />year’s pricing. Using the same contractor as the one installing the rest of the driveway makes for a <br />smoother operation all around with no coordination necessary. <br />Staff finds this reimbursement request for a curb cut to be reasonable given the offer was not <br />extended back in 2008. <br />SOURCE OF FUNDS: <br />Funds for this work will come from the 450 Fund (Infrastructure Fund) <br />STAFF RECOMMENDATIONS: <br />Staff recommends approving the reimbursement of $3000 for the installation of a curb cut at 2883 <br />Condit Street.
The URL can be used to link to this page
Your browser does not support the video tag.