Laserfiche WebLink
Pioneer Park Phase 1 Master Plan Improvements Summary Table <br />ID#Identified Improvements Estimated Cost Priority <br />Amenities & Enhancements <br />Park Amenities <br />Trail Lighting - Phase 1 $8,000 1 2022 <br />Trail Lighting - Phase 2 $95,000 2 2022 <br />Trail Lighting - Phase 3 $181,000 3 2028 <br />Lighting along loop trail <br />Trail Lighting - Phase 4 $90,000 4 2031 <br />Lighting all remaining spur trails <br />Multi-use field lighting $260,000 5 Future <br />Shelter - replace east shelter (multi-use)$97,000 5 Future <br />Monoslope strucutre to double as performance space <br />Shelter - west side $97,000 1 2023 <br />Incorporate into the play node <br />Bicycle parking $1,000 1 2022 <br />Portable toilet $3,000 3 2029 <br />Benches $38,000 3 2029 <br />Picnic tables $26,000 3 2029 <br />Waste receptacles $20,000 3 2029 <br />Dog waste stations $4,000 3 2029 <br />Entrance signs (2)$7,000 3 <br />Minimum maintenance park entrance signs at east and west entry <br />Interpretive signage (5)$15,000 2 2026 <br />Wayfinding sign - trail system $4,000 4 2031 <br />Trail distance markers $2,000 4 2024 <br />Total Estimated Costs $5,821,000 <br />Located at east and west entry <br />Ensure accessible access to all park benches <br />Ensure accessible access to all park benches. Include accessible picnic tables <br />Solar feasibility Study <br />Lighting between parking lots <br />28 <br />29 <br />30 <br />31 <br />28 <br />28 <br />History, cultural context, stormwater, native vegetation/habitat, shade tree nuresry <br />City trail system map and park trail map with measurable loop <br />0.6-mile loop41 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />28 <br />Page 4 of 5