Laserfiche WebLink
Pioneer Park Phase 1 Master Plan Improvements Summary Table <br />ID#Identified Improvements Estimated Cost Priority Level Year in <br />CIP <br />Access/Accessibility <br />Non-Motorized <br />Trail Repair - Play Node $26,000 1 2023 <br />Trail Repair - Rating 2 $101,000 2 2024 <br />Trail Repair - Rating 3 $41,000 3 2028 <br />Trail Repair - Rating 4 $76,000 4 2031 <br />Trail widening $237,000 5 Future <br />Trail segment reconstruction - winter activity loop $12,000 4 2031 <br />Trail construction - soft surface $13,000 3 2028 <br />Develop accessible pedestrian access (2)$9,000 1 2023 <br />Accessible route to park amenities $7,000 1 2023 <br />Vehicular <br />East parking lot expansion $127,000 5 Future <br />West parking lot expansion $240,000 5 Future <br />Routine maintenance to existing trails based on engineering review <br />Northwest park entry, south access to Montreal Courts <br />Concrete walk connecting trail to entry point <br />Currently 27 spaces.Expand to south, adding (+/-) 18 spaces <br />Currently 150 spaces. Expand to south adding (+/-) 40 spaces <br />Widen park trails to 10-feet. Accounts for total linear feet of all existing trails. <br />Reconstruct identified trail segment to allow adequate clearance for winter trail loop. Location coincides with necessary <br />drainage improvements. <br />Establish soft surface trail along northeast pond <br />2 <br />3 <br />4 <br />5 <br />6 <br />1 <br />7 <br />8 <br />Page 1 of 5