Laserfiche WebLink
<br />Prepared by: Bolton & Menk, Inc. FINANCING <br />2022 Street & Utility Improvements (Yorkton Ridge, Maple Ln - Jackson) St ǀ 0N1.125241 Page 8 <br />V. FINANCING <br />Street: The City’s Assessment Policy for rehabilitated urban streets outlines that 50% of street <br />rehabilitation costs, including any cost associated with the repair of curb and gutter, shall be <br />assessed to the benefited properties. The special assessment policy includes special provisions for <br />corner lots, commercial properties, lots that have already been assessed, and minimum/maximum <br />front footages; notes and adjustments for these parcels are listed in the Assessment Rolls in <br />Appendix C. The remaining street costs will be funded using the City’s Infrastructure Capital <br />Improvement Fund. <br />Yorkton Ridge is recommended to be assessed on a per unit basis due to the similar size and use of <br />the properties being assessed. As such, parcels are assigned a unit value, adjusted in accordance <br />with the special provisions described above. The total assessable cost is then divided among the <br />total units and assigned to each benefiting parcel according to its unit value. <br />Maple Lane – Jackson Street is recommended to be assessed on a per unit basis due to the similar <br />size and use of the properties being assessed. As such, parcels are assigned a unit value, adjusted in <br />accordance with the special provisions described above. The total assessable cost is then divided <br />among the total units and assigned to each benefiting parcel according to its unit value. <br />Water, Sewer, and Storm: This project includes only minor water, sanitary, and storm sewer <br />repairs. As such, in accordance with the City’s Special Assessment Policy, water, sanitary, and <br />storm sewer improvements will not be assessed. Instead, they will be funded by the City’s <br />Infrastructure Capital Improvement Fund. <br /> Special Assessment – Street Costs Assessed <br />The unit assessments discussed below are estimates. At the conclusion of construction, City <br />staff will tabulate actual/final construction costs and use those costs as the basis for the levied <br />assessments. An Assessment Hearing will be held by the City Council to share these costs <br />with the residents. <br />1. Yorkton Ridge <br />A per unit assessment method is being utilized for Yorkton Ridge due to the <br />consistency of adjacent property sizes and uses. <br />The estimated per policy assessments for street improvements are: <br />• Unit Assessment Rate $4,750.00 <br />Appendix C identifies the Assessment Roll and benefiting properties. <br />2. Maple Lane – Jackson Street <br />A per unit assessment method is being utilized for Maple Lane – Jackson Street due to <br />the consistency of adjacent property sizes and uses. <br />The estimated per policy assessments for street improvements are: <br />• Unit Assessment Rate $3,810.00 <br />Appendix C identifies the Assessment Roll and benefiting properties. <br /> <br /> <br /> <br /> <br />