Laserfiche WebLink
CITY OF LITTLE CANADA <br />2022 STREET IMPROVEMENTS - YORKTON RIDGE PRELIMINARY COST ESTIMATE <br />BMI PROJECT NUMBER: 0N1.125241 <br />11/9/2021 <br />QUANTITY AMOUNT <br />ITEM NO.MNDOT <br />SPEC.NO DESCRIPTION NOTES UNIT <br />UNIT <br />COST <br />YORKTON RIDGE <br />27 2504.602 REMOVE AND REPLACE GATE VALVE BOLTS EACH $1,500.00 3 $4,500.00 <br />28 2504.602 REMOVE AND REPLACE HYDRANT & VALVE BOLTS EACH $1,500.00 3 $4,500.00 <br />29 2504.602 REMOVE AND REPLACE FITTING BOLTS EACH $1,500.00 8 $12,000.00 <br />30 2504.602 REMOVE & REPLACE GATE VALVE BOX EACH $1,800.00 6 $10,800.00 <br />$31,800 <br />$3,180 <br />$34,980 <br />$6,296 <br />$41,276 <br />31 2104.502 REMOVE CASTING & RINGS (STORM)EACH $350.00 4 $1,400.00 <br />32 2104.502 REMOVE DRAINAGE STRUCTURE EACH $550.00 1 $550.00 <br />33 2104.503 REMOVE SEWER PIPE (STORM)LF $25.00 16 $400.00 <br />34 2503.503 12" RC PIPE SEWER CL V LF $100.00 16 $1,600.00 <br />35 2503.602 2'X3' CB RING SEAL (FLEX-SEAL)LF $850.00 5 $4,250.00 <br />36 2503.602 CONNECT TO EXISTING STORM SEWER EACH $1,500.00 2 $3,000.00 <br />37 2506.602 CONST DRAINAGE STRUCTURE DESIGN 4' EACH $3,500.00 1 $3,500.00 <br />38 2506.602 NEW RINGS AND CASTING (STORM)EACH $1,250.00 5 $6,250.00 <br />$20,950 <br />$2,095 <br />$23,045 <br />$4,148 <br />$27,193 <br />PROJECT SUBTOTALS (CONSTRUCTION & CONTINGENCY) <br />PART "1" - STREETS $180,426 <br />PART "2" - SANITARY SEWER $11,275 <br />PART "3" - WATERMAIN $34,980 <br />PART "4" - STORM SEWER $23,045 <br />CONSTRUCTION TOTAL $249,726 <br />ENGINEERING $44,951 <br />GEOTECHNICAL $7,500 <br />PROJECT TOTAL $302,176 <br />PART 3: WATERMAIN - PROJECT TOTAL <br />PART 3: WATERMAIN <br />PART 3: WATERMAIN - CONSTRUCTION SUBTOTAL <br />+10% CONTINGENCY <br />PART 3: WATERMAIN- CONSTRUCTION TOTAL <br />+18% ENGINEERING <br />PART 4: STORM SEWER <br />PART 4: STORM SEWER - CONSTRUCTION SUBTOTAL <br />+10% CONTINGENCY <br />PART 4: STORM SEWER - CONSTRUCTION TOTAL <br />+18% ENGINEERING <br />PART 4: STORM SEWER - PROJECT TOTAL