Laserfiche WebLink
CITY OF LITTLE CANADA <br />CAPITAL PROJECTS <br />2022 Projects <br />Project Type Location Description Cost Project Description <br />PW Equip.Enclosed trailer 3,800 Not completed in 2021, move to 2022 <br />PW Equip.Cut-off Saw 14""1,200 <br />PW Equip.Pickup broom 3,500 <br />Funded with General Capital Improvements (Fund 400)1,435,345 <br />Streets S Owasso Railroad Crossing 35,000 Not completed in 2021, move to 2022 <br />Streets Yorkton Ridge (Condit W to Cul-de-sa 331,700 <br />Streets Woodlyn Avenue (RR Tracks to East)435,700 <br />Streets Maple Lane (Jackson to Cul-de-sac)313,100 <br />Streets Ryan Dr (Spruce to Country Dr)548,000 <br />Streets County Road D (Phase 2-Design City 55,000 <br />Storm MS4-ID Software 3,600 <br />Storm Storm Water Utility Implementation 30,000 <br />Storm Pond Cleanout 15,000 <br />Storm B2/Gervais Hills Drive 70,000 <br />Storm Labore/Ontario 50,000 <br />Funded with Infrastructure Capital Improvements (Fund 450)1,887,100 <br />Trails Trout Brook Regional Trail 10,000 City Portion <br />Trails Easement acquisition 30,000 For Powerline trail <br />Trails Plan for trail connections 15,000 <br />Trails Appraisal future trails 5,000 <br />Funded with Park Land Acquisition (Fund 456)60,000 <br />Fire Aerial truck 500,000 Replace 1992 truck <br />Fire Fire Station Building repairs 2,450 <br />Fire Fire Station Blinds 11,000 <br />Fire Fire Station Computers 7,000 <br />Fire Fire Station Facility Assessment Study 10,000 Evaluate stair tower cracking <br />Fire Fire Station Facility Assessment Study 3,870 <br />Exterior front door, roof access door& frame, and <br />rooftop patio door <br />Fire Fire Station Facility Assessment Study 2,580 Plumbing-Replace water heaters <br />Fire Fire Station Facility Assessment Study 12,875 HVAC-clean ductwork <br />Fire Fire Station Facility Assessment Study 3,860 HVAC-PRV for hose tower&bathrooms <br />Fire Fire Station Facility Assessment Study 12,875 HVAC-apparatus bay fan <br />Fire Fire Station Facility Assessment Study 8,000 Fans <br />Fire Fire Station Facility Assessment Study 3,220 Mechanical-replace exhaust in apparatus bay <br />Funded with Fire Equipment Replacement Fund (Fund 457)577,730 <br />Water/Sewer Water meter gateway & software 8,000 <br />Water/Sewer GIS workorder software 20,000 <br />Water/Sewer Tablet and iPads 2,600 <br />Water/Sewer Meters-Large 30,000 <br />Water/Sewer Rice Street valve repair 80,000 <br />Water/Sewer Manhole repairs 130,000 <br />Water/Sewer Paint hydrants 32,000 <br />Water/Sewer Lining sanitary 200,000 Slip lining <br />Water/Sewer Misc. line repairs 50,000 <br />Water/Sewer Misc. building & equipment repairs 19,500 <br />Water/Sewer Lift Station-Controller 20,000 <br />Water/Sewer Lift Station-Upgrades 10,000 <br />Funded with Water/Sewer Replacement Fund (Fund 604)602,100 <br />Total 2022 Projects 4,562,275$ <br />19