My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-17-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
11-17-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:46 PM
Creation date
2/9/2022 3:59:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LITTLE CANADA <br />CAPITAL PROJECTS <br />2023 Projects <br />Project Type Location Description Cost Project Description <br />Storm Storm Catch Basin Repair 10,000 <br />Funded with Infrastructure Capital Improvements (Fund 450)2,326,300 <br />Trails Future Trail acquisition/appraisal 5,000 <br />Trails Waterworks trail connection 5,000 <br />Funded with Park Land Acquisition (Fund 456)10,000 <br />Fire Aerial truck 852,000 Replace 1992 truck <br />Fire Fire Station Emergency management radios 15,000 <br />Fire Fire Station Building repairs 2,450 <br />Fire Fire Station Tables and Chairs 56,000 <br />Fire Fire Station Facility Assessment Study 56,250 Repair stair tower cracking <br />Fire Fire Station Facility Assessment Study 25,750 Sitework-monument sign <br />Fire Fire Station Facility Assessment Study 36,600 <br />Replace concrete tiles on exterior of bldg. at <br />windows <br />Fire Fire Station Facility Assessment Study 63,600 Replace flashing on windows <br />Fire Fire Station Facility Assessment Study 250,430 Exterior-efflorescence remediation <br />Fire Fire Station Facility Assessment Study 20,020 <br />Repaint apparatus ceiling & replace floor in <br />storage/equipment <br />Fire Fire Station Facility Assessment Study 6,440 Interior-Replace accordion wall in training room <br />Fire Fire Station Facility Assessment Study 1,300 HVAC-heater for equip. room & storage room <br />Fire Fire Station Facility Assessment Study 7,730 Mechanical-replace hood on roof <br />Fire Fire Station Facility Assessment Study 206,000 Equip-vehicle exhaust system <br />Fire Fire Station Facility Assessment Study 3,220 Equip-clothes dryer <br />Fire Fire Station Facility Assessment Study 4,510 Equip-casework <br />Fire Fire Station Facility Assessment Study 6,440 Equip-apparatus filler <br />Fire Fire Station Facility Assessment Study 30,900 Equip-gear wash <br />Fire Fire Station Facility Assessment Study 33,130 Equip-generator replacement <br />Funded with Fire Equipment Replacement Fund (Fund 457)1,677,770 <br />Water/Sewer Tablet and iPads 3,900 <br />Water/Sewer Meters-Large 30,000 <br />Water/Sewer Generator-Small 3,000 <br />Water/Sewer Paint hydrants 25,000 <br />Water/Sewer Lining sanitary 50,000 Slip lining <br />Water/Sewer Misc. line repairs 50,000 <br />Water/Sewer Water tower inspection 15,000 <br />Water/Sewer Misc. building & equipment repairs 5,000 <br />Water/Sewer Lift Station-Controller 20,000 <br />Water/Sewer Lift Station-Force Main Cleaning 20,000 <br />Water/Sewer Lift Station Upgrades 10,000 <br />Funded with Water/Sewer Replacement Fund (Fund 604)231,900 <br />Total 2023 Projects 6,542,410$ <br />21
The URL can be used to link to this page
Your browser does not support the video tag.