My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-01-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
12-01-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:46 PM
Creation date
2/9/2022 4:02:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. INTRODUCTION <br />2022 Street & Utility Improvements (Woodlynn Ave, Ryan Dr) ǀ 0N1.125241 Page 2 <br />· 3151 Country Drive (Meyer Companies) – After reviewing the costs associated with <br />the work, this property owner noted that his septic system sufficiently suits his needs <br />and that he is not in favor of adding public sewer service to this project. <br /> Woodlynn Avenue Informational Meeting <br />Individual property owner meetings were held with impacted businesses on the eastern <br />portion of Woodlynn Avenue on October 6, 2021. Representatives from each business were <br />presented with preliminary designs with the opportunity to discuss the condition of existing <br />infrastructure and provide feedback. Generally, owners voiced concerns about reductions in <br />parking and commercial vehicle access. These comments were taken into consideration and <br />preliminary designs were revised. <br />Follow-up meetings with impacted businesses were held November 3, 9, and 10, 2021. <br />Revised preliminary designs were once again presented the businesses with the opportunity <br />for further comment. Generally, property owners understood the need for the project and <br />approved of the revised street layouts that were presented. <br />If the City elects to proceed with the proposed street and utility improvements detailed in this <br />report, it is anticipated that construction would begin in 2022 as detailed in the project schedule <br />found on Page 14. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.