My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-01-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
12-01-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:46 PM
Creation date
2/9/2022 4:02:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. ESTIMATED COSTS <br />2022 Street & Utility Improvements (Woodlynn Ave, Ryan Dr) ǀ 0N1.125241 Page 12 <br />IV. ESTIMATED COSTS <br />The estimated project cost to complete the improvements proposed herein are presented below. <br />These costs include estimated construction costs, a 10% contingency, 18% engineering, and <br />allowances for geotechnical investigations. <br />These cost estimates are based upon public construction cost information. Since the consultant has <br />no control over the cost of labor, materials, competitive bidding process, weather conditions, and <br />other factors affecting the cost of construction, all cost estimates are opinions for general <br />information of the client and no warranty or guarantee as to the accuracy of construction cost <br />estimates is made. It is recommended that costs for project financing should be based upon actual, <br />competitive bid prices with reasonable contingencies. <br /> Ryan Drive <br />Table 1 – Estimated Cost Summary – Ryan Drive <br />(See Appendix B for Detailed Cost Estimate) <br />Item Total Estimated Cost <br />Street $220,937 <br />Storm Sewer $152,022 <br />Public Forcemain $60,746 <br />Private Forcemain Laterals (Est. $23,500 per parcel) Future Private Cost <br />Total $433,705 <br /> Woodlynn Avenue <br />Table 2 – Estimated Cost Summary – Woodlynn Ave <br />(See Appendix B for Detailed Cost Estimate) <br />Item Reconstruction <br />Area <br />Reclamation <br />Area <br />Totals <br />Street $439,036 $47,073 $486,109 <br />Curb & Gutter $57,534 $0 $57,534 <br />Sanitary Sewer $6,101 $0 $6,101 <br />Watermain $93,456 $0 $93,456 <br />Storm Sewer $46,842 $0 $46,842 <br />Rate Control, Volume <br />Control, and Water Quality Utilize Credit Balance <br />Total $642,968 $47,073 $690,042 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.