My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-15-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
12-15-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:46 PM
Creation date
2/9/2022 4:03:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Type Location Description Project Description Cost <br />CAPITAL PROJECTS <br />CITY OF LITTLE CANADA <br />2022 Projects <br />Streets S Owasso Railroad Crossing Not completed in 2021, move to 2022 35,000 <br />Streets Yorkton Ridge (Condit W to Cul-de-sac)331,700 <br />Streets Woodlyn Avenue (RR Tracks to East)435,700 <br />Streets Maple Lane (Jackson to Cul-de-sac)313,100 <br />Streets Ryan Dr (Spruce to Country Dr)548,000 <br />Streets County Road D (Phase 2-Design City Share)55,000 <br />Storm MS4-ID Software 3,600 <br />Storm Storm Water Utility Implementation 30,000 <br />Storm Pond Cleanout 15,000 <br />Storm B2/Gervais Hills Drive 70,000 <br />Storm Labore/Ontario 50,000 <br />Funded with Infrastructure Capital Improvements (Fund 450)1,887,100 <br />Trails Trout Brook Regional Trail City Portion 10,000 <br />Trails Easement acquisition For Powerline trail 30,000 <br />Trails Plan for trail connections 15,000 <br />Trails Appraisal future trails 5,000 <br />Funded with Park Land Acquisition (Fund 456)60,000 <br />Fire Fire Vehicle Aerial truck (1st Year Pymt)Replace 1992 truck 700,000 <br />Fire Fire Station Building repairs 2,450 <br />Fire Fire Station Blinds 11,000 <br />Fire Fire Station Computers 7,000 <br />Fire Fire Station Facility Assessment Study Evaluate stair tower cracking 10,000 <br />Fire Fire Station Facility Assessment Study <br />Exterior front door, roof access door& frame, and <br />rooftop patio door 3,870 <br />Fire Fire Station Facility Assessment Study Plumbing-Replace water heaters 2,580 <br />Fire Fire Station Facility Assessment Study HVAC-clean ductwork 12,875 <br />Fire Fire Station Facility Assessment Study HVAC-PRV for hose tower&bathrooms 3,860 <br />Fire Fire Station Facility Assessment Study HVAC-apparatus bay fan 12,875 <br />Fire Fire Station Facility Assessment Study Fans 8,000 <br />Fire Fire Station Facility Assessment Study Mechanical-replace exhaust in apparatus bay 3,220 <br />Funded with Fire Capital Fund (Fund 457)777,730 <br />Total 2022 Projects 4,160,175$ <br />93
The URL can be used to link to this page
Your browser does not support the video tag.