Laserfiche WebLink
STAFF REPORT <br />TO:Parks and Recreation Commission <br />FROM:Bryce Shearen, Parks and Recreation/Community Services Manager <br />DATE:May 31, 2019 <br />RE:Spooner Park Playground Update <br />The playground and trail upgrades at Spooner Park are underway. City staff removed the old <br />playground equipment and the volleyball net posts. Standard Contracting then mobilized to the site <br />and removed trees and transplanted three trees. One was moved to just outside the construction limits <br />near the playground and the other two were replanted in the south peninsula of the Centerville Road <br />parking lot at Pioneer Park. <br />Once the trees were removed grading operations began. The old trail was removed and the small <br />infiltration basin was excavated on the southeast side of the new playground, drain tile was laid in a <br />sand layer, and an outlet pipe was laid to the south. The playground container was graded and the <br />concrete ring surrounding the container as well as a new section of concrete near the upper shelter were <br />scheduled to be poured the week of June 3. <br />Once the concrete has been poured, the contractor will work its way north with grading. Grading <br />around the playground container will be completed and the temporary access road will be removed. <br />Fill will be brought in to raise the new trail grade to meet ADA standards. Once the trail section is <br />graded, the trail will be paved and the project will be ready for the community build on June 22 and 23. <br />While the weather has not cooperated very much, the contractor has maintained progress and remains <br />on the tight schedule to complete the project by June 15.