Laserfiche WebLink
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>S >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l <br />>>>>>>>>>>>>>>>>>>>>>>Eli road <br />27'9'20' <br />27'HPEDESTRIAN RAMP <br />10' WIDE BITUMINOUS TRAIL CONNECTION <br />OUTLET WATER QUALITY BMP TO CATCH BASIN <br />H:\LTCANADA_CI_MN\N15118872\CAD\C3D\Parking Lot Estimates\Spooner Park - Option 3.dwg 8/27/2020 5:25:13 PMR <br />Spooner Park Improvements <br />Little Canada <br />Concept 1B: New Lot Adjacent to Existing <br />August 2020 <br />R <br />FEETSCALE <br />0 10 20 <br />HORZ. <br />LEGEND <br />EXISTING PROPOSED <br />WATERMAIN <br />STORM SEWER <br />BITUMINOUS <br />CONCRETE PAVEMENT <br />l l l l <br />>>>>D <br />SCOPE OF WORK <br />1.LEAVE EXISTING LOT ALONE <br />2.SUBCUT NEW PARKING LOT <br />3.ADD SAND SECTION TO NEW PARKING LOT <br />4.ADD GRAVEL SECTION TO NEW PARKING LOT <br />5.INSTALL NEW CURB AND GUTTER <br />6.INSTALL WATER QUALITY BMP <br />7.PAVE NEW PARKING LOT <br />8.ADD TRAIL CONNECTION TO EXISTING PARKING <br />LOT <br /> BEFORE: 30 STALLS <br /> AFTER: 49 STALLS <br /> NET GAIN: 19 STALLS