My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-05-2020 Parks_Rec Packet
>
Agenda Packets
>
2020-2029
>
2020
>
11-05-2020 Parks_Rec Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:24:27 PM
Creation date
2/9/2022 4:24:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gervais Mill Entrance - Upgrade and enhance the Gervais Mill Park Entrance (Noel <br />Street side). The Commission recommended a preliminary design in 2019, and it was bid <br />in 2020. Due to the high cost of the bid, the project was moved to 2021. The project has <br />increased from $51,750 to $110,000. <br />Spooner Park Lower Shelter – $75,000 for a new larger open-air shelter for rental to <br />better serve the needs of the community. <br />Interpretive Signage – Add interpretive signage and wayfinding signage at each park <br />throughout the park system. The signs will highlight the area that park users are in and <br />give an overall view of the park system. This will give exposure to underutilized parks. It <br />will also allow people new to the area to be made aware of other park offerings within the <br />City. The anticipated price for design, materials, and installation is $20,000. This project <br />was moved from 2020 to 2021. <br />Entrance signs at all parks – New minimum maintenance park entrance signs to replace <br />the existing deteriorating signs for $33,250. <br />Consultant – $30,000 is included for a consultant for the Pioneer Park Master Planning <br />process. Once the Pioneer Park Master Planning process is complete, park projects <br />beyond 2021 may need to be postponed to concentrate on the Pioneer Park <br />improvements. <br />General park maintenance projects scheduled for 2021 include: <br />Trail repair and maintenance at Pioneer Park <br />New woodchips at the Nadeau Park playground <br />Continued work on buckthorn removal and general tree trimming primarily at Spooner <br />Park but other parks as needed <br />Continued work on habitat restoration at Thunder Bay/Westwind Park following the Xcel <br />clear cutting from 2018 <br />Looking past 2021, some highlights of upcoming projects are: <br />Boardwalk in Gervais Mill Park <br />Boardwalk/Pier at Nadeau Wildlife Park <br />Upgrade Band Shell at Spooner Park <br />Pioneer Park Playground equipment (transfer from Park Land Acquisition Fund 456) <br />Picnic shelter at Rondeau Park <br />Fitness Equipment in a Park (contingent on grant funding) <br />STAFF RECOMMENDATION: <br />Staff recommends the Commission discuss and provide feedback on the 2021-2025 Capital <br />Improvement Plan (CIP).
The URL can be used to link to this page
Your browser does not support the video tag.