My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-08-2021 Planning Commission Packet
>
Agenda Packets
>
2020-2029
>
2021
>
04-08-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 4:36:42 PM
Creation date
2/9/2022 6:08:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 915: General Development Requirements <br /> <br />Page 915-14 <br />(5) Upon receiving the approval of the City Engineer, the Zoning Administrator shall <br />issue a special permit for the installation and operation of the applicant's essential <br />services. If the Engineer's report recommends the denial of said permit causing the <br />Zoning Administrator to deny its issuance, the applicant may appeal said decision <br />to the Board of Appeals and adjustments under the rules and procedures as set forth <br />in Chapter 922 of this Code. <br />(D) All transmission pipelines (i.e. pipelines not required for local distributing network) and <br />overhead transmission and substation lines of 33 KV or greater shall be a conditional use <br />in all districts subject to the following procedural requirements: <br />(1) Prior to the installation of any of the previous essential services, the owner of such <br />service shall file with the Zoning Administrator, all maps and other pertinent <br />information as deemed necessary for the Planning Commission to review the <br />proposed project. <br />(2) The Zoning Administrator shall transmit the map and accompanying information to <br />the Planning Commission for its review and recommendations regarding the <br />project's relationship to the Comprehensive Plan and parts thereof. A part of this <br />review shall be a written report from the City Engineer. <br />(3) Compliance of the proposed project with the Comprehensive Plan. <br />(4) The City Council shall hold the necessary public hearings as prescribed by this <br />Code for conditional use. <br />(5) In considering the applications for the placement of essential services, as regulated <br />by this subdivision, the City Council shall consider the advice and <br />recommendations of the Planning Commission and the effect of the proposed <br />project upon the health, safety and general welfare of the City, existing and <br />anticipated; and the effect of the proposed project upon the Comprehensive Plan. <br />915.110 Explosive and Flammable Materials; Hazardous Materials <br />(A) In General <br />No use or structure involving the manufacture, storage, or use of explosive or flammable <br />materials shall be operated or occupied as to constitute a hazardous condition, or as to <br />unreasonably interfere with the use and enjoyment of property by any person of normal <br />sensitivities, or otherwise as to create a public nuisance. <br />(B) Specific Standards <br />All uses involving the manufacture, storage, or use of explosive or flammable materials <br />shall comply with all pertinent regulations, including but not limited to the Minnesota <br />Building Code and Minnesota Uniform Fire Code, and shall meet the requirements <br />identified as follows: <br />(C) Safety Devices <br />All uses involving the manufacture, storage, or use of explosive or flammable materials <br />shall employ best management practices and the provision of adequate safety devices to <br />guard against the hazards of fire and explosion and adequate fire-fighting and fire- <br />suppression devices standard in the industry.
The URL can be used to link to this page
Your browser does not support the video tag.