My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-08-08 Council Minutes
>
City Council Meeting Minutes
>
2000-2009
>
2008
>
10-08-08 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 2:44:42 PM
Creation date
10/23/2008 10:12:26 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />OCTOBER 8, 2008 <br />Aquatic Plant Management Specialist with the DNR, who indicated that a <br />full eradication will not happen. The Administrator indicated that Mr. <br />Vanderbosch will be revising the plan he previously prepared to indicate <br />the level of eradication that will be acceptable. He has indicated that a <br />maximum eradication of 5 acres is acceptable for large bodies of water, <br />and has suggested that 3.5 acres may be the most that will be approved for <br />West Savage Lake. The Administrator reported that it is an expensive <br />undertaking to contract for eradication. The Administrator suggested an <br />economical option would be for the City pay the cost of the chemical if <br />there are residents on the lake willing to apply it. <br />Blesener asked for clarification on the outlet weir (normal level). The <br />City Administrator noted the correspondence from the Watershed <br />indicating that the top of the weir is 895.4, which was raised from 895.1 in <br />2006 to compensate for the tip in the outlet pipe. The Administrator noted <br />the need for the DNR to modify their information to correspond with the <br />895.41eve1. Blesener pointed out that the 100-year flood elevation is only <br />two to three inches below the Smith's garage floor elevation. <br />The Administrator reviewed task 3 for dredging the wetland at Jackson <br />and Demont. The City Engineer will haue plans and specs ready for this <br />work by the end of the month to be completed over the winter. He will <br />include alternates for the sediment plumes in areas of Savage Lake noting <br />that access to these areas will be difficult. <br />Task 4 relative to evaluation/installation of storm water improvements. <br />The Administrator noted that the installation of rain water gardens in the <br />Savage Lake drainage area is the most reasonable option. Surveys were <br />recently mailed to property owners in the drainage area to determine the <br />level of interest. Survey information is due by October 15`h. The <br />Administrator indicated that the plan would be to have these rain water <br />gardens installed next summer. <br />Task 5 calls for the evaluation of a street sweeper purchase. The <br />Administrator reviewed the two types of sweepers, noting that the <br />regenerative air sweeper is favored by the Watershed as it picks up the <br />fine particulates which carry the most contamination. The cost of a <br />regular sweeper is estimated at $140,000 versus $200,000 for the <br />regenerative air sweeper. The Administrator indicated that the Watershed <br />has been approached relative to funding a portion of this cost as a <br />demonstration project. The Administrator also indicated that the cost of <br />this equipment could be included in the City's Capital Improvement <br />Budget or funded with LGA dollars depending on the level of future LGA <br />funds. Blesener suggested that another option would be a joint purchase <br />with another city, and suggested that City staff explore this option. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.