My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-11-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
05-11-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2022 6:17:58 PM
Creation date
7/27/2022 5:45:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Colonial Manor Series is a two-story back-to-back style townhome with 2-car garage. <br /> <br />Colonial Manor Series <br />Units: 106 lots <br />Building Width: 32 feet <br />Bedrooms: 3 bedrooms <br />Bathrooms: 3 bathrooms <br />Garage: 2-car <br />Square Footage: 1,769 – 1,800 <br />Base Price Range: **$333,990+ <br />**Pricing is estimated and subject to change based on current market conditions at time of sales. <br /> <br />Lennar’s design team will carefully plan the color packages of each building to avoid monotony <br />and to ensure a visually appealing streetscape. <br /> <br />This community will help deliver the City’s vision detailed in the Comprehensive Plan and referred <br />to as an ‘Age-Friendly Community’ – where the land use plan allows for the expansion of <br />housing options……people will be able to enjoy Little Canada as young singles, childless <br />couples, families and empty-nesters. The homes planned for Vanderbie Commons are popular <br />with buyers of all ages and stages in their lives. The community will be professionally maintained <br />via an established HOA. <br /> <br />Public Park and Trails <br />In response to the Connected Ramsey County Bicycle Network document, the future community <br />has planned for a trail connection along the western boundary to connect trail extensions <br />throughout the overhead powerline easement area to Allen Avenue – providing access to Pioneer <br />Park. In addition, public sidewalks will be installed along Vanderbie to promote walkability <br />throughout the community. <br /> <br />Schedule <br />Land development work (grading, utilities, and streets) is intended to begin as soon as all <br />development permits are obtained with construction on model homes beginning fall 2022 and <br />homes could be ready for the Spring 2023 Parade of Homes. The overall project will likely be <br />developed in multiple phases. Lennar estimates full occupancy of the community will occur <br />approximately 2 to 3 years from the date sales begin. <br /> <br />Current Use of Property: <br />The properties are mostly vacant with two of the parcels having a existing homes on it that would <br />be demolished. <br /> <br />Zoning: <br />The property is currently zoned R-1, Low Density Residential with future approval processes to <br />rezone it to R-2, Medium Density Residential to align with the Comprehensive Plan. <br /> <br />Attachments: <br />Please see the enclosed Application and Supplemental Information.
The URL can be used to link to this page
Your browser does not support the video tag.