Laserfiche WebLink
<br /> <br /> 4) Existing and proposed drainage and contour plan. The easements must be reflected on <br />the survey. <br />The applicant has provided a drainage and utility easements as shown on the certificate <br />of survey. The applicant complies with this standard. <br />5) Location and widths of proposed utility easements. <br />The applicant has provided utility easements as shown on the certificate of survey. The <br />applicant complies with this standard. <br />6) Existing street rights-of-way, railroad and utility rights-of-way, parks and other public <br />open space, permanent building and easements within the existing lot and adjoining <br />lots. <br />The applicant has provided existing street rights-of-way as shown on the certificate of <br />survey. <br />7) Areas, other than street and utility easements, that you intend to dedicate for public use, <br />including their areas. <br />The applicant describes the linear trail and open areas under the existing power lines. <br />8) Scale of the drawing and north arrow. <br />The applicant has provided a north arrow as shown on the certificate of survey. <br />9) Certificate of Survey. <br />The applicant has provided a certificate of survey. <br /> <br /> <br />