Laserfiche WebLink
K:\019789-000\Cad\Plan\019789-000-C-GRAD-PLAN.dwg 4/26/2022 11:47:36 AMC-109 <br />AS SHOWN LCW <br />JMSDJK <br />SCALE: <br />PLAN BY: <br />DESIGN BY: <br />CHECK BY: <br />SHEET <br />WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONVANDERBIE COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 James M Soltis04-08-2022XXXXXGRADING <br />NOTES <br />GRADING NOTES <br />1. RELOCATE BENCHMARKS AS NECESSARY WITH NEW BENCHMARK LOCATIONS WITHIN A TOLERANCE OF 0.010 VERTICALFEET. <br />2. BUILDING FLOOR ELEVATION (FFE) AS INDICATED ON THE DRAWINGS CORRESPONDS TO ELEVATION 100'-0" ON ALL OTHER <br />DISCIPLINE SHEETS (ARCHITECTURAL, STRUCTURAL, ETC). <br />3. THE PROPOSED GRADES SHOWN ON THE GRADING PLAN ARE FINISHED GRADES. SPOT ELEVATIONS ALONG CURB LINES <br />REPRESENT THE FLOWLINE UNLESS OTHERWISE NOTED. <br />5. SPOT ELEVATIONS SHOWN AT CATCH BASINS ON THIS PLAN DO NOT REFLECT 2" CASTING SUMP. <br />6. GRADING ACTIVITY WHICH BLOCKS TRAFFIC OF ANY STREET, ALLEY, OR DRIVE IS SUBJECT TO APPROVAL BY THE CITY. <br />7. CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE ENGINEER AND OWNER IF CONTAMINANTS ARE FOUND IN <br />THE EXISTING SOILS. <br />8. SIDEWALK CROSS-SLOPES SHALL NOT EXCEED 2.0% AND LONGITUDINAL SLOPES SHALL NOT EXCEED 5.0%. <br />9. IN AREAS WHERE NEW FILL IS TO BE PLACED ON SLOPING GROUND, BENCHING THE SURFACE SHALL BE COMPLETED <br />PRIOR TO PLACING THE FILL. BENCHING SHALL BE COMPLETED WHERE SLOPES ARE STEEPER THAN 4:1 <br />(HORIZONTAL:VERTICAL). <br />10. PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREA. DO NOT ALLOW WATER TO POND IN <br />EXCAVATION AREAS, AND MAINTAIN ALL EXISTING DRAINAGE PATTERNS. <br />11. UNLESS OTHERWISE NOTED, FINISH GRADE SHALL BE SIX INCHES BELOW FINISHED FLOOR IN NON-PAVED AREAS. <br />12. THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH ALL OSHA REGULATIONS IN THE EXECUTION OF WORK <br />UNDER THIS CONTRACT. <br />13. THE CONTRACTOR SHALL APPLY FOR A CITY GRADING PERMIT BEFORE STARTING WORK. THE INSPECTOR AND THE CITY <br />PUBLIC WORKS DEPARTMENT SHALL BE NOTIFIED BY THE CONTRACTOR 48 HOURS BEFORE START OF CONSTRUCTION. NO <br />WORK MAY BEGIN UNTIL THE PERMIT HAS BEEN RECEIVED AND THE CONTRACTOR MUST COMPLY WITH THE TERMS OF THEPERMIT. <br />14. ALL NON-PAVED AREAS SHALL RECEIVE A FOUR-INCH (4") LAYER OF TOPSOIL. <br />15. THE CONTRACTOR SHALL ADJUST TO GRADE ALL MANHOLE STRUCTURES AND APPURTENANCES THAT FALL WITHIN THE <br />LIMITS OF THIS CONTRACT. THE CONTRACTOR SHALL KEEP ALL SAID EXISTING UTILITIES AND THEIR APPURTENANCES <br />FREE OF DEBRIS AND OPERABLE AT ALL TIMES DURING CONSTRUCTION. ALL PROPOSED STORM SEWER WITHIN THE SITE <br />IS PRIVATE UNLESS OTHERWISE NOTED. <br />16. ALL GRADES WITHIN THE LANDSCAPED AREA SHALL NOT EXCEED 4 HORIZONTAL TO 1 VERTICAL AND HAVE A MINIMUM <br />GRADE OF 2%, UNLESS OTHERWISE NOTED. GRADED SWALES MUST HAVE A MINIMUM BOTTOM SLOPE OF 2.0%. <br />17. ALL PAVEMENT GRADES SHALL BE AS FOLLOWS IN THE DIRECTION OF FLOW: <br />ASPHALT PAVEMENT - 1.5% MINIMUM, 5% MAXIMUM <br />CONCRETE PAVEMENT - 1% MINIMUM, 5% MAXIMUM <br /> CONCRETE CURB AND GUTTER - 0.50% MINIMUM <br />EROSION CONTROL NOTES <br />1. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS INCLUDED WITH THIS PROJECT. FAILURE TO IMPLEMENT <br />THE CONTROLS AND PRACTICES OUTLINED WOULD RESULT IN VIOLATION OF THE ENVIRONMENTAL PROTECTION ACT <br />AND CLEAN WATER ACT AND IS GROUNDS FOR PENALTIES. <br />2. ESTABLISH SEDIMENT CONTROL MEASURES AT THE BEGINNING OF CONSTRUCTION AND MAINTAIN DURING THE <br />ENTIRE LENGTH OF CONSTRUCTION. AREAS WHICH ARE SUBJECT TO SEVERE EROSION AND OFF-SITE AREAS WHICH <br />ARE ESPECIALLY VULNERABLE TO DAMAGE FROM EROSION AND/OR SEDIMENTATION ARE TO BE IDENTIFIED AND <br />RECEIVE ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES AS DIRECTED BY THE OWNER'S CONSTRUCTION <br />REPRESENTATIVE. SILT FENCE SHALL BE INSTALLED PRIOR TO ANY REMOVALS. <br />3. LOCATIONS OF STABILIZED CONSTRUCTION ENTRANCES INDICATED ON PLANS ARE APPROXIMATE. CONTRACTOR <br />SHALL ADJUST LOCATION AND SIZE OF ENTRANCES TO ACCOMMODATE CONSTRUCTION VEHICLES AND ACTIVITIES. <br />4. COORDINATE ALL LAND DISTURBING ACTIVITIES AND CONDUCT SO AS TO MINIMIZE THE SIZE OF THE AREA TO BE <br />EXPOSED AT ANY ONE TIME AND MINIMIZE THE TIME OF EXPOSURE. MASS CLEARING AND GRADING OF THE ENTIRE <br />SITE SHOULD BE AVOIDED. COORDINATE ALL LAND DISTURBING ACTIVITIES SO AS TO MINIMIZE OFF-SITE <br />SEDIMENTATION DAMAGE. RESTABILIZE DISTURBED AREAS AS SOON AS POSSIBLE AFTER CONSTRUCTION IS <br />COMPLETED. <br />5. PERIODICALLY CLEAN OUT AND DISPOSE OF ALL SEDIMENT ONCE THE STORAGE CAPACITY OF THE DRAINAGE <br />FEATURE OR STRUCTURE RECEIVING THE SEDIMENT IS REDUCED BY ONE-HALF. CLEAN OUT AND DISPOSE OF ALL <br />SEDIMENT AT THE COMPLETION OF THE PROJECT. ALL STREETS IN AND ADJACENT TO THE PROJECT SHALL REMAIN <br />CLEAN AND PASSABLE AT ALL TIMES. ANY SEDIMENT OR DEBRIS SHALL BE REMOVED WITHIN 24 HOURS, OR AS <br />OFTEN AS NEEDED TO ENSURE PUBLIC SAFETY. <br />6. INLET PROTECTION WILL BE INSTALLED AT ALL CATCH BASINS WITHIN THE PROJECT AREA. THE CONTRACTOR SHALL <br />PROVIDE APPROPRIATE EROSION CONTROL DEVICES FOR STOCKPILE AREAS, INLETS, AND DITCHES MUST BE <br />STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO ANY <br />SURFACE WATER. STABILIZATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO SURFACE WATER. <br />7. REMOVE THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AND VERIFY THE CLEANING OUT OF ALL <br />STORM DRAINAGE STRUCTURES, INCLUDING FLUMES, PIPES, AND DITCHES ONCE FINAL STABILIZATION HAS <br />OCCURRED. <br />8. PIPE OUTLETS NEED TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS OF GOING ONLINE. <br />9. WHEN DEWATERING IS REQUIRED, CONTRACTOR MUST SUBMIT A DEWATERING PLAN TO THE ENGINEER FOR <br />APPROVAL AT LEAST 10 DAYS PRIOR TO THE PROPOSED DEWATERING ACTIVITY. THE PLAN MUST INCLUDE A <br />DEWATERING SYSTEM PRIOR TO DISCHARGING INTO RECEIVING WATER. THE DEWATERING PLAN MUST ENSURE <br />THAT THE DISCHARGE WATER IS FREE OF SEDIMENT AND TURBID WATER. <br />10. ADDITIONAL EROSION AND SEDIMENT CONTROLS MAY BE ADDED DURING ANY PHASE OF CONSTRUCTION AS <br />DIRECTED BY THE ENGINEER. <br />11. THE CONTRACTOR SHALL PROVIDE PERIMETER CONTROL DAY - TO - DAY AT DISTURBED, UNSTABILIZED AREAS <br />WHERE EROSION OR SEDIMENTATION COULD BE A PROBLEM. THE ENGINEER SHALL DIRECT THE CONTRACTOR AS <br />TO WHERE PLACEMENT OF PERIMETER CONTROL WILL BE REQUIRED. <br />12. THE CONTRACTOR MUST COMPLY WITH ALL NOISE AND DUST CONTROL ORDINANCES OF THE CITY. <br />PER STANDARD DETAILSINLET PROTECTION <br />TEMPORARY EROSION AND <br />SEDIMENT CONTROL PROVISIONS <br />WEEKLY INSPECTION & AFTER EACHRAIN EVENT-CORRECTIVE WORK ASNECESSARY <br />EROSION & SEDIMENTCONTROL MAINTENANCE <br />ALSO SEE INSPECTION AND MAINTENANCE REQUIREMENTSCONTAINED IN GENERAL PROVISIONS OF SWPPP. <br />(LESS THAN 4:1) - TYPE 1 MULCH, DISCANCHORED. (GREATER THAN 4:1) -STABALIZED FIBER MATRIX @ 3,000 lbs/ac. IFBLANKET CANNOT BE INSTALLED WITHIN 14DAYS. <br />SCHEDULE <br />ALSO SEE INSPECTION AND MAINTENANCE REQUIREMENTS CONTAINED INGENERAL PROVISIONS OF SWPPP. <br />PERMANENT EROSION AND SEDIMENT <br />CONTROL PROVISIONS <br />PERMANENT COVER - ALLOTHER DISTURBED AREAS <br />TYPE 1 STRAW MULCH WITH DISC ANCHORAND STATE SEED MIX 25-131 (LOWMAINTENANCE TURF GRASS STABILIZATION)@ 220 lbs/ac WITH FERTILIZER TYPE 3 (SLOWRELEASE; 22-5-10) @ 350 lbs/ac. UNLESSBLANKET IS SPECIFIED ON PLANS. <br />OR <br />SOD WITH FERTILIZER TYPE 3 (SLOWRELEASE; 22-5-10) @ 200 lbs/ac <br />STORMWATER PONDSLOPE <br />EROSION CONTROL BLANKETCATEGORY 3N/2S (WOOD FIBER) WITHSTATE SEED MIX 33-261 @ 35 lbs/ac.WITH TYPE 4 FERTILIZER (NATURALBASED; 18-1-8) @ 150 lbs/ac. <br />PERMANENT COVER -BLANKETED AREAS <br />EROSION CONTROL BLANKETCATEGORY 3N/2S (WOOD FIBER) WITHSTATE SEED MIX 35-241 @ 36.5 lbs/acWITH TYPE 4 FERTILIZER (NATURALBASED; 18-1-8) @ 150 lbs/ac. <br />EROSION CONTROL BLANKET CATEGORY3N/2S (WOOD FIBER)EROSION CONTROLBLANKET <br />ITEM <br />PRIOR TO CONSTRUCTION ANDIMMEDIATELY AS DICTATED <br />SILT FENCE, PERIMETERCONTROLS <br />MnDOT SEED MIX 21-111 (SPEC 3876)100 lbs/ac.COVER CROPS <br />TABULATION OF PROJECT AREAS <br />IMPERVIOUS BEFORE DEVELOPMENT <br />IMPERVIOUS AFTER DEVELOPMENT <br />TOTAL PROJECT AREA (BOUNDARY)21.4 ACRES <br />0 ACRES <br />11.2 ACRES <br />EARTHWORK <br />UNADJUSTED FILL <br />NET CUT <br />UNADJUSTED CUT <br />THIS IS AN ENGINEER'S ESTIMATE AND DOES NOT INCLUDEHOLD DOWNS OR ANY REQUIRED SOILS CORRECTIONS. <br />CONTRACTOR RESPONSIBLE FOR VERIFYING ACTUALREQUIRED EARTHWORK FOR SITE. <br />#### CY <br />#### CY <br />#### CY