My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
06-08-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2022 6:17:58 PM
Creation date
7/27/2022 6:04:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
73495086v3 <br /> <br /> <br /> 42 <br /> <br />(a) The Controlling Person shall approve Requisitions for funds for materials, <br />furnishings, fixtures, machinery or equipment not yet incorporated into the Improvements, <br />provided that any such disbursement shall be subject to and shall be contingent upon the Controlling <br />Person’s receiving satisfactory evidence that: <br />(1) such materials are components in a form ready for incorporation <br />into the Improvements and shall be so incorporated within a period of thirty (30) <br />days; and <br />(2) such materials are stored at the Project Facilities, or at such other <br />site as the Controlling Person shall approve, and are insured and protected against <br />theft and damage. <br />(b) Within five (5) days after receiving notice from the Controlling Person (or the <br />Engineering Consultant), the Borrower will commence or cause to be commenced the removal of <br />all materials, whether worked or unworked, and all portions of the construction which the <br />Controlling Person (or the Engineering Consultant) may condemn as failing in a substantial way to <br />conform with the Plans and Specifications, and will prosecute diligently or cause to be prosecuted <br />diligently such removal. The Borrower further agrees to make good all portions of the construction <br />and other materials damaged by such removal. <br />Section 9.9 Cost Overruns and Savings. <br />(a) If the Borrower becomes aware of any change in the costs of the Work which will <br />increase or decrease the projection of the costs reflected on the Development Budget by $50,000 <br />or more, the Borrower shall immediately notify the Controlling Person in writing and promptly <br />submit to the Controlling Person for its approval a revised Development Budget. If the Controlling <br />Person otherwise becomes aware of any such change in costs of the Work, the Controlling Person <br />shall have the right to prepare and to authorize disbursements on the basis of a revised Development <br />Budget. <br />(b) If the revised Development Budget indicates an increase in costs of the Work for <br />the Project Facilities (in excess of the aggregate contingency amount and savings), no further <br />Requisitions for the Work at the Project Facilities need be approved by the Controlling Person <br />unless and until the Borrower has deposited with the Funding Lender (or the Fiscal Agent at the <br />direction of the Funding Lender) any required funds necessary to cause the amount remaining on <br />deposit with the Funding Lender or the Fiscal Agent (or available for draw under the Funding Loan) <br />and any Required Equity Funds yet to be deposited with the Funding Lender to be sufficient to <br />complete fully the construction of the Improvements in accordance with the Plans and <br />Specifications to the extent applicable, and to pay all other Projected costs in connection with the <br />Work. <br />(c) If the revised schedule indicates a decrease in costs of the Work for the Project <br />Facilities, no savings may be reallocated by the Borrower unless and until the Borrower has <br />furnished the Controlling Person and the Engineering Consultant with evidence satisfactory to them <br />that the labor performed and materials supplied in connection with such line item of costs have <br />been satisfactorily completed and paid for in full. At such time, such savings may be reallocated <br />by the Borrower, with the consent of the Controlling Person, to other line items. <br />(d) The Governmental Lender does not make any warranty, either express or implied, <br />that the moneys paid into the Project Fund and available for payment of the Project Costs will be
The URL can be used to link to this page
Your browser does not support the video tag.