Laserfiche WebLink
3-AG <br />1-AF <br />5-PO <br />11-CA <br />6-VD <br />8-SA <br />TURF RESTORATION - CONTRACTOR <br />TO STABILIZE ALL DISTURBED AREAS <br />ON NORTH SIDE OF WALK WITH 4" <br />TOPSOIL BORROW PER MNDOT <br />SPECIFICATION 3877, EROSION <br />CONTROL BLANKET (FUTERRA F4 <br />NETLESS), AND MNDOT SEED MIX <br />35-241. <br />NODE 1 <br />NODE 215'-0"GENERAL NOTES: <br />1. PROVIDE PLANT MATERIAL OF SIZE, GENUS, SPECIES, AND <br />VARIETY SHOWN AND COMPLYING WITH REQUIREMENTS OF <br />2014 ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK." <br />ALL PLANTING MATERIAL SUBJECT TO APPROVAL BY OWNER <br />OR OWNER'S REPRESENTATIVE. <br />2. PLANT SCHEDULES: ALL TREES AND SHRUBS ARE LISTED IN <br />THE PLANT SCHEDULE. IF THERE IS A CONFLICT BETWEEN THE <br />QUANTITIES SHOWN ON THE PLAN DRAWING AND THE <br />QUANTITIES SHOWN IN THE PLANT SCHEDULE, THE PLAN <br />QUANTITIES SHALL PREVAIL. <br />3. PLANT SHRUBS IN ONE CONTINUOUS BED. <br />4. ALL PLANTING BEDS SHALL BE PREPARED WITH LOAM <br />TOPSOIL BORROW PER MNDOT SPECIFICATION 3877 TO 18" <br />DEPTH AND SHREDDED HARDWOOD MULCH PER MNDOT <br />SPECIFICATION 2575.211 (MULCH MATERIAL TYPE 6) TO 3" <br />DEPTH. <br />5. TOPSOIL AND MULCH NECESSARY FOR TREE PLANTINGS <br />INCIDENTAL TO TREES. <br />6. FINISHED PLANTING BEDS SHALL BE FLUSH WITH <br />SURROUNDING PAVEMENT. <br />7. ALL AREAS DISTURBED BY CONSTRUCTION, NOT INCLUDEING <br />THE CONC. WALK AND SHRUB PLANTING AREAS TO BE <br />FINISHED WITH 4" TOPSOIL, EROSION CONTROL BLANKET <br />(FUTERRA F4 NETLESS), AND MNDOT SEED MIX 35-241. (TURF <br />ESTABLISHMENT) <br />PLANTING PLAN <br />Gervais Mill Park Improvements <br />3 <br />3 <br />0 <br />' <br />- <br />0 <br />" <br />TURF RESTORATION <br />BETWEEN CONC. <br />WALK AND ROADWAY <br />- SEE NOTE.