Laserfiche WebLink
REVISION SUMMARYDATEDESCRIPTIONL1.1LANDSCAPE PLANNOTES & DETAILS............Civil Engineering Surveying Landscape Architecture5000 Glenwood AvenueGolden Valley, MN 55422civilsitegroup.com 612-615-0060COPYRIGHT CIVIL SITE GROUP INC.cLAPHAM HICKEY <br />3250 SPRUCE STREET, LITTLE CANADA, MN 55117 <br />3250 SPRUCE STREET, LITTLE CANADA, MN 55117 <br />LAPHAM HICKEY STEEL <br />PROJECT <br />P <br />R <br />E <br />L <br />I <br />M <br />I <br />N <br />A <br />R <br />Y <br />: <br />N <br />O <br />T <br /> <br />F <br />O <br />R <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />NISSUE/SUBMITTAL SUMMARYDATEDESCRIPTION............PROJECT NUMBER:16074.01............05/27/22CITY SUBMITTALDRAWN BY:REVIEWED BY:FJMP..............202244263Matthew R. PavekLICENSE NO.DATEI HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MY DIRECTSUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OFMINNESOTA.05/27/221.ENTIRE SITE SHALL BE FULLY IRRIGATED. THE CONTRACTOR SHALL SUBMIT IRRIGATION SHOP DRAWINGS FOR REVIEWAND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.2.SEE MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS FOR IRRIGATION WATER, METER, AND POWERCONNECTIONS.3.CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND/ABOVE GROUND FACILITIES PRIOR TO ANYEXCAVATION/INSTALLATION. ANY DAMAGE TO UNDERGROUND/ABOVE GROUND FACILITIES SHALL BE THERESPONSIBILITY OF THE CONTRACTOR AND COSTS ASSOCIATED WITH CORRECTING DAMAGES SHALL BE BORNEENTIRELY BY THE CONTRACTOR.4.SERVICE EQUIPMENT AND INSTALLATION SHALL BE PER LOCAL UTILITY COMPANY STANDARDS AND SHALL BE PERNATIONAL AND LOCAL CODES. EXACT LOCATION OF SERVICE EQUIPMENT SHALL BE COORDINATED WITH THELANDSCAPE ARCHITECT OR EQUIVALENT AT THE JOB SITE.5.CONTRACTOR SHALL COORDINATE WITH LOCAL UTILITY COMPANY FOR THE PROPOSED ELECTRICAL SERVICE ANDMETERING FACILITIES.6.IRRIGATION WATER LINE CONNECTION SIZE IS 1-12" AT BUILDING. VERIFY WITH MECHANICAL PLANS.COVAGE.7.ALL MAIN LINES SHALL BE 18" BELOW FINISHED GRADE.8.ALL LATERAL LINES SHALL BE 12" BELLOW FINISHED GRADE.9.ALL EXPOSED PVC RISERS, IF ANY, SHALL BE GRAY IN COLOR.10.CONTRACTOR SHALL LAY ALL SLEEVES AND CONDUIT AT 2'-0" BELOW THE FINISHED GRADE OF THE TOP OF PAVEMENT.EXTEND SLEEVES TO 2'-0" BEYOND PAVEMENT.11.CONTRACTOR SHALL MARK THE LOCATION OF ALL SLEEVES AND CONDUIT WITH THE SLEEVING MATERIAL "ELLED" TO2'-0" ABOVE FINISHED GRADE AND CAPPED.12.FABRICATE ALL PIPE TO MANUFACTURE'S SPECIFICATIONS WITH CLEAN AND SQUARE CUT JOINTS. USE QUALITY GRADEPRIMER AND SOLVENT CEMENT FORMULATED FOR INTENDED TYPE OF CONNECTION.13.BACKFILL ALL TRENCHES WITH SOIL FREE OF SHARP OBJECTS AND DEBRIS.14.ALL VALVE BOXES AND COVERS SHALL BE BLACK IN COLOR.15.GROUP VALVE BOXES TOGETHER FOR EASE WHEN SERVICE IS REQUIRED. LOCATE IN PLANT BED AREAS WHENEVERPOSSIBLE.16.IRRIGATION CONTROLLER LOCATION SHALL BE VERIFIED ON-SITE WITH OWNER'S REPRESENTATIVE.17.CONTROL WIRES: 14 GAUGE DIRECT BURIAL, SOLID COPPER IRRIGATION WIRE. RUN UNDER MAIN LINE. USEMOISTURE-PROOF SPLICES AND SPLICE ONLY AT VALVES OR PULL BOXES. RUN SEPARATE HOT AND COMMON WIRE TOEACH VALVE AND ONE (1) SPARE WIRE AND GROUND TO FURTHEST VALVE FROM CONTROLLER. LABEL OR COLOR CODEALL WIRES.18.AVOID OVER SPRAY ON BUILDINGS, PAVEMENT, WALLS AND ROADWAYS BY INDIVIDUALLY ADJUSTING RADIUS OR ARCON SPRINKLER HEADS AND FLOW CONTROL ON AUTOMATIC VALVE.19.ADJUST PRESSURE REGULATING VALVES FOR OPTIMUM PRESSURE ON SITE.20.USE SCREENS ON ALL HEADS.21.A SET OF AS-BUILT DRAWINGS SHALL BE MAINTAINED ON-SITE AT ALL TIMES IN AN UPDATED CONDITION.22.ALL PIPE 3" AND OVER SHALL HAVE THRUST BLOCKING AT EACH TURN.23.ALL AUTOMATIC REMOTE CONTROL VALVES WILL HAVE 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL UNDERNEATHVALVE AND VALVE BOX. GRAVEL SHALL EXTENT 3" BEYOND PERIMETER OF VALVE BOX.24.THERE SHALL BE 3" MINIMUM SPACE BETWEEN BOTTOM OF VALVE BOX COVER AND TOP OF VALVE STRUCTURE.IRRIGATION NOTES:FACE OF BUILDING, WALL, OR STRUCTUREMIN. 3" LAYER OF ROCK MULCH AS SPECIFIED. PROVIDE SAMPLE TOLANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATIONFINISHED GRADECOMPACTED SUBGRADEWATER PERMEABLE GEOTEXTILE FABRIC AS SPECIFIED18" - VERIFY W/ PLANAGGREGATE MAINTANENCE STRIPN T SSTAKED LANDSCAPE EDGER AS SPECIFIED, SEE MANUFACTURER'SINSTRUCTIONS AND SPECS. FOR INSTALLATION AND PLACEMENTSLOPE - MIN. 2%, MAX. 5:1VERIFY W/ GRADING PLAN1Know what'sbelow.before you dig.CallRPERENNIAL BED PLANTINGN T SPLANT TOP OF ROOTBALL 1-2" ABOVE ABOVESURROUNDING GRADEROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TOENSURE PROPER BACKFILL-TO-ROOT CONTACTSLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OFPLANTING BEDEXISTING GRADEROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPENOTES AND PLAN NOTES FOR MULCH TYPE. KEEPMULCH MIN. 2" FROM PLANT STEMBACKFILL AS PER SPECIFICATIONDO NOT EXCAVATE BELOW ROOTBALL.SIZE VARIESSEE LANDSCAPE PLANMODIFY EXCAVATION BASED ON LOCATION OF PLANTMATERIAL AND DESIGN OF BEDS OR OVERALL PLANTPLACEMENT4DECIDUOUS & CONIFEROUS SHRUB PLANTINGN T SPRUNE AS FIELD DIRECTED BY THE LANDSCAPEARCHITECT TO IMPROVE APPEARANCE (RETAINNORMAL SHAPE FOR SPECIES)PLANT TOP OF ROOTBALL 1-2" ABOVE ABOVESURROUNDING GRADEROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TOENSURE PROPER BACKFILL-TO-ROOT CONTACTSLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OFPLANTING BEDEXISTING GRADEROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPENOTES AND PLAN NOTES FOR MULCH TYPE. KEEPMULCH MIN. 2" FROM PLANT TRUNKBACKFILL AS PER SPECIFICATIONDO NOT EXCAVATE BELOW ROOTBALL.THREE TIMES WIDTHOF ROOTBALLRULE OF THUMB - MODIFY EXCAVATION BASED ONLOCATION OF PLANT MATERIAL AND DESIGN OF BEDSOR OVERALL PLANT PLACEMENT3THREE TIMES WIDTHOF ROOTBALLDECIDUOUS & CONIFEROUS TREE PLANTINGN T SPRUNE AS FIELD DIRECTED BY THE LANDSCAPEARCHITECT TO IMPROVE APPEARANCE (RETAINNORMAL TREE SHAPE)THREE 2"X4"X8' WOODEN STAKES, STAINED BROWNWITH TWO STRANDS OF WIRE TWISTED TOGETHER.STAKES SHALL BE PLACED AT 120° TO ONE ANOTHER.WIRE SHALL BE THREADED THROUGH NYLONSTRAPPING WITH GROMMETS. ALTERNATE STABILIZINGMETHODS MAY BE PROPOSED BY CONTRACTOR.TRUNK FLARE JUNCTION: PLANT TREE 1"-2" ABOVEEXISTING GRADEMULCH TO OUTER EDGE OF SAUCER OR TO EDGE OFPLANTING BED, IF APPLICABLE. ROCK OR ORGANICMULCH, SEE GENERAL LANDSCAPE NOTES AND PLANNOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROMPLANT TRUNKEXISTING GRADECUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOTBALL. IF NON-BIODEGRADABLE, REMOVE COMPLETELYSLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OFPLANTING BEDBACKFILL AS SPECIFIEDCOMPACT BOTTOM OF PIT, TYP.RULE OF THUMB - MODIFY EXCAVATION BASED ONLOCATION OF PLANT MATERIAL AND DESIGN OF BEDSOR OVERALL PLANT PLACEMENT2PLANT SCHEDULE - ENTIRE SITESYMQUANT.COMMON NAMEBOTANICAL NAMESIZECOMMENTSDECIDUOUS TREESNWM2NORTHWOOD RED MAPLEAcer rubrum 'Northwood'2.5" CAL.B&BSTRAIGHT LEADER. FULL FORMHB1HACKBERRYCeltis occidentalis2.5" CAL.B&BSTRAIGHT LEADER. FULL FORMRB7RIVER BIRCHBetula nigraEVERGREEN TREESBHS4BLACK HILLS SPRUCEPicea glauca 'Densata'6' ht.B&BSTRAIGHT LEADER. FULL FORMWP3WHITE PINEPinus strobus6' ht.B&BSTRAIGHT LEADER. FULL FORMSHRUBS - CONIFEROUS & EVERGREENCEV14COMPACT EUROPEAN VIBURNUMViburnum opulus 'Compactum'36" HT.CONT.FPR8PAVEMENT FOXI ROSERosa 'Foxi Pavement'24" HT.CONT.MYJ10MANEY JUNIPERJuniperus chinensis 'Maney'24" HT.CONT.PERENNIALS & GRASSESKFG38KARL FOERSTER GRASSCalamagrostis x acutiflora "Karl Foerster"#2CONT.PMD6PARDON ME DAYLILLYHemerocallis 'Pardon Me'#2CONT.SEE SHEET L1.0 FOR LEGEND