My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2022 Workshop Packet
>
City Council Packets
>
2020-2029
>
2022
>
09-14-2022 Workshop Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2022 7:58:52 PM
Creation date
9/21/2022 7:57:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />OPERATING TAX LEVY <br />General Fund $3,479,210 $3,869,208 $389,998 11.21% $3,884,944 $405,734 11.66% <br />Fire Equipment 160,000 160,000 $0 0.00% 160,000 $0 0.00% <br />Infrastructure Fund 122,200 160,000 <br />$37,800 30.93%160,000 $37,800 30.93% <br />Total $3,761,410 $4,189,208 $427,798 11.37%$4,204,944 $443,534 11.79% <br />2023 Proposed Gross Levy Compared with 2022 <br />3.30% COLA 4.70% COLA2022 <br />Certified <br />Levy 2023 Levy $ Change <br />Fund <br />% Change 2023 Levy $ Change % Change <br /> <br />The 2022 Certified levy was an increase of 5% from 2021. As noted above a COLA of 3.30% will result in an <br />11.37% levy increase and a COLA of 4.70% will result in an 11.79% levy increase. Please note that the levy for <br />the Infrastructure Fund (Fund 400) has been increased from $122,200 in 2022 to $160,000 in 2023. This proposed <br />increase would match levy for the Fire Equipment Fund (Fund 457) and begin to address future capital <br />expenditure needs. <br />For your information, to change the levy by approximately 1%, a change in the operating budget will need to be <br />made in the amount of approximately $40,000. <br />For each COLA rate adjustment decrease of .50%, the reduction is approximately $9,000 in the General Fund. <br /> <br />TAX CAPACITY RATES <br />General Fund 23.634 23.690 0.06 0.24% 23.799 0.17 0.70% <br />Fire Equipment 1.087 0.980 (0.11)‐9.87% 0.980 (0.11)‐9.82% <br />Infrastructure <br />Fund 0.830 0.980 0.15 18.01% 0.980 0.15 18.08% <br />Total 25.551 25.649 0.10 0.38%25.759 0.21 0.82% <br />2023 Proposed Tax Capacity Rates Commpared with 2022 <br />2022 <br />Rate <br />3.30% COLA 4.70% COLA <br />2023 Rate Change % Change 2023 Rate Change % Change <br />Fund <br /> <br />The 2022 Tax Rate was a 6.54 % increase from 2021. Please note that both 2023 scenarios will result in a minimal <br />tax rate increase ranging 0.38% and 0.82%, when compared with the 2022 tax rate. <br />The Ramsey County Finance Division provided preliminary values for Tax Capacity and Fiscal Disparities on, <br />August 30th. These numbers were used to calculate the Tax Capacity Rates noted in the above table. Even thou <br />the numbers provided are preliminary, staff does not expect large differences from the information presented <br />above once the final values are provided.
The URL can be used to link to this page
Your browser does not support the video tag.