My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-12-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
10-12-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2022 5:09:22 PM
Creation date
11/1/2022 4:57:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. INTRODUCTION <br />2023 Street Improvements (Sunset Court, Sunrise Dr, Spruce St) ǀ 0N1.127995 Page 1 <br />I. INTRODUCTION <br />The City of Little Canada is planning rehabilitation efforts on several residential , collector, and <br />commercial streets during the 2023 construction season, in accordance with the Capital <br />Improvement Plan. The City’s 2023 work plan includes proposed street and utility improvements to <br />the following streets: <br />1. Sunset Court <br />2. Sunrise Drive <br />3. Spruce Street <br />4. Twin Lake Boulevard (detailed in a separate report) <br />Refer to Figure 1 in Appendix A for a depiction of the project areas. <br />See Figures 2A, 2B, and 2C in Appendix B for maps of the existing conditions on each street, <br />respectively. <br />This report will review the existing conditions of each defined project area and discuss, in detail, <br />the proposed improvements. The report will also provide preliminary cost estimates for the <br />proposed improvements with financing for the projects coming from a combination of special <br />assessments and the City’s Infrastructure Capital Improvement Fund. <br />Informational meetings for each project area were held with affected property owners. There, the <br />proposed project scope, costs, and funding sources were discussed with the opportunity for property <br />owners to comment on the project and ask questions. The Sunrise Drive and Sunset Court projects <br />had a joint informational meeting. Residents had general questions for project staff. A separate <br />meeting was held with Spruce Street owners; again, there were limited questions for project staff <br />and they appreciated being informed. <br />If the City elects to proceed with the proposed street and utility improvements described in this <br />report, it is anticipated that construction would begin in 2023 as detailed in the project schedule <br />found on Page 11. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.