Laserfiche WebLink
<br />Prepared by: Bolton & Menk, Inc. SUNSET COURT <br />2023 Street Improvements (Sunset Court, Sunrise Dr, Spruce St) ǀ 0N1.127995 Page 3 <br />improvements to ensure they outlast the pavement improvements proposed in this <br />report. <br /> Proposed Improvements <br />1. Street Improvements <br />Based on the pavement age and current distresses, the proposed street improvement for <br />Sunset Court is a full depth reclamation (FDR). <br />Current pavement distress patterns indicate surface-level wear but no significant <br />deterioration of the roadway base. Full depth reclamation is a cost-effective <br />rehabilitation method that grinds the top 10-12 inches of existing bituminous pavement <br />and aggregate base into a new aggregate that creates an improved foundation for 4 <br />inches of new bituminous pavement. <br />In addition to pavement reclamation, curb and gutter that is cracked, weathered, or <br />heaved will be removed and replaced with new curb and gutter. This improves <br />stormwater conveyance to catch basins and prevents the intrusion of stormwater into <br />the roadway base. <br />2. Watermain Improvements <br />The existing ductile iron watermain is in good condition and is proposed to be left in <br />place. However, inspection and replacement of existing bolts at gate valves, hydrants, <br />and mainline fittings is proposed. These features are typically the first to fail in the <br />water system and proactive replacement of these bolts would limit the number of leaks <br />and watermain breaks <br />3. Sanitary Sewer Improvements <br />The existing sanitary sewer network is in good condition and is proposed to be left in <br />place. However, two structures may require some minor repairs to inverts and <br />doghouses. Structures that receive new castings will also be fitted with exterior <br />chimney seals to prevent inflow and infiltration (I/I). <br />4. Storm Sewer Improvements <br />Overall, the existing storm sewer system is in good condition and proposed to be left in <br />place. However, it is proposed that a few structures receive new castings and/or lids. <br />Remaining catch basins will receive inflow and infiltration (I/I) barriers along with <br />minor repairs to inverts and doghouses. <br />5. Water Quality Improvements <br />Rehabilitation of Sunset Court will not trigger Ramsey-Washington Metro Watershed <br />District (RWMWD) stormwater improvements. However, residents will be given the <br />opportunity during final design to opt into the City’s rain garden program. Any <br />raingardens installed would be credited by the watershed towards other or future street <br />improvement projects that trigger stormwater improvements.