My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-26-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
10-26-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2022 5:09:22 PM
Creation date
11/1/2022 5:02:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br />following year, completion of the work described in this paragraph shall be completed by the <br />BUILDER by June 15; for a lot where the Certificate of Occupancy is issued between May 1 <br />and July 31, completion of the work described in this paragraph shall be completed by the <br />BUILDER by the September 15. Notwithstanding anything to the contrary in this <br />DEVELOPMENT AGREEMENT, it is agreed that in lieu of the BUILDER installing sod on <br />each lot, the BUILDER may provide to a lot owner a certificate that entitles the lot owner to <br />have sod delivered to that lot at the owner's request for installation by the lot owner. <br /> <br />4.10. BOULEVARD AND AREA RESTORATION. The DEVELOPER shall sod all <br />boulevards within 30 days of the completion of street related improvements and restore all other <br />areas disturbed by the development grading operation in accordance with the approved erosion <br />control plan, over the entire FINAL PLAT. Upon request of the CITY ENGINEER, the <br />DEVELOPER shall remove the silt fences after grading and construction have occurred. <br /> <br />4.11. LOT CORNER MONUMENTS. The DEVELOPER shall install all subdivision <br />lot corner monumentation within one year from the date of recording the FINAL PLAT, or the <br />monumentation shall be installed on a per lot basis at the time the building permit for the subject <br />lot is issued, whichever occurs first. At the end of the one-year period from recording of this <br />DEVELOPMENT AGREEMENT, the DEVELOPER shall submit to CITY ENGINEER <br />written verification by a registered land surveyor that the required monuments have been <br />installed throughout the FINAL PLAT. <br /> <br />4.12. STREET MAINTENANCE, RESTORATION, ACCESS AND REPAIR <br />DURING CONSTRUCTION. The DEVELOPER shall clear, on a daily basis, any soil, earth <br />or debris from the streets and wetlands within or adjacent to the FINAL PLAT resulting from <br />the grading or building on the land within the FINAL PLAT by the DEVELOPER or its agents, <br />and shall restore to the CITY's specifications any gravel base contaminated by mixing <br />construction or excavation debris, or earth in it, and repair to the CITY's specifications any <br />damage to bituminous surfacing resulting from the use of construction equipment. <br /> <br />Furthermore, the DEVELOPER shall maintain reasonable access to any occupied <br />buildings within the FINAL PLAT, including necessary street maintenance such as grading, <br />graveling, patching and snow removal prior to permanent street surfacing. The DEVELOPER <br />agrees to perform and assume all responsibilities relating to snow removal and ice control, if <br />the streets have not been accepted for winter maintenance by the CITY ENGINEER by October <br />15, or later if approved by the CITY's Public Works Director. Completion of the work described <br />in the paragraph shall be completed within fifteen (15) days after notice by the CITY to the <br />DEVELOPER that repair or restoration is required. Saturday working hours for the site <br />grading/street and utility construction should start at 9:00 AM. <br /> <br />4.13. OCCUPANCY AND ACCESS. No building permit for any lot shall be issued <br />until the DEVELOPER has constructed a temporary access consisting of a bituminous surface <br />base that is acceptable in design by the CITY and the conditions on Exhibit D have been <br />followed. Three building permits for three buildings may be issued prior to roadway Class V <br />gravel base and utilities being installed, as approved by the City's Building Official and Fire <br />Marshal. <br /> <br />Except for models, no temporary certificate of occupancy for any lot shall be issued <br />until the DEVELOPER has constructed a temporary bituminous roadway that is acceptable in <br />design by the CITY and water and sanitary sewer improvements are available for use. No <br />certificate of occupancy for any lot within the FINAL PLAT shall be issued until all water and <br />sanitary sewer improvements are available for use and the first lift of street pavement has been
The URL can be used to link to this page
Your browser does not support the video tag.