My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-26-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
10-26-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2022 5:09:22 PM
Creation date
11/1/2022 5:02:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GRAD-NOTE-PH 1-PLAN.dwg 10/24/2022 6:34:16 PMCG-104 <br />AS SHOWN LCW <br />KWHLCW/SJH <br />SCALE: <br />PLAN BY: <br />DESIGN BY: <br />CHECK BY: <br />SHEET <br />WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF10/21/202259709GRADING <br />NOTES <br />GRADING NOTES <br />1. RELOCATE BENCHMARKS AS NECESSARY WITH NEW BENCHMARK LOCATIONS WITHIN A TOLERANCE OF 0.010 VERTICAL FEET. <br />2. SLAB ON GRADE (SOG) ELEVATIONS, AS INDICATED ON THE CIVIL DRAWINGS, CORRESPONDS TO ELEVATION 100'-0" ON ALL OTHER DISCIPLINE SHEETS <br />(ARCHITECTURAL, STRUCTURAL, ETC). SLAB ON GRADE ELEVATIONS ARE ALSO THE LOW FLOOR ELEVATIONS FOR ALL BUILDINGS. <br />3. THE PROPOSED GRADES SHOWN ON THE GRADING PLAN ARE FINISHED GRADES. SPOT ELEVATIONS ALONG CURB LINES REPRESENT THE FLOWLINE <br />UNLESS OTHERWISE NOTED. <br />4. CATCH BASINS AT LOW POINTS SHALL HAVE ADDITIONAL 2" CASTING SUMP BELOW SPOT GRADES SHOWN ON THE PLAN. <br />5. GRADING ACTIVITY WHICH BLOCKS TRAFFIC OF ANY STREET, ALLEY, OR DRIVE IS SUBJECT TO APPROVAL BY THE CITY. <br />6. CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE ENGINEER AND OWNER IF CONTAMINANTS ARE FOUND IN THE EXISTING SOILS. <br />7. SIDEWALK AND BITUMINOUS TRAIL CROSS-SLOPES SHALL NOT EXCEED 2.0% AND LONGITUDINAL SLOPES SHALL NOT EXCEED 5.0%. <br />8. STRIP TOPSOIL PRIOR TO PLACING FILL. <br />9. IN AREAS WHERE NEW FILL IS TO BE PLACED ON SLOPING GROUND, BENCHING THE SURFACE SHALL BE COMPLETED PRIOR TO PLACING THE FILL. <br />BENCHING SHALL BE COMPLETED WHERE SLOPES ARE STEEPER THAN 4:1 (HORIZONTAL:VERTICAL). <br />10. PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREA. DO NOT ALLOW WATER TO POND IN EXCAVATION AREAS, AND MAINTAIN <br />ALL EXISTING DRAINAGE PATTERNS. <br />11. UNLESS OTHERWISE NOTED, FINISH GRADE SHALL BE SIX INCHES BELOW FINISHED FLOOR IN NON-PAVED AREAS. <br />12. THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH ALL OSHA REGULATIONS IN THE EXECUTION OF WORK UNDER THIS CONTRACT. <br />13. THE CONTRACTOR SHALL APPLY FOR A CITY GRADING PERMIT BEFORE STARTING WORK. THE INSPECTOR AND THE CITY PUBLIC WORKS DEPARTMENT <br />SHALL BE NOTIFIED BY THE CONTRACTOR 48 HOURS BEFORE START OF CONSTRUCTION. NO WORK MAY BEGIN UNTIL THE PERMIT HAS BEEN RECEIVED <br />AND THE CONTRACTOR MUST COMPLY WITH THE TERMS OF THE PERMIT. <br />14. ALL NON-PAVED AREAS SHALL RECEIVE A SIX-INCH (6") LAYER OF TOPSOIL. INSTALL SEED ACCORDING TO THE OVERALL SEEDING PLAN. <br />15. THE CONTRACTOR SHALL ADJUST TO GRADE ALL MANHOLE STRUCTURES AND APPURTENANCES THAT FALL WITHIN THE LIMITS OF THIS CONTRACT. <br />THE CONTRACTOR SHALL KEEP ALL SAID EXISTING UTILITIES AND THEIR APPURTENANCES FREE OF DEBRIS AND OPERABLE AT ALL TIMES DURING <br />CONSTRUCTION. <br />16. ALL GRADES WITHIN THE LANDSCAPED AREA SHALL NOT EXCEED 4 HORIZONTAL TO 1 VERTICAL AND HAVE A MINIMUM GRADE OF 2%, UNLESS <br />OTHERWISE NOTED. GRADED SWALES MUST HAVE A MINIMUM BOTTOM SLOPE OF 2.0% LONGITUDINALLY. <br />17. ALL PAVEMENT GRADES SHALL BE AS FOLLOWS IN THE DIRECTION OF FLOW: <br />ASPHALT PAVEMENT - 1.5% MINIMUM, 5% MAXIMUM <br />CONCRETE PAVEMENT - 1% MINIMUM, 5% MAXIMUM <br /> CONCRETE CURB AND GUTTER - 0.50% MINIMUM <br />18. MASS GRADING OPERATIONS BEYOND PHASE 1 BOUNDARY SHALL ALSO COMPLY WITH THE FOLLOWING: <br />18.1. CONTRACTOR TO GRADE TO THE BOTTOM OF STREET SECTION AND BUILDING PAD HOLD-DOWNS. <br />18.2. CONTRACTOR TO MAINTAIN POSITIVE DRAINAGE IN THE INTERIM FOR ALL FUTURE LOW POINT LOCATIONS WHERE STORM SEWER IS NOT BEING <br />BUILT IN THIS PHASE. <br />19. CONCRETE WASHOUT IS NOT PERMITTED ONSITE. <br />EROSION CONTROL NOTES <br />1. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS INCLUDED WITH THIS PROJECT. FAILURE TO IMPLEMENT THE CONTROLS AND PRACTICES <br />OUTLINED WOULD RESULT IN VIOLATION OF THE ENVIRONMENTAL PROTECTION ACT AND CLEAN WATER ACT AND IS GROUNDS FOR PENALTIES. <br />CONTRACTOR IS RESPONSIBLE FOR PAYMENT OF ALL FINES AND PENALTIES ISSUED BY THE CITY AND OTHER GOVERNING AGENCIES FOR <br />INADEQUATE EROSION CONTROL. <br />2. ESTABLISH SEDIMENT CONTROL MEASURES AT THE BEGINNING OF CONSTRUCTION AND MAINTAIN DURING THE ENTIRE LENGTH OF CONSTRUCTION. <br />AREAS WHICH ARE SUBJECT TO SEVERE EROSION AND OFF-SITE AREAS WHICH ARE ESPECIALLY VULNERABLE TO DAMAGE FROM EROSION AND/OR <br />SEDIMENTATION ARE TO BE IDENTIFIED AND RECEIVE ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES AS DIRECTED BY THE OWNER'S <br />CONSTRUCTION REPRESENTATIVE. EROSION CONTROL DEVICES SHALL BE INSTALLED PROPERLY PRIOR TO ANY LAND DISTURBING ACTIVITIES. <br />3. LOCATIONS OF STABILIZED CONSTRUCTION ENTRANCES INDICATED ON PLANS ARE APPROXIMATE. CONTRACTOR SHALL ADJUST LOCATION AND SIZE <br />OF ENTRANCES TO ACCOMMODATE CONSTRUCTION VEHICLES AND ACTIVITIES. <br />4. CONDUCT ALL LAND DISTURBING ACTIVITIES TO MINIMIZE THE AREA TO BE EXPOSED AT ANY ONE TIME AND MINIMIZE THE TIME OF EXPOSURE. MASS <br />CLEARING AND GRADING OF THE ENTIRE SITE SHOULD BE AVOIDED. COORDINATE ALL LAND DISTURBING ACTIVITIES TO MINIMIZE OFF-SITE <br />SEDIMENTATION DAMAGE. RESTABILIZE DISTURBED AREAS AS SOON AS POSSIBLE AFTER CONSTRUCTION IS COMPLETED IN ACCORDINACE WITH THE <br />NPDES PERMIT. <br />5. PERIODICALLY CLEAN OUT AND DISPOSE OF ALL SEDIMENT ONCE THE STORAGE CAPACITY OF THE DRAINAGE FEATURE OR STRUCTURE RECEIVING <br />THE SEDIMENT IS REDUCED BY ONE-HALF. CLEAN OUT AND DISPOSE OF ALL SEDIMENT AT THE COMPLETION OF THE PROJECT. ALL STREETS IN AND <br />ADJACENT TO THE PROJECT SHALL REMAIN CLEAN AND PASSABLE AT ALL TIMES. ANY SEDIMENT OR DEBRIS SHALL BE REMOVED WITHIN 24 HOURS, <br />OR AS OFTEN AS NEEDED TO ENSURE PUBLIC SAFETY AND TO COMPLY WITH THE NPDES PERMIT. CONTRACTOR IS REQUIRED TO MAINTAIN AND <br />REPLACE ALL EROSION CONTROL DEVICES AS NECESSARY TO COMPLY WITH THE NPDES PERMIT AND CITY REQUIREMENTS AT NO COST TO THE <br />OWNER. <br />6. INLET PROTECTION WILL BE INSTALLED AT ALL CATCH BASINS WITHIN THE PROJECT AREA. THE CONTRACTOR SHALL PROVIDE APPROPRIATE EROSION <br />CONTROL DEVICES FOR STOCKPILE AREAS, INLETS AND DITCHES. DITCHES MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, <br />OR FROM THE POINT OF DISCHARGE TO ANY SURFACE WATER. STABILIZATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO SURFACE <br />WATER. <br />7. REMOVE THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AND VERIFY THE CLEANING OUT OF ALL STORM DRAINAGE STRUCTURES, <br />INCLUDING FLUMES, PIPES, AND DITCHES ONCE FINAL STABILIZATION HAS OCCURRED. <br />8. PIPE OUTLETS NEED TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS OF GOING ONLINE. <br />9. WHEN DEWATERING IS REQUIRED, CONTRACTOR MUST SUBMIT A DEWATERING PLAN TO THE ENGINEER FOR APPROVAL AT LEAST 10 DAYS PRIOR TO <br />THE PROPOSED DEWATERING ACTIVITY. THE PLAN MUST INCLUDE A DEWATERING SYSTEM COMPLETE WITH SEDIMENT REMOVAL SYSTEM PRIOR TO <br />DISCHARGE. THE DEWATERING SYSTEM MUST ENSURE THE DISCHARGE IS FREE OF SEDIMENT AND TURBID WATER. <br />10. ADDITIONAL EROSION AND SEDIMENT CONTROLS MAY BE ADDED DURING ANY PHASE OF CONSTRUCTION AS DIRECTED BY THE ENGINEER. <br />11. THE CONTRACTOR SHALL PROVIDE PERIMETER CONTROL DAY - TO - DAY AT DISTURBED, UNSTABILIZED AREAS WHERE EROSION OR SEDIMENTATION <br />COULD BE A PROBLEM. THE ENGINEER SHALL DIRECT THE CONTRACTOR AS TO WHERE PLACEMENT OF PERIMETER CONTROL WILL BE REQUIRED. <br />12. THE CONTRACTOR MUST COMPLY WITH ALL NOISE AND DUST CONTROL ORDINANCES OF THE CITY. <br />13. MASS GRADING AREAS BEYOND PHASE 1 BOUNDARY TO BE STABILIZED ACCORDING TO EROSION CONTROL PLAN AND WITH SEED AS SHOWN IN <br />SEEDING PLAN. <br />PER STANDARD DETAILSINLET PROTECTION <br />TEMPORARY EROSION AND <br />SEDIMENT CONTROL PROVISIONS <br />WEEKLY INSPECTION & AFTER EACHRAIN EVENT-CORRECTIVE WORK ASNECESSARY <br />EROSION & SEDIMENTCONTROL MAINTENANCE <br />ALSO SEE INSPECTION AND MAINTENANCE REQUIREMENTSCONTAINED IN GENERAL PROVISIONS OF SWPPP. <br />(LESS THAN 4:1) - TYPE 1 MULCH, DISCANCHORED. (GREATER THAN 4:1) -STABALIZED FIBER MATRIX @ 3,000 lbs/ac. IFBLANKET CANNOT BE INSTALLED WITHIN 14DAYS. <br />SCHEDULE <br />ALSO SEE INSPECTION AND MAINTENANCE REQUIREMENTS CONTAINED INGENERAL PROVISIONS OF SWPPP. <br />PERMANENT EROSION AND SEDIMENT <br />CONTROL PROVISIONS <br />PERMANENT COVER - ALLOTHER DISTURBED AREAS <br />TYPE 1 STRAW MULCH WITH DISC ANCHORAND STATE SEED MIX 25-131 (LOWMAINTENANCE TURF GRASS STABILIZATION)@ 220 lbs/ac WITH FERTILIZER TYPE 3 (SLOWRELEASE; 22-5-10) @ 350 lbs/ac. UNLESSBLANKET IS SPECIFIED ON PLANS. <br />OR <br />SOD WITH FERTILIZER TYPE 3 (SLOWRELEASE; 22-5-10) @ 200 lbs/ac <br />STORMWATER PONDSLOPE <br />EROSION CONTROL BLANKETCATEGORY 3N/2S (WOOD FIBER) WITHSTATE SEED MIX 33-261 @ 35 lbs/ac.WITH TYPE 4 FERTILIZER (NATURALBASED; 18-1-8) @ 150 lbs/ac. <br />PERMANENT COVER -BLANKETED AREAS <br />EROSION CONTROL BLANKETCATEGORY 3N/2S (WOOD FIBER) WITHSTATE SEED MIX 35-241 @ 36.5 lbs/acWITH TYPE 4 FERTILIZER (NATURALBASED; 18-1-8) @ 150 lbs/ac. <br />EROSION CONTROL BLANKET CATEGORY3N/2S (WOOD FIBER)EROSION CONTROLBLANKET <br />ITEM <br />PRIOR TO CONSTRUCTION ANDIMMEDIATELY AS DICTATED <br />SILT FENCE, PERIMETERCONTROLS <br />MnDOT SEED MIX 21-111 (SPEC 3876)100 lbs/ac.COVER CROPS <br />WEEKLY INSPECTION & AFTER EACHRAIN EVENT-CORRECTIVE WORK ASNECESSARY <br />TEMPORARY SEDIMENTTRAP <br />BP PIPELINE CONSTRUCTION AND EXCAVATION NOTES <br />1. CONTRACTOR SHALL COORDINATE WITH BP PIPELINE ENGINEERING AND RIGHT-OF-WAY STAFF FOR ALL CONSTRUCTION ACTIVITIES OVER AND NEAR PIPELINE. <br />NO EXCAVATION OR CONSTRUCTION ACTIVITY WILL BE PERMITTED IN THE VICINITY OF THE PIPELINE UNTIL ALL APPROPRIATE COMMUNICATIONS HAVE BEEN <br />MADE WITH BP'S FIELD OPERATIONS AND THE RIGHT-OF-WAY DEPARTMENT. <br />2. CONTRACTOR SHALL PROVIDE A PLAN FOR WHERE CONSTRUCTION EQUIPMENT WILL CROSS THE PIPELINE TO BP ENGINEERING STAFF WHICH WILL INCLUDE THE <br />FOLLOWING: <br />2.1. WHERE EQUIPMENT WILL CROSS THE PIPELINE; <br />2.2. THE DEPTH OF THE PIPE AT THE CROSSINGS; <br />2.3. ANY PROPOSED RAMPING OVER THE PIPELINE; <br />2.4. TYPE AND FULLY LOADED WEIGHT FOR THE EQUIPMENT. FOR TRACKED EQUIPMENT, THE TRACK SHOE WIDTH AND LENGTH OF TRACK ON GROUND SHALL BE <br />PROVIDED. FOR WHEELED EQUIPMENT, THE NUMBER OF AXLES (SINGLE OR TANDEM) SHALL BE PROVIDED. <br />3. CONTRACTOR MAY NOT TRANSPORT CONSTRUCTION MATERIALS OR EQUIPMENT LONGITUDINALLY OVER THE PIPELINE. <br />4. NO TRACK TYPE CONSTRUCTION EQUIPMENT SHALL BE PERMITTED TO PIVOT OR TURN DIRECTLY OVER THE TOP OF THE PIPELINE. <br />5. A SCRAPER OR PAN TYPE TRACTOR SHALL NOT BE USED FOR REMOVAL OF SOIL WITHIN TEN FEET (10') OF THE CENTERLINE OF THE PIPELINE. RUBBER TIRE OR <br />SMALL TRACK TYPE EQUIPMENT IS AN ACCEPTABLE ALTERNATIVE. <br />6. A SHEEPSFOOT ROLLER SHALL NOT BE USED FOR COMPACTION PURPOSES WITHIN FIVE FEET (5') OF, OR DIRECTLY ABOVE, THE CENTERLINE OF THE PIPELINE. <br />7. NO VIBRATORY ROLLERS SHALL BE USED WITHIN THREE FEET (3') OF THE CENTERLINE OF THE PIPELINE UNTIL THE COMPACTED COVER OVER THE PIPELINE HAS <br />REACHED A DEPTH OF THREE AND ONE-HALF FEET (3.5'). <br />8. ANY EXCAVATION WITHIN TWO FEET (2') OF THE PIPELINE SHALL BE DONE BY HAND, OR BY OTHER NON-MECHANICAL MEANS AS APPROVED BY BP PERSONNEL <br />WHO ARE ON-SITE AND CAN REVIEW THE WORK. <br />9. NO EXCAVATION OR BACKFILLING SHOULD OCCUR WITHIN THE PIPELINE RIGHT-OF-WAY FOR ANY REASON UNLESS PRIOR PERMISSION IS OBTAINED FROM BP <br />PERSONNEL WHO ARE ON-SITE AND CAN REVIEW THE WORK.10/24/2022
The URL can be used to link to this page
Your browser does not support the video tag.