My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-2023 Workshop Minutes
>
City Council Meeting Minutes
>
2020-2029
>
2023
>
01-11-2023 Workshop Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2023 10:57:37 AM
Creation date
1/27/2023 10:57:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKSHOP MINUTES <br />CITY COUNCIL <br />JANUARY 11, 2023 <br />OWASSO BASIN FLOOD RISK REDUCTION PROPOSAL <br />The Public Works Director explained that the high-water levels in Little Canada from 2014-2019 <br />and the flooding of Twin Lake, led the Ramsey Washington Metro Watershed District <br />(RWMWD) to take a look at its entire management area and see what improvements could be <br />made to decrease the likelihood of flooding in the most prone areas. He stated one of the areas <br />of focus that rose to the top is the Owasso Basin area, which is located between the Ryan <br />Industrial Park and North Star Estates manufactured home park off of Country Drive and South <br />Owasso Boulevard. He stated the basin is a chokepoint that holds water coming in from the <br />north and then releases it to Gervais Creek to head south and eventually into Gervais Lake. He <br />stated there are still flooding issues in North Star Estates and the RWMWD has been working <br />with City staff since 2020 on possible ways to reduce the flood risk in the park. <br />Sam Redinger, Barr Engineering, explained that the intent of tonight is to give the City Council <br />and overview of their work so far and give input on what efforts they are making. He gave a <br />background on the ongoing flood reduction efforts in the Owasso Basin area. He stated they <br />have identified structures, including homes, that are at risk of flooding. He reported they have <br />done a bypass pipeline feasibility study and determined three projects that could be done right <br />away. He stated that Phase 1 & 2 have been completed, and the Phase 3 analysis is ongoing with <br />a focus on the North Star Estates manufactured home park. He explained that most of the homes <br />in North Star Estates would not have flooding inundate their home because they are elevated, but <br />having flood water outside their home is also problematic. He stated there is one home in North <br />Star Estates that is on a low lot and the home is older so it is not elevated as high as the current <br />code would require. He stated it is cheaper to buy this home, remove it and regrade the lot, than <br />it would be to lower the area water level enough to fully protect this home as it is. He explained <br />that the pond basin on the north side of North Star Estates could also be dredged in order to <br />increase the water storage capacity there. The Public Works Director explained that the basin <br />was constructed in the early 1990's to try and protect the North Star manufactured home park <br />from the frequent flooding events that occurred following most large rain events. <br />Mr. Redinger explained that their next steps are to summarize the alternatives and bring to the <br />RWMWD Board of Managers for review and consideration. <br />PIONEER PARK STORMWATER REUSE PROJECT <br />The Parks & Rec/Community Services Director stated that there is a proposal to reuse <br />stormwater to irrigate Pioneer Park instead of the current practice of using well water. He stated <br />that the Ramsey -Washington Metro Watershed District (RWMWD) has a program called <br />"Targeted Retrofit Program" that can provide funding for this type of project. <br />Paige <br />Jen Koeher, Barr Engineering, explained the components of a stormwater reuse system. She <br />noted there are existing stormwater ponds in the park, and stated if the top one foot of water from <br />these existing ponds was used, it could furnish 80-90% of the water needed for the 11 acres that <br />are irrigated. Paige Ahlborg, RWMWD, stated the RWMWD Board has seen this plan and <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.