Laserfiche WebLink
<br />value for permit fee purposes. In the event that there is a dispute on the amount of the job cost, the city <br />may request the submission of a signed copy of the actual contract. <br /> <br />PLUMBING PERMIT FEES <br />Outside Sewer/Water <br />Residential Water (1 & 2 units) $25.00 <br />Residential Sewer (1 & 2 units) $25.00 <br />3+ Units Residential & <br />Commercial Water <br />$125 + $125 per hour for inspections <br />3+ Units Residential & <br />Commercial Water <br />$125 + $125 per hour for inspections <br />MCES Interceptor System - <br />Metropolitan Council Direct <br />Connection Application Fee <br />(Pass-Through Cost) <br /> $900.00 <br />Sewer Availability Charge – Local $300.00 per SAC unit determined by Met Council <br />Sewer Availability Charge (SAC) <br />– Metropolitan Council (pass- <br />through cost) <br />$2,485 per unit as determined by the Met Council <br />State Surcharge $1.00 <br />Commercial Plumbing <br />Base Fee $60.00 (charged in addition to the permit fee) <br />Permit Fee Project value* x 1.5% <br />State Surcharge Project value* x .0005 with minimum charge of $0.50 <br />Inside Plumbing <br />Base Fee - Residential $35.00 (charged in addition to the other fees) <br />Fixtures - Residential $10.00 each <br />Water Turn-on $15.00 <br />Reduced Pressure Zone (RPZ) $50.00 <br />Water Turn-off $15.00 <br />Water Meter Current price charged by supplier <br />Water Availability Charge - Local $300.00 per SAC unit determined by Met Council (charged <br />only for existing buildings connecting to city water that <br />haven’t already been assessed this fee) <br />Septic Pumping $5.00 <br />Well Drilling $10.00 <br />Replacement Spacer $20.00 <br />Remove or Install Underground <br />Storage Tank <br />$25.00 <br />State Surcharge $1.00 <br /> <br />*Project value means the actual or estimated dollar amount charged for permitted work including <br />materials, labor, profit, and other fixed costs. It is the amount to be charged to the customer for the <br />work done. If any material, equipment, labor or installation are furnished by the owner, tenant, or any <br />other party, the reasonable market value of such items must be added to the estimated cost or project