My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-14-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
12-14-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 10:09:09 PM
Creation date
4/13/2023 9:55:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. INTRODUCTION <br />2023 Street Improvements (Sunrise Drive Mill and Overlay) ǀ 0N1.127995 Page 1 <br />I. INTRODUCTION <br />The City of Little Canada is planning rehabilitation efforts on several residential , collector, and <br />commercial streets during the 2023 construction season, in accordance with the Capital <br />Improvement Plan. The City’s 2023 work plan includes proposed street and utility improvements to <br />the following streets: <br />1. Sunrise Drive – Mill and Overlay <br />2. Sunrise Drive – Reclamation (detailed in a separate report) <br />3. Sunset Court (detailed in a separate report) <br />4. Spruce Street (detailed in a separate report) <br />5. Twin Lake Boulevard (detailed in a separate report) <br />Previously, a Feasibility Report was prepared by the City Engineer and accepted by the City <br />Council for roadway reclamation on the last 340’ of Sunrise Drive (including the cul-de-sac). <br />This report examines the remaining section of Sunrise Drive (Edgerton Street to 340’ south of the <br />cul-de-sac) as a mill and overlay improvement project. If authorized by the City Council, the <br />project would be combined and constructed with the adjacent roadway reclamation project area on <br />Sunrise Drive. <br />This report will review the existing and discuss, in detail, the proposed improvements. The report <br />will also provide preliminary cost esti mates for the proposed improvements with financing for the <br />projects coming from a combination of special assessments and the City’s Infrastructure Capital <br />Improvement Fund. <br />An informational meeting will be held with residents prior to the Public Improvement Hearing. <br />If the City elects to proceed with the proposed street and utility improvements described in this <br />report, it is anticipated that construction would begin in 2023 as detailed in the project schedule <br />found on Page 5. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.