My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-14-2022 Council Packet
>
City Council Packets
>
2020-2029
>
2022
>
12-14-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 10:09:09 PM
Creation date
4/13/2023 9:55:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. ESTIMATED COSTS <br />2023 Street Improvements (Sunrise Drive Mill and Overlay) ǀ 0N1.127995 Page 3 <br />the life of the overall roadway (asphalt base, aggregate base, concrete curbing, etc.). A <br />properly timed mill and overlay can extend the life of the roadway 15+ years. <br />In addition to the asphalt mill and overlay, curb and gutter that is cracked, weathered, <br />or heaved will be removed and replaced with new curb and gutter. This improves <br />stormwater conveyance to catch basins and prevents the intrusion of stormwater into <br />the roadway base. <br />2. Watermain Improvements <br />The existing ductile iron watermain is in good condition and is proposed to be left in <br />place. Similarly, existing water services are proposed to be left in place. Mill and <br />overlay projects are typically not good candidates for underground utility <br />improvements because the intent is to save the existing asphalt base course. <br />3. Sanitary Sewer Improvements <br />The existing sanitary sewer network is in good condition and is proposed to be left in <br />place. In conjunction with the pavement rehabilitation, each sanitary sewer structure <br />within the pavement will receive a new casting and adjustment to the new pavement <br />elevation. Mill and overlay projects are typically not good candidates for underground <br />utility improvements because the intent is to save the existing asphalt base course. <br />4. Storm Sewer Improvements <br />Overall, the existing storm sewer system is in good condition and proposed to be left in <br />place. <br />III. ESTIMATED COSTS <br />The estimated project cost to complete the improvements proposed herein are presented below. <br />These costs include estimated construction costs, a 15% contingency, 18% engineering, and <br />allowances for geotechnical investigations. <br />These cost estimates are based upon public construction cost information. Since the consultant has <br />no control over the cost of labor, materials, competitive bidding process, weather conditions, and <br />other factors affecting the cost of construction, all cost estimates are opinions for general <br />information of the client and no warranty or guarantee as to the accuracy of constructi on cost <br />estimates is made. It is recommended that costs for project financing should be based upon actual, <br />competitive bid prices with reasonable contingencies. <br /> <br />Table 1: Estimated Cost Summary <br />Item Total Estimated Cost <br />Streets $45,358.61 <br />Sanitary Sewer $5,321.80 <br />Water Main $1,947.00 <br />Storm Sewer $6,749.60 <br />Total $59,377.01 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.