My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-09 Additions
>
City Council Packets
>
2000-2009
>
2009
>
03-10-09 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 1:13:55 PM
Creation date
3/12/2009 2:43:30 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i-r-~iHC ~. ussoa.aT~s <br />TAU> UORTU <br />March 10, 2009 <br />File No. 120119E-0060 <br />Honorable Mayor and City Council <br />City of Little Canada <br />515 Little Canada Road East <br />Little Canada, MN 55117-1633 <br />SUBJECT: 2009 Mill & Overlay Project Bid Results <br />Dear Mayor and Council Members: <br />Bids were opened for the above referenced project at 11:00 a.m. on Tuesday, March 10, 2009 <br />in accordance with the Advertisement for Bids. The project consists of the mill and overlay of <br />the bituminous surface and some curb replacement on Demont Avenue between Rice Street <br />and Canabury Drive, Desoto Street north of Labore Road, Costa Lane, Windrow Drive, and <br />Westwind Drive. Eleven (11) bids were received from the following companies listed below from <br />lowest to highest total bid: <br />Corporation Total Bid <br />T. A. Schifsky & Sons $390,995.00 <br />Northwest Asphalt $406,712.30 <br />Tower Asphalt, Inc. $407,051.05 <br />Astech Corp. $412,063.55 <br />GMH Asphalt Corp. $421,043.35 <br />Rum River Contracting $425,075.30 <br />FPI Paving Contractors Inc. $439,525.25 <br />Hardrives, Inc. $461,974.85 <br />Thor Construction $465,855.36` <br />Ace Blacktop Inc. $498,989.90 <br />North Valley Inc. $504,021.65 <br />Bituminous Roadways Inc. $517,072.50 <br />Midwest Paving Corp. $535,848.40 <br />The Thor Construction bid marked with an asterisk (*) did not acknowledge addendum #1 and <br />therefore is not a valid bid, but we did include it for informational purposes. The engineer's <br />estimate completed at the end of plan and specification preparation estimated the construction <br />cost at $606,000.00. Based on the bids received, T.A. Schifsky, Inc. is the low bidder. The low <br />bid received, based on the engineer's estimate, appears to be competitive and the bids have <br />been reviewed for errors and/or omissions. T.A. Schifsky, Inc. was the Contractor for the City's <br />2006 and 2007 Street Projects and past experience with them reflects that they are a <br />responsive and responsible bidder. <br />Itr-031009-CC (Mill & Overlay Bid Results) <br />10062 Flanders Court NE, Blaine, MN 55449 - Ph: (763) 780-0450 -Fax: (763) 780-0452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.