Laserfiche WebLink
22-2039FAX: (651) 361-8701PHONE: (651) 361-8210LINO LAKES, MN 550146776 LAKE DRIVESUITE 110SITE PLANNING& ENGINEERINGPLOWEENGINEERING, INC.I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY <br />ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM <br />A DULY LICENSED PROFESSIONAL ENGINEER UNDER <br />THE LAWS OF THE STATE OF MINNESOTA. <br />Date: License No. 43963 <br />ADAM GINKEL <br />01.02.2023PREPARED FOR: CARA BUILDERSC4.1SHEETVILLAS OF GERVAIS LAKE <br />SWPPP <br />CITY OF LITTLE CANADA, MN <br />1 <br />2 <br />4 <br />5 <br />6 <br />7 <br />8 <br />3 <br />CWPAGCHECK BY:DRAWN BY:22-2039DATE:JOB NO:07/25/22DESCRIPTIONDATENO.S:\PLOWE\CAD\22PROJ\2039 LITTLE CANADA\2039 CAD\2039 BASE 9.DWGWednesday, December 21, 2022 10:11:16 AMPRELIMINARY 4.1 TERMINATION OF COVERAGE. [MINN. R. 7090]4.2 PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ALL TERMINATION CONDITIONS LISTED IN SECTION 13 ARECOMPLETE. [MINN. R. 7090]4.3 PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER SELLING OR OTHERWISE LEGALLY TRANSFERRING THE ENTIRESITE, INCLUDING PERMIT RESPONSIBILITY FOR ROADS (E.G., STREET SWEEPING) AND STORMWATER INFRASTRUCTUREFINAL CLEAN OUT, OR TRANSFERRING PORTIONS OF A SITE TO ANOTHER PARTY. THE PERMITTEES' COVERAGE UNDER THISPERMIT TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF THE NOT. [MINN. R. 7090]4.4 PERMITTEES MAY TERMINATE PERMIT COVERAGE PRIOR TO COMPLETION OF ALL CONSTRUCTION ACTIVITY IF THEY MEETALL OF THE FOLLOWING CONDITIONS:A. CONSTRUCTION ACTIVITY HAS CEASED FOR AT LEAST 90 DAYS; ANDB. AT LEAST 90 PERCENT (BY AREA) OF ALL ORIGINALLY PROPOSED CONSTRUCTION ACTIVITY HAS BEEN COMPLETEDAND PERMANENT COVER HAS BEEN ESTABLISHED ON THOSE AREAS; ANDC. ON AREAS WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE, PERMANENT COVER HAS BEEN ESTABLISHED; ANDD. THE SITE COMPLIES WITH ITEM 13.3 THROUGH 13.7.AFTER PERMIT COVERAGE IS TERMINATED UNDER THIS ITEM, ANY SUBSEQUENT DEVELOPMENT ON THE REMAININGPORTIONS OF THE SITE WILL REQUIRE PERMIT COVERAGE IF THE SUBSEQUENT DEVELOPMENT ITSELF OR AS PART OF THEREMAINING COMMON PLAN OF DEVELOPMENT OR SALE WILL RESULT IN LAND DISTURBING ACTIVITIES OF ONE (1) OR MOREACRES IN SIZE. [MINN. R. 7090]4.5 PERMITTEES MAY TERMINATE COVERAGE UPON MPCA APPROVAL AFTER SUBMITTING INFORMATION DOCUMENTING THEOWNER CANCELED THE PROJECT. [MINN. R. 7090]6.1 SWPPP AMENDMENTS. [MINN. R. 7090]6.2 ONE OF THE INDIVIDUALS DESCRIBED IN ITEM 21.2.A OR ITEM 21.2.B OR ANOTHER QUALIFIED INDIVIDUAL MUSTCOMPLETE ALL SWPPP CHANGES. CHANGES INVOLVING THE USE OF A LESS STRINGENT BMP MUST INCLUDE AJUSTIFICATION DESCRIBING HOW THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITE CHARACTERISTICS. [MINN. R. 7090]6.3 PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECTPROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION,MAINTENANCE, WEATHER OR SEASONAL CONDITIONS HAVING A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTSTO SURFACE WATERS OR GROUNDWATER. [MINN. R. 7090]6.4 PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECTPROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER INSPECTIONS OR INVESTIGATIONS BY THE SITE OWNER OROPERATOR, USEPA OR MPCA OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLYMINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER OR THE DISCHARGES ARE CAUSINGWATER QUALITY STANDARD EXCEEDANCES (E.G., NUISANCE CONDITIONS AS DEFINED IN MINN. R. 7050.0210, SUBP. 2) ORTHE SWPPP IS NOT CONSISTENT WITH THE OBJECTIVES OF A USEPA APPROVED TMDL. [MINN. R. 7050.0210]7.1 BMP SELECTION AND INSTALLATION. [MINN. R. 7090]7.2 PERMITTEES MUST SELECT, INSTALL, AND MAINTAIN THE BMPS IDENTIFIED IN THE SWPPP AND IN THIS PERMIT IN ANAPPROPRIATE AND FUNCTIONAL MANNER AND IN ACCORDANCE WITH RELEVANT MANUFACTURER SPECIFICATIONS ANDACCEPTED ENGINEERING PRACTICES. [MINN. R. 7090]8.1 EROSION PREVENTION PRACTICES. [MINN. R. 7090]8.2 BEFORE WORK BEGINS, PERMITTEES MUST DELINEATE THE LOCATION OF AREAS NOT TO BE DISTURBED. [MINN. R.7090]8.3 PERMITTEES MUST MINIMIZE THE NEED FOR DISTURBANCE OF PORTIONS OF THE PROJECT WITH STEEP SLOPES. WHENSTEEP SLOPES MUST BE DISTURBED, PERMITTEES MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATIONPRACTICES DESIGNED FOR STEEP SLOPES (E.G., SLOPE DRAINING AND TERRACING). [MINN. R. 7090]8.4 PERMITTEES MUST STABILIZE ALL EXPOSED SOIL AREAS, INCLUDING STOCKPILES. STABILIZATION MUST BE INITIATEDIMMEDIATELY TO LIMIT SOIL EROSION WHEN CONSTRUCTION ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED ONANY PORTION OF THE SITE AND WILL NOT RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. STABILIZATION MUST BECOMPLETED NO LATER THAN 14 CALENDAR DAYS AFTER THE CONSTRUCTION ACTIVITY HAS CEASED. STABILIZATION IS NOTREQUIRED ON CONSTRUCTED BASE COMPONENTS OF ROADS, PARKING LOTS AND SIMILAR SURFACES. STABILIZATION ISNOT REQUIRED ON TEMPORARY STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (E.G., CLEANAGGREGATE STOCKPILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES) BUT PERMITTEES MUST PROVIDESEDIMENT CONTROLS AT THE BASE OF THE STOCKPILE. [MINN. R. 7090]8.5 FOR PUBLIC WATERS THAT THE MINNESOTA DNR HAS PROMULGATED "WORK IN WATER RESTRICTIONS" DURINGSPECIFIED FISH SPAWNING TIME FRAMES, PERMITTEES MUST COMPLETE STABILIZATION OF ALL EXPOSED SOIL AREASWITHIN 200 FEET OF THE WATER'S EDGE, AND THAT DRAIN TO THESE WATERS, WITHIN 24 HOURS DURING THERESTRICTION PERIOD. [MINN. R. 7090]8.6 PERMITTEES MUST STABILIZE THE NORMAL WETTED PERIMETER OF THE LAST 200 LINEAR FEET OF TEMPORARY ORPERMANENT DRAINAGE DITCHES OR SWALES THAT DRAIN WATER FROM THE SITE WITHIN 24 HOURS AFTER CONNECTING TOA SURFACE WATER OR PROPERTY EDGE. PERMITTEES MUST COMPLETE STABILIZATION OF REMAINING PORTIONS OFTEMPORARY OR PERMANENT DITCHES OR SWALES WITHIN 14 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATEROR PROPERTY EDGE AND CONSTRUCTION IN THAT PORTION OF THE DITCH TEMPORARILY OR PERMANENTLY CEASES. [MINN.R. 7090]8.7 TEMPORARY OR PERMANENT DITCHES OR SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM DURINGCONSTRUCTION (WITH PROPERLY DESIGNED ROCK-DITCH CHECKS, BIO ROLLS, SILT DIKES, ETC.) DO NOT NEED TO BESTABILIZED. PERMITTEES MUST STABILIZE THESE AREAS WITHIN 24 HOURS AFTER THEIR USE AS A SEDIMENTCONTAINMENT SYSTEM CEASES. [MINN. R. 7090]8.8 PERMITTEES MUST NOT USE MULCH, HYDROMULCH, TACKIFIER, POLYACRYLAMIDE OR SIMILAR EROSION PREVENTIONPRACTICES WITHIN ANY PORTION OF THE NORMAL WETTED PERIMETER OF A TEMPORARY OR PERMANENT DRAINAGE DITCHOR SWALE SECTION WITH A CONTINUOUS SLOPE OF GREATER THAN 2 PERCENT. [MINN. R. 7090]8.9 PERMITTEES MUST PROVIDE TEMPORARY OR PERMANENT ENERGY DISSIPATION AT ALL PIPE OUTLETS WITHIN 24 HOURSAFTER CONNECTION TO A SURFACE WATER OR PERMANENT STORMWATER TREATMENT SYSTEM. [MINN. R. 7090]8.10 PERMITTEES MUST NOT DISTURB MORE LAND (I.E., PHASING) THAN CAN BE EFFECTIVELY INSPECTED AND MAINTAINEDIN ACCORDANCE WITH SECTION 11. [MINN. R. 7090]9.1 SEDIMENT CONTROL PRACTICES. [MINN. R. 7090]9.2 PERMITTEES MUST ESTABLISH SEDIMENT CONTROL BMPS ON ALL DOWNGRADIENT PERIMETERS OF THE SITE ANDDOWNGRADIENT AREAS OF THE SITE THAT DRAIN TO ANY SURFACE WATER, INCLUDING CURB AND GUTTER SYSTEMS.PERMITTEES MUST LOCATE SEDIMENT CONTROL PRACTICES UPGRADIENT OF ANY BUFFER ZONES. PERMITTEES MUSTINSTALL SEDIMENT CONTROL PRACTICES BEFORE ANY UPGRADIENT LAND-DISTURBING ACTIVITIES BEGIN AND MUST KEEPTHE SEDIMENT CONTROL PRACTICES IN PLACE UNTIL THEY ESTABLISH PERMANENT COVER. [MINN. R. 7090]9.3 IF DOWNGRADIENT SEDIMENT CONTROLS ARE OVERLOADED, BASED ON FREQUENT FAILURE OR EXCESSIVEMAINTENANCE REQUIREMENTS, PERMITTEES MUST INSTALL ADDITIONAL UPGRADIENT SEDIMENT CONTROL PRACTICES ORREDUNDANT BMPS TO ELIMINATE THE OVERLOADING AND AMEND THE SWPPP TO IDENTIFY THESE ADDITIONAL PRACTICESAS REQUIRED IN ITEM 6.3. [MINN. R. 7090]9.4 TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS DESIGNED AS PART OF A SEDIMENTCONTAINMENT SYSTEM (E.G., DITCHES WITH ROCK-CHECK DAMS) REQUIRE SEDIMENT CONTROL PRACTICES ONLY ASAPPROPRIATE FOR SITE CONDITIONS. [MINN. R. 7090]9.5 A FLOATING SILT CURTAIN PLACED IN THE WATER IS NOT A SEDIMENT CONTROL BMP TO SATISFY ITEM 9.2 EXCEPTWHEN WORKING ON A SHORELINE OR BELOW THE WATERLINE. IMMEDIATELY AFTER THE SHORT TERM CONSTRUCTIONACTIVITY (E.G., INSTALLATION OF RIP RAP ALONG THE SHORELINE) IN THAT AREA IS COMPLETE, PERMITTEES MUST INSTALLAN UPLAND PERIMETER CONTROL PRACTICE IF EXPOSED SOILS STILL DRAIN TO A SURFACE WATER. [MINN. R. 7090]9.6 PERMITTEES MUST RE-INSTALL ALL SEDIMENT CONTROL PRACTICES ADJUSTED OR REMOVED TO ACCOMMODATESHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF VEHICLES, IMMEDIATELY AFTER THESHORT-TERM ACTIVITY IS COMPLETED. PERMITTEES MUST RE-INSTALL SEDIMENT CONTROL PRACTICES BEFORE THE NEXTPRECIPITATION EVENT EVEN IF THE SHORT-TERM ACTIVITY IS NOT COMPLETE. [MINN. R. 7090]9.7 PERMITTEES MUST PROTECT ALL STORM DRAIN INLETS USING APPROPRIATE BMPS DURING CONSTRUCTION UNTIL THEYESTABLISH PERMANENT COVER ON ALL AREAS WITH POTENTIAL FOR DISCHARGING TO THE INLET. [MINN. R. 7090]9.8 PERMITTEES MAY REMOVE INLET PROTECTION FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (E.G. STREETFLOODING/FREEZING) IS IDENTIFIED BY THE PERMITTEES OR THE JURISDICTIONAL AUTHORITY (E.G.,CITY/COUNTY/TOWNSHIP/MINNESOTA DEPARTMENT OF TRANSPORTATION ENGINEER). PERMITTEES MUST DOCUMENT THENEED FOR REMOVAL IN THE SWPPP. [MINN. R. 7090]9.9 PERMITTEES MUST PROVIDE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS AT THE BASE OF STOCKPILES ONTHE DOWNGRADIENT PERIMETER. [MINN. R. 7090]9.10 PERMITTEES MUST LOCATE STOCKPILES OUTSIDE OF NATURAL BUFFERS OR SURFACE WATERS, INCLUDINGSTORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS UNLESS THERE IS A BYPASS IN PLACE FOR THESTORMWATER. [MINN. R. 7090]9.11 PERMITTEES MUST INSTALL A VEHICLE TRACKING BMP TO MINIMIZE THE TRACK OUT OF SEDIMENT FROM THECONSTRUCTION SITE OR ONTO PAVED ROADS WITHIN THE SITE. [MINN. R. 7090]9.12 PERMITTEES MUST USE STREET SWEEPING IF VEHICLE TRACKING BMPS ARE NOT ADEQUATE TO PREVENT SEDIMENTTRACKING ONTO THE STREET. [MINN. R. 7090]9.13 PERMITTEES MUST INSTALL TEMPORARY SEDIMENT BASINS AS REQUIRED IN SECTION 14. [MINN. R. 7090]9.14 IN ANY AREAS OF THE SITE WHERE FINAL VEGETATIVE STABILIZATION WILL OCCUR, PERMITTEES MUST RESTRICTVEHICLE AND EQUIPMENT USE TO MINIMIZE SOIL COMPACTION. [MINN. R. 7090]9.15 PERMITTEES MUST PRESERVE TOPSOIL ON THE SITE, UNLESS INFEASIBLE. [MINN. R. 7090]9.16 PERMITTEES MUST DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS UNLESS INFEASIBLE. [MINN. R. 7090]9.17 PERMITTEES MUST PRESERVE A 50 FOOT NATURAL BUFFER OR, IF A BUFFER IS INFEASIBLE ON THE SITE, PROVIDEREDUNDANT (DOUBLE) PERIMETER SEDIMENT CONTROLS WHEN A SURFACE WATER IS LOCATED WITHIN 50 FEET OF THEPROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER. PERMITTEES MUST INSTALLPERIMETER SEDIMENT CONTROLS AT LEAST 5 FEET APART UNLESS LIMITED BY LACK OF AVAILABLE SPACE. NATURALBUFFERS ARE NOT REQUIRED ADJACENT TO ROAD DITCHES, JUDICIAL DITCHES, COUNTY DITCHES, STORMWATERCONVEYANCE CHANNELS, STORM DRAIN INLETS, AND SEDIMENT BASINS. IF PRESERVING THE BUFFER IS INFEASIBLE,PERMITTEES MUST DOCUMENT THE REASONS IN THE SWPPP. SHEET PILING IS A REDUNDANT PERIMETER CONTROL IFINSTALLED IN A MANNER THAT RETAINS ALL STORMWATER. [MINN. R. 7090]9.18 PERMITTEES MUST USE POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS INACCORDANCE WITH ACCEPTED ENGINEERING PRACTICES, DOSING SPECIFICATIONS AND SEDIMENT REMOVAL DESIGNSPECIFICATIONS PROVIDED BY THE MANUFACTURER OR SUPPLIER. THE PERMITTEES MUST USE CONVENTIONAL EROSIONAND SEDIMENT CONTROLS PRIOR TO CHEMICAL ADDITION AND MUST DIRECT TREATED STORMWATER TO A SEDIMENTCONTROL SYSTEM FOR FILTRATION OR SETTLEMENT OF THE FLOC PRIOR TO DISCHARGE. [MINN. R. 7090]10.1 DEWATERING AND BASIN DRAINING. [MINN. R. 7090]10.2 PERMITTEES MUST DISCHARGE TURBID OR SEDIMENT-LADEN WATERS RELATED TO DEWATERING OR BASIN DRAINING(E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) TO A TEMPORARY OR PERMANENT SEDIMENT BASIN ONTHE PROJECT SITE UNLESS INFEASIBLE. PERMITTEES MAY DEWATER TO SURFACE WATERS IF THEY VISUALLY CHECK TOENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED AND NUISANCE CONDITIONS (SEE MINN. R. 7050.0210, SUBP. 2) WILLNOT RESULT FROM THE DISCHARGE. IF PERMITTEES CANNOT DISCHARGE THE WATER TO A SEDIMENTATION BASIN PRIORTO ENTERING A SURFACE WATER, PERMITTEES MUST TREAT IT WITH APPROPRIATE BMPS SUCH THAT THE DISCHARGE DOESNOT ADVERSELY AFFECT THE SURFACE WATER OR DOWNSTREAM PROPERTIES. [MINN. R. 7050.0210]10.3 IF PERMITTEES MUST DISCHARGE WATER CONTAINING OIL OR GREASE, THEY MUST USE AN OIL-WATER SEPARATOR ORSUITABLE FILTRATION DEVICE (E.G., CARTRIDGE FILTERS, ABSORBENTS PADS) PRIOR TO DISCHARGE. [MINN. R. 7090]10.4 PERMITTEES MUST DISCHARGE ALL WATER FROM DEWATERING OR BASIN-DRAINING ACTIVITIES IN A MANNER THATDOES NOT CAUSE EROSION OR SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS OR INUNDATION OF WETLANDSIN THE IMMEDIATE VICINITY OF DISCHARGE POINTS THAT CAUSES SIGNIFICANT ADVERSE IMPACT TO THE WETLAND. [MINN.R. 7090]10.5 IF PERMITTEES USE FILTERS WITH BACKWASH WATER, THEY MUST HAUL THE BACKWASH WATER AWAY FOR DISPOSAL,RETURN THE BACKWASH WATER TO THE BEGINNING OF THE TREATMENT PROCESS, OR INCORPORATE THE BACKWASHWATER INTO THE SITE IN A MANNER THAT DOES NOT CAUSE EROSION. [MINN. R. 7090]11.1 INSPECTIONS AND MAINTENANCE. [MINN. R. 7090]11.2 PERMITTEES MUST ENSURE A TRAINED PERSON, AS IDENTIFIED IN ITEM 21.2.B, WILL INSPECT THE ENTIRECONSTRUCTION SITE AT LEAST ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURSAFTER A RAINFALL EVENT GREATER THAN 1/2 INCH IN 24 HOURS. [MINN. R. 7090]11.3 PERMITTEES MUST INSPECT AND MAINTAIN ALL PERMANENT STORMWATER TREATMENT BMPS. [MINN. R. 7090]11.4 PERMITTEES MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS AND POLLUTION PREVENTIONMANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS. PERMITTEES MUST REPAIR, REPLACE ORSUPPLEMENT ALL NONFUNCTIONAL BMPS WITH FUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY AFTERDISCOVERY UNLESS ANOTHER TIME FRAME IS SPECIFIED IN ITEM 11.5 OR 11.6. PERMITTEES MAY TAKE ADDITIONAL TIMEIF FIELD CONDITIONS PREVENT ACCESS TO THE AREA. [MINN. R. 7090]11.5 DURING EACH INSPECTION, PERMITTEES MUST INSPECT SURFACE WATERS, INCLUDING DRAINAGE DITCHES ANDCONVEYANCE SYSTEMS BUT NOT CURB AND GUTTER SYSTEMS, FOR EVIDENCE OF EROSION AND SEDIMENT DEPOSITION.PERMITTEES MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS,CATCH BASINS, AND OTHER DRAINAGE SYSTEMS AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS INEXPOSED SOIL. PERMITTEES MUST COMPLETE REMOVAL AND STABILIZATION WITHIN SEVEN (7) CALENDAR DAYS OFDISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. PERMITTEES MUST USE ALLREASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN(7) DAYS OF OBTAINING ACCESS. PERMITTEES ARE RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE ANDFEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK IN SURFACE WATERS.[MINN. R. 7090]11.6 PERMITTEES MUST INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS, STREETS AND CURB AND GUTTERSYSTEMS WITHIN AND ADJACENT TO THE PROJECT FOR SEDIMENTATION FROM EROSION OR TRACKED SEDIMENT FROMVEHICLES. PERMITTEES MUST REMOVE SEDIMENT FROM ALL PAVED SURFACES WITHIN ONE (1) CALENDAR DAY OFDISCOVERY OR, IF APPLICABLE, WITHIN A SHORTER TIME TO AVOID A SAFETY HAZARD TO USERS OF PUBLIC STREETS.[MINN. R. 7090]11.7 PERMITTEES MUST REPAIR, REPLACE OR SUPPLEMENT ALL PERIMETER CONTROL DEVICES WHEN THEY BECOMENONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF THE HEIGHT OF THE DEVICE. [MINN. R. 7090]11.8 PERMITTEES MUST DRAIN TEMPORARY AND PERMANENT SEDIMENTATION BASINS AND REMOVE THE SEDIMENT WHENTHE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE VOLUME. [MINN. R. 7090]11.9 PERMITTEES MUST ENSURE THAT AT LEAST ONE INDIVIDUAL PRESENT ON THE SITE (OR AVAILABLE TO THE PROJECTSITE IN THREE (3) CALENDAR DAYS) IS TRAINED IN THE JOB DUTIES DESCRIBED IN ITEM 21.2.B. [MINN. R. 7090]11.10 PERMITTEES MAY ADJUST THE INSPECTION SCHEDULE DESCRIBED IN ITEM 11.2 AS FOLLOWS:A. INSPECTIONS OF AREAS WITH PERMANENT COVER CAN BE REDUCED TO ONCE PER MONTH, EVEN IF CONSTRUCTIONACTIVITY CONTINUES ON OTHER PORTIONS OF THE SITE; ORB. WHERE SITES HAVE PERMANENT COVER ON ALL EXPOSED SOIL AND NO CONSTRUCTION ACTIVITY IS OCCURRINGANYWHERE ON THE SITE, INSPECTIONS CAN BE REDUCED TO ONCE PER MONTH AND, AFTER 12 MONTHS, MAY BESUSPENDED COMPLETELY UNTIL CONSTRUCTION ACTIVITY RESUMES. THE MPCA MAY REQUIRE INSPECTIONS TORESUME IF CONDITIONS WARRANT; ORC. WHERE CONSTRUCTION ACTIVITY HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, INSPECTIONS MAY BESUSPENDED. INSPECTIONS MUST RESUME WITHIN 24 HOURS OF RUNOFF OCCURRING, OR UPON RESUMINGCONSTRUCTION, WHICHEVER COMES FIRST. [MINN. R. 7090]11.11 PERMITTEES MUST RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES WITHIN 24 HOURS OF BEINGCONDUCTED AND THESE RECORDS MUST BE RETAINED WITH THE SWPPP. THESE RECORDS MUST INCLUDE:A. DATE AND TIME OF INSPECTIONS; ANDB. NAME OF PERSONS CONDUCTING INSPECTIONS; ANDC. ACCURATE FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE ACTIONS ARENEEDED; ANDD. CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE ACTIVITIES); ANDE. DATE OF ALL RAINFALL EVENTS GREATER THAN 1/2 INCHES IN 24 HOURS, AND THE AMOUNT OF RAINFALL FOR EACHEVENT. PERMITTEES MUST OBTAIN RAINFALL AMOUNTS BY EITHER A PROPERLY MAINTAINED RAIN GAUGE INSTALLEDONSITE, A WEATHER STATION THAT IS WITHIN ONE (1) MILE OF YOUR LOCATION, OR A WEATHER REPORTING SYSTEMTHAT PROVIDES SITE SPECIFIC RAINFALL DATA FROM RADAR SUMMARIES; ANDF. IF PERMITTEES OBSERVE A DISCHARGE DURING THE INSPECTION, THEY MUST RECORD AND SHOULD PHOTOGRAPH ANDDESCRIBE THE LOCATION OF THE DISCHARGE (I.E., COLOR, ODOR, SETTLED OR SUSPENDED SOLIDS, OIL SHEEN, ANDOTHER OBVIOUS INDICATORS OF POLLUTANTS); ANDG. ANY AMENDMENTS TO THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE DOCUMENTED AS REQUIREDIN SECTION 6 WITHIN SEVEN (7) CALENDAR DAYS. [MINN. R. 7090]12.1 POLLUTION PREVENTION MANAGEMENT MEASURES. [MINN. R. 7090]12.2 PERMITTEES MUST PLACE BUILDING PRODUCTS AND LANDSCAPE MATERIALS UNDER COVER (E.G., PLASTIC SHEETINGOR TEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITHSTORMWATER. PERMITTEES ARE NOT REQUIRED TO COVER OR PROTECT PRODUCTS WHICH ARE EITHER NOT A SOURCE OFCONTAMINATION TO STORMWATER OR ARE DESIGNED TO BE EXPOSED TO STORMWATER. [MINN. R. 7090]12.3 PERMITTEES MUST PLACE PESTICIDES, FERTILIZERS AND TREATMENT CHEMICALS UNDER COVER (E.G., PLASTICSHEETING OR TEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACTWITH STORMWATER. [MINN. R. 7090]12.4 PERMITTEES MUST STORE HAZARDOUS MATERIALS AND TOXIC WASTE, (INCLUDING OIL, DIESEL FUEL, GASOLINE,HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURINGCOMPOUNDS, AND ACIDS) IN SEALED CONTAINERS TO PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. STORAGE ANDDISPOSAL OF HAZARDOUS WASTE MATERIALS MUST BE IN COMPLIANCE WITH MINN. R. CH. 7045 INCLUDING SECONDARYCONTAINMENT AS APPLICABLE. [MINN. R. 7090]12.5 PERMITTEES MUST PROPERLY STORE, COLLECT AND DISPOSE SOLID WASTE IN COMPLIANCE WITH MINN. R. CH. 7035.[MINN. R. 7035]12.6 PERMITTEES MUST POSITION PORTABLE TOILETS SO THEY ARE SECURE AND WILL NOT TIP OR BE KNOCKED OVER.PERMITTEES MUST PROPERLY DISPOSE SANITARY WASTE IN ACCORDANCE WITH MINN. R. CH. 7041. [MINN. R. 7041]12.7 PERMITTEES MUST TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR LEAKED CHEMICALS,INCLUDING FUEL, FROM ANY AREA WHERE CHEMICALS OR FUEL WILL BE LOADED OR UNLOADED INCLUDING THE USE OFDRIP PANS OR ABSORBENTS UNLESS INFEASIBLE. PERMITTEES MUST ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALLTIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FORRECOVERED SPILLED MATERIALS. PERMITTEES MUST REPORT AND CLEAN UP SPILLS IMMEDIATELY AS REQUIRED BY MINN.STAT. 115.061, USING DRY CLEAN UP MEASURES WHERE POSSIBLE. [MINN. STAT. 115.061]12.8 PERMITTEES MUST LIMIT VEHICLE EXTERIOR WASHING AND EQUIPMENT TO A DEFINED AREA OF THE SITE. PERMITTEESMUST CONTAIN RUNOFF FROM THE WASHING AREA IN A SEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS ANDMUST DISPOSE WASTE FROM THE WASHING ACTIVITY PROPERLY. PERMITTEES MUST PROPERLY USE AND STORE SOAPS,DETERGENTS, OR SOLVENTS. [MINN. R. 7090]12.9 PERMITTEES MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUTOPERATIONS (E.G., CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTIONMATERIALS) RELATED TO THE CONSTRUCTION ACTIVITY. PERMITTEES MUST PREVENT LIQUID AND SOLID WASHOUT WASTESFROM CONTACTING THE GROUND AND MUST DESIGN THE CONTAINMENT SO IT DOES NOT RESULT IN RUNOFF FROM THEWASHOUT OPERATIONS OR AREAS. PERMITTEES MUST PROPERLY DISPOSE LIQUID AND SOLID WASTES IN COMPLIANCEWITH MPCA RULES. PERMITTEES MUST INSTALL A SIGN INDICATING THE LOCATION OF THE WASHOUT FACILITY. [MINN. R.7035, MINN. R. 7090]13.1 PERMIT TERMINATION CONDITIONS. [MINN. R. 7090]13.2 PERMITTEES MUST COMPLETE ALL CONSTRUCTION ACTIVITY AND MUST INSTALL PERMANENT COVER OVER ALL AREASPRIOR TO SUBMITTING THE NOT. VEGETATIVE COVER MUST CONSIST OF A UNIFORM PERENNIAL VEGETATION WITH ADENSITY OF 70 PERCENT OF ITS EXPECTED FINAL GROWTH. VEGETATION IS NOT REQUIRED WHERE THE FUNCTION OF ASPECIFIC AREA DICTATES NO VEGETATION, SUCH AS IMPERVIOUS SURFACES OR THE BASE OF A SAND FILTER. [MINN. R.7090]13.3 PERMITTEES MUST CLEAN THE PERMANENT STORMWATER TREATMENT SYSTEM OF ANY ACCUMULATED SEDIMENT ANDMUST ENSURE THE SYSTEM MEETS ALL APPLICABLE REQUIREMENTS IN SECTION 15 THROUGH 19 AND IS OPERATING ASDESIGNED. [MINN. R. 7090]13.4 PERMITTEES MUST REMOVE ALL SEDIMENT FROM CONVEYANCE SYSTEMS PRIOR TO SUBMITTING THE NOT. [MINN. R.7090]13.5 PERMITTEES MUST REMOVE ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMPS PRIORTO SUBMITTING THE NOT. PERMITTEES MAY LEAVE BMPS DESIGNED TO DECOMPOSE ON-SITE IN PLACE. [MINN. R. 7090]13.6 FOR RESIDENTIAL CONSTRUCTION ONLY, PERMIT COVERAGE TERMINATES ON INDIVIDUAL LOTS IF THE STRUCTURESARE FINISHED AND TEMPORARY EROSION PREVENTION AND DOWNGRADIENT PERIMETER CONTROL IS COMPLETE, THERESIDENCE SELLS TO THE HOMEOWNER, AND THE PERMITTEE DISTRIBUTES THE MPCA'S "HOMEOWNER FACT SHEET" TO THEHOMEOWNER. [MINN. R. 7090]13.7 FOR CONSTRUCTION PROJECTS ON AGRICULTURAL LAND (E.G., PIPELINES ACROSS CROPLAND), PERMITTEES MUSTRETURN THE DISTURBED LAND TO ITS PRECONSTRUCTION AGRICULTURAL USE PRIOR TO SUBMITTING THE NOT. [MINN. R.7090]14.1 TEMPORARY SEDIMENT BASINS. [MINN. R. 7090]14.2 WHERE TEN (10) OR MORE ACRES OF DISTURBED SOIL DRAIN TO A COMMON LOCATION, PERMITTEES MUST PROVIDE ATEMPORARY SEDIMENT BASIN TO PROVIDE TREATMENT OF THE RUNOFF BEFORE IT LEAVES THE CONSTRUCTION SITE ORENTERS SURFACE WATERS. PERMITTEES MAY CONVERT A TEMPORARY SEDIMENT BASIN TO A PERMANENT BASIN AFTERCONSTRUCTION IS COMPLETE. THE TEMPORARY BASIN IS NO LONGER REQUIRED WHEN PERMANENT COVER HAS REDUCEDTHE ACREAGE OF DISTURBED SOIL TO LESS THAN TEN (10) ACRES DRAINING TO A COMMON LOCATION. [MINN. R. 7090]14.3 THE TEMPORARY BASIN MUST PROVIDE LIVE STORAGE FOR A CALCULATED VOLUME OF RUNOFF FROM A TWO (2)-YEAR,24-HOUR STORM FROM EACH ACRE DRAINED TO THE BASIN OR 1,800 CUBIC FEET OF LIVE STORAGE PER ACRE DRAINED,WHICHEVER IS GREATER. [MINN. R. 7090]14.4 WHERE PERMITTEES HAVE NOT CALCULATED THE TWO (2)-YEAR, 24-HOUR STORM RUNOFF AMOUNT, THE TEMPORARYBASIN MUST PROVIDE 3,600 CUBIC FEET OF LIVE STORAGE PER ACRE OF THE BASINS' DRAINAGE AREA. [MINN. R. 7090]14.5 PERMITTEES MUST DESIGN BASIN OUTLETS TO PREVENT SHORT-CIRCUITING AND THE DISCHARGE OF FLOATINGDEBRIS. [MINN. R. 7090]14.6 PERMITTEES MUST DESIGN THE OUTLET STRUCTURE TO WITHDRAW WATER FROM THE SURFACE TO MINIMIZE THEDISCHARGE OF POLLUTANTS. PERMITTEES MAY TEMPORARILY SUSPEND THE USE OF A SURFACE WITHDRAWAL MECHANISMDURING FROZEN CONDITIONS. THE BASIN MUST INCLUDE A STABILIZED EMERGENCY OVERFLOW TO PREVENT FAILURE OFPOND INTEGRITY. [MINN. R. 7090]14.7 PERMITTEES MUST PROVIDE ENERGY DISSIPATION FOR THE BASIN OUTLET WITHIN 24 HOURS AFTER CONNECTION TOA SURFACE WATER. [MINN. R. 7090]14.8 PERMITTEES MUST LOCATE TEMPORARY BASINS OUTSIDE OF SURFACE WATERS AND ANY BUFFER ZONE REQUIRED INITEM 23.11. [MINN. R. 7090]14.9 PERMITTEES MUST CONSTRUCT THE TEMPORARY BASINS PRIOR TO DISTURBING 10 OR MORE ACRES OF SOIL DRAININGTO A COMMON LOCATION. [MINN. R. 7090]14.10 WHERE A TEMPORARY SEDIMENT BASIN MEETING THE REQUIREMENTS OF ITEM 14.3 THROUGH 14.9 IS INFEASIBLE,PERMITTEES MUST INSTALL EFFECTIVE SEDIMENT CONTROLS SUCH AS SMALLER SEDIMENT BASINS AND/OR SEDIMENTTRAPS, SILT FENCES, VEGETATIVE BUFFER STRIPS OR ANY APPROPRIATE COMBINATION OF MEASURES AS DICTATED BYINDIVIDUAL SITE CONDITIONS. IN DETERMINING WHETHER INSTALLING A SEDIMENT BASIN IS INFEASIBLE, PERMITTEESMUST CONSIDER PUBLIC SAFETY AND MAY CONSIDER FACTORS SUCH AS SITE SOILS, SLOPE, AND AVAILABLE AREA ON-SITE.PERMITTEES MUST DOCUMENT THIS DETERMINATION OF INFEASIBILITY IN THE SWPPP. [MINN. R. 7090]15.1 PERMANENT STORMWATER TREATMENT SYSTEM. [MINN. R. 7090]15.2 PERMITTEES MUST DESIGN THE PROJECT SO ALL STORMWATER DISCHARGED FROM THE PROJECT DURING AND AFTERCONSTRUCTION ACTIVITIES DOES NOT CAUSE A VIOLATION OF STATE WATER QUALITY STANDARDS, INCLUDING NUISANCECONDITIONS, EROSION IN RECEIVING CHANNELS OR ON DOWNSLOPE PROPERTIES, OR A SIGNIFICANT ADVERSE IMPACT TOWETLANDS CAUSED BY INUNDATION OR DECREASE OF FLOW. [MINN. R. 7090]15.3 PERMITTEES MUST DESIGN AND CONSTRUCT A PERMANENT STORMWATER TREATMENT SYSTEM TO TREAT THE WATERQUALITY VOLUME IF THE PROJECT'S ULTIMATE DEVELOPMENT REPLACES VEGETATION AND/OR OTHER PERVIOUS SURFACESCREATING A NET INCREASE OF ONE (1) OR MORE ACRES OF CUMULATIVE IMPERVIOUS SURFACE. [MINN. R. 7090]15.4 PERMITTEES MUST CALCULATE THE WATER QUALITY VOLUME AS ONE (1) INCH TIMES THE NET INCREASE OFIMPERVIOUS SURFACES CREATED BY THE PROJECT. [MINN. R. 7090]15.5 PERMITTEES MUST FIRST CONSIDER VOLUME REDUCTION PRACTICES ON-SITE (E.G., INFILTRATION OR OTHER) WHENDESIGNING THE PERMANENT STORMWATER TREATMENT SYSTEM. IF THIS PERMIT PROHIBITS INFILTRATION AS DESCRIBEDIN ITEM 16.14 THROUGH ITEM 16.21, PERMITTEES MAY CONSIDER A WET SEDIMENTATION BASIN, FILTRATION BASIN ORREGIONAL POND. THIS PERMIT DOES NOT CONSIDER WET SEDIMENTATION BASINS AND FILTRATION SYSTEMS TO BEVOLUME REDUCTION PRACTICES. [MINN. R. 7090]15.6 FOR PROJECTS WHERE THE FULL VOLUME REDUCTION REQUIREMENT CANNOT BE MET ON-SITE, (E.G., THE SITE HASINFILTRATION PROHIBITIONS), PERMITTEES MUST DOCUMENT THE REASONS IN THE SWPPP. [MINN. R. 7090]15.7 PERMITTEES MUST DISCHARGE THE WATER QUALITY VOLUME TO A PERMANENT STORMWATER TREATMENT SYSTEMPRIOR TO DISCHARGE TO A SURFACE WATER. FOR PURPOSES OF THIS ITEM, SURFACE WATERS DO NOT INCLUDE MAN-MADEDRAINAGE SYSTEMS THAT CONVEY STORMWATER TO A PERMANENT STORMWATER TREATMENT SYSTEM. [MINN. R. 7090]15.8 WHERE THE PROXIMITY TO BEDROCK PRECLUDES THE INSTALLATION OF ANY OF THE PERMANENT STORMWATERTREATMENT PRACTICES REQUIRED BY SECTIONS 15 THROUGH 19, PERMITTEES MUST INSTALL OTHER TREATMENT SUCH ASGRASSED SWALES, SMALLER PONDS, OR GRIT CHAMBERS, PRIOR TO THE DISCHARGE OF STORMWATER TO SURFACEWATERS. [MINN. R. 7090]15.9 FOR LINEAR PROJECTS WHERE PERMITTEES CANNOT TREAT THE ENTIRE WATER QUALITY VOLUME WITHIN THEEXISTING RIGHTOF-WAY, PERMITTEES MUST MAKE A REASONABLE ATTEMPT TO OBTAIN ADDITIONAL RIGHT-OF-WAY,EASEMENT OR OTHER PERMISSION FOR STORMWATER TREATMENT DURING THE PROJECT PLANNING PROCESS.DOCUMENTATION OF THESE ATTEMPTS MUST BE IN THE SWPPP. PERMITTEES MUST STILL CONSIDER VOLUME REDUCTIONPRACTICES FIRST AS DESCRIBED IN ITEM 15.5. IF PERMITTEES CANNOT OBTAIN ADDITIONAL RIGHT-OF-WAY, EASEMENT OROTHER PERMISSION, THEY MUST MAXIMIZE THE TREATMENT OF THE WATER QUALITY VOLUME PRIOR TO DISCHARGE TOSURFACE WATERS. [MINN. R. 7090]16.1 INFILTRATION SYSTEMS. [MINN. R. 7090]16.2 INFILTRATION OPTIONS INCLUDE, BUT ARE NOT LIMITED TO: INFILTRATION BASINS, INFILTRATION TRENCHES,RAINWATER GARDENS, BIORETENTION AREAS WITHOUT UNDERDRAINS, SWALES WITH IMPERMEABLE CHECK DAMS, ANDNATURAL DEPRESSIONS. IF PERMITTEES UTILIZE AN INFILTRATION SYSTEM TO MEET THE REQUIREMENTS OF THIS PERMIT,THEY MUST INCORPORATE THE DESIGN PARAMETERS IN ITEM 16.3 THROUGH ITEM 16.21. PERMITTEES MUST FOLLOW THEINFILTRATION PROHIBITION IN ITEM 16.14 ANYTIME AN INFILTRATION SYSTEM IS DESIGNED, INCLUDING THOSE NOTREQUIRED BY THIS PERMIT. [MINN. R. 7090]16.3 PERMITTEES MUST DESIGN INFILTRATION SYSTEMS SUCH THAT PRE-EXISTING HYDROLOGIC CONDITIONS OFWETLANDS IN THE VICINITY ARE NOT IMPACTED (E.G., INUNDATION OR BREACHING A PERCHED WATER TABLE SUPPORTINGA WETLAND). [MINN. R. 7090]16.4 PERMITTEES MUST NOT EXCAVATE INFILTRATION SYSTEMS TO FINAL GRADE, OR WITHIN THREE (3) FEET OF FINALGRADE, UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN CONSTRUCTED AND FULLY STABILIZED UNLESS THEYPROVIDE RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO KEEP SEDIMENT ANDRUNOFF COMPLETELY AWAY FROM THE INFILTRATION AREA. [MINN. R. 7090]16.5 WHEN EXCAVATING AN INFILTRATION SYSTEM TO WITHIN THREE (3) FEET OF FINAL GRADE, PERMITTEES MUST STAKEOFF AND MARK THE AREA SO HEAVY CONSTRUCTION VEHICLES OR EQUIPMENT DO NOT COMPACT THE SOIL IN THEINFILTRATION AREA. [MINN. R. 7090]16.6 PERMITTEES MUST USE A PRETREATMENT DEVICE SUCH AS A VEGETATED FILTER STRIP, FOREBAY, OR WATER QUALITYINLET (E.G., GRIT CHAMBER) TO REMOVE SOLIDS, FLOATING MATERIALS, AND OIL AND GREASE FROM THE RUNOFF, TO THEMAXIMUM EXTENT PRACTICABLE, BEFORE THE SYSTEM ROUTES STORMWATER TO THE INFILTRATION SYSTEM. [MINN. R.7090]16.7 PERMITTEES MUST DESIGN INFILTRATION SYSTEMS TO PROVIDE A WATER QUALITY VOLUME (CALCULATED AS ANINSTANTANEOUS VOLUME) OF ONE (1) INCH OF RUNOFF, OR ONE (1) INCH MINUS THE VOLUME OF STORMWATER TREATEDBY ANOTHER SYSTEM ON THE SITE, FROM THE NET INCREASE OF IMPERVIOUS SURFACES CREATED BY THE PROJECT. [MINN.R. 7090]16.8 PERMITTEES MUST DESIGN THE INFILTRATION SYSTEM TO DISCHARGE ALL STORMWATER (INCLUDING STORMWATER INEXCESS OF THE WATER QUALITY VOLUME) ROUTED TO THE SYSTEM THROUGH THE UPPERMOST SOIL SURFACE ORENGINEERED MEDIA SURFACE WITHIN 48 HOURS. PERMITTEES MUST ROUTE ADDITIONAL FLOWS THAT CANNOT INFILTRATEWITHIN 48 HOURS TO BYPASS THE SYSTEM THROUGH A STABILIZED DISCHARGE POINT. [MINN. R. 7090]16.9 PERMITTEES MUST PROVIDE A MEANS TO VISUALLY VERIFY THE INFILTRATION SYSTEM IS DISCHARGING THROUGH THESOIL SURFACE OR FILTER MEDIA SURFACE WITHIN 48 HOURS OR LESS. [MINN. R. 7090]16.10 PERMITTEES MUST PROVIDE AT LEAST ONE SOIL BORING, TEST PIT OR INFILTROMETER TEST IN THE LOCATION OFTHE INFILTRATION PRACTICE FOR DETERMINING INFILTRATION RATES. [MINN. R. 7090]16.11 FOR DESIGN PURPOSES, PERMITTEES MUST DIVIDE FIELD MEASURED INFILTRATION RATES BY 2 AS A SAFETY FACTOROR PERMITTEES CAN USE SOIL-BORING RESULTS WITH THE INFILTRATION RATE CHART IN THE MINNESOTA STORMWATERMANUAL TO DETERMINE DESIGN INFILTRATION RATES. WHEN SOIL BORINGS INDICATE TYPE A SOILS, PERMITTEES SHOULDPERFORM FIELD MEASUREMENTS TO VERIFY THE RATE IS NOT ABOVE 8.3 INCHES PER HOUR. THIS PERMIT PROHIBITSINFILTRATION IF THE FIELD MEASURED INFILTRATION RATE IS ABOVE 8.3 INCHES PER HOUR. [MINN. R. 7090]16.12 PERMITTEES MUST EMPLOY APPROPRIATE ON-SITE TESTING ENSURE A MINIMUM OF THREE (3) FEET OF SEPARATIONFROM THE SEASONALLY SATURATED SOILS (OR FROM BEDROCK) AND THE BOTTOM OF THE PROPOSED INFILTRATIONSYSTEM. [MINN. R. 7090]16.13 PERMITTEES MUST DESIGN A MAINTENANCE ACCESS, TYPICALLY EIGHT (8) FEET WIDE, FOR THE INFILTRATIONSYSTEM. [MINN. R. 7090]16.14 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS THAT RECEIVE RUNOFF FROMVEHICLE FUELING AND MAINTENANCE AREAS INCLUDING CONSTRUCTION OF INFILTRATION SYSTEMS NOT REQUIRED BYTHIS PERMIT. [MINN. R. 7090]16.15 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS WHERE INFILTRATINGSTORMWATER MAY MOBILIZE HIGH LEVELS OF CONTAMINANTS IN SOIL OR GROUNDWATER. PERMITTEES MUST EITHERCOMPLETE THE MPCA'S CONTAMINATION SCREENING CHECKLIST OR CONDUCT THEIR OWN ASSESSMENT TO DETERMINE THESUITABILITY FOR INFILTRATION. PERMITTEES MUST RETAIN THE CHECKLIST OR ASSESSMENT WITH THE SWPPP. FOR MOREINFORMATION AND TO ACCESS THE MPCA'S "CONTAMINATION SCREENING CHECKLIST" SEE THE MINNESOTA STORMWATERMANUAL. [MINN. R. 7090]16.16 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS WHERE SOILINFILTRATION RATES ARE FIELD MEASURED AT MORE THAN 8.3 INCHES PER HOUR UNLESS THEY AMEND SOILS TO SLOWTHE INFILTRATION RATE BELOW 8.3 INCHES PER HOUR. [MINN. R. 7090]16.17 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS WITH LESS THANTHREE (3) FEET OF SEPARATION DISTANCE FROM THE BOTTOM OF THE INFILTRATION SYSTEM TO THE ELEVATION OF THESEASONALLY SATURATED SOILS OR THE TOP OF BEDROCK. [MINN. R. 7090]16.18 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS OF PREDOMINATELYHYDROLOGIC SOIL GROUP TYPE D SOILS (CLAY). [MINN. R. 7090]16.19 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS WITHIN A DRINKING WATERSUPPLY MANAGEMENT AREA (DWSMA) AS DEFINED IN MINN. R. 4720.5100, SUBP. 13, IF THE SYSTEM WILL BE LOCATED:A. IN AN EMERGENCY RESPONSE AREA (ERA) WITHIN A DWSMA CLASSIFIED AS HAVING HIGH OR VERY HIGHVULNERABILITY AS DEFINED BY THE MINNESOTA DEPARTMENT OF HEALTH; ORB. IN AN ERA WITHIN A DWSMA CLASSIFIED AS MODERATE VULNERABILITY UNLESS A REGULATED MS4 PERMITTEEPERFORMED OR APPROVED A HIGHER LEVEL OF ENGINEERING REVIEW SUFFICIENT TO PROVIDE A FUNCTIONINGTREATMENT SYSTEM AND TO PREVENT ADVERSE IMPACTS TO GROUNDWATER; ORC. OUTSIDE OF AN ERA WITHIN A DWSMA CLASSIFIED AS HAVING HIGH OR VERY HIGH VULNERABILITY, UNLESS AREGULATED MS4 PERMITTEE PERFORMED OR APPROVED A HIGHER LEVEL OF ENGINEERING REVIEW SUFFICIENT TOPROVIDE A FUNCTIONING TREATMENT SYSTEM AND TO PREVENT ADVERSE IMPACTS TO GROUNDWATER.SEE "HIGHER LEVEL OF ENGINEERING REVIEW" IN THE MINNESOTA STORMWATER MANUAL FOR MORE INFORMATION. [MINN.R. 7090]16.20 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS WITHIN 1,000 FEETUPGRADIENT OR 100 FEET DOWNGRADIENT OF ACTIVE KARST FEATURES. [MINN. R. 7090]16.21 THIS PERMIT PROHIBITS PERMITTEES FROM CONSTRUCTING INFILTRATION SYSTEMS IN AREAS THAT RECEIVE RUNOFFFROM THE FOLLOWING INDUSTRIAL FACILITIES NOT AUTHORIZED TO INFILTRATE STORMWATER UNDER THE NPDESSTORMWATER PERMIT FOR INDUSTRIAL ACTIVITIES: AUTOMOBILE SALVAGE YARDS; SCRAP RECYCLING AND WASTERECYCLING FACILITIES; HAZARDOUS WASTE TREATMENT, STORAGE, OR DISPOSAL FACILITIES; OR AIR TRANSPORTATIONFACILITIES THAT CONDUCT DEICING ACTIVITIES. [MINN. R. 7090]17.1 FILTRATION SYSTEMS. [MINN. R. 7090]17.2 FILTRATION OPTIONS INCLUDE, BUT ARE NOT LIMITED TO: SAND FILTERS WITH UNDERDRAINS, BIOFILTRATION AREAS,SWALES USING UNDERDRAINS WITH IMPERMEABLE CHECK DAMS AND UNDERGROUND SAND FILTERS. IF PERMITTEESUTILIZE A FILTRATION SYSTEM TO MEET THE PERMANENT STORMWATER TREATMENT REQUIREMENTS OF THIS PERMIT, THEYMUST COMPLY WITH ITEMS 17.3 THROUGH 17.11. [MINN. R. 7090]17.3 PERMITTEES MUST NOT INSTALL FILTER MEDIA UNTIL THEY CONSTRUCT AND FULLY STABILIZE THE CONTRIBUTINGDRAINAGE AREA UNLESS THEY PROVIDE RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS (E.G., DIVERSIONBERMS) TO KEEP SEDIMENT AND RUNOFF COMPLETELY AWAY FROM THE FILTRATION AREA. [MINN. R. 7090]17.4 PERMITTEES MUST DESIGN FILTRATION SYSTEMS TO REMOVE AT LEAST 80 PERCENT OF TSS. [MINN. R. 7090]17.5 PERMITTEES MUST USE A PRETREATMENT DEVICE SUCH AS A VEGETATED FILTER STRIP, SMALL SEDIMENTATION BASIN,WATER QUALITY INLET, FOREBAY OR HYDRODYNAMIC SEPARATOR TO REMOVE SETTLEABLE SOLIDS, FLOATING MATERIALS,AND OILS AND GREASE FROM THE RUNOFF, TO THE MAXIMUM EXTENT PRACTICABLE, BEFORE RUNOFF ENTERS THEFILTRATION SYSTEM. [MINN. R. 7090]17.6 PERMITTEES MUST DESIGN FILTRATION SYSTEMS TO TREAT A WATER QUALITY VOLUME (CALCULATED AS ANINSTANTANEOUS VOLUME) OF ONE (1) INCH OF RUNOFF, OR ONE (1) INCH MINUS THE VOLUME OF STORMWATER TREATEDBY ANOTHER SYSTEM ON THE SITE, FROM THE NET INCREASE OF IMPERVIOUS SURFACES CREATED BY THE PROJECT. [MINN.R. 7090]17.7 PERMITTEES MUST DESIGN THE FILTRATION SYSTEM TO DISCHARGE ALL STORMWATER (INCLUDING STORMWATER INEXCESS OF THE WATER QUALITY VOLUME) ROUTED TO THE SYSTEM THROUGH THE UPPERMOST SOIL SURFACE ORENGINEERED MEDIA SURFACE WITHIN 48 HOURS. ADDITIONAL FLOWS THAT THE SYSTEM CANNOT FILTER WITHIN 48 HOURSMUST BYPASS THE SYSTEM OR DISCHARGE THROUGH AN EMERGENCY OVERFLOW. [MINN. R. 7090]17.8 PERMITTEES MUST DESIGN THE FILTRATION SYSTEM TO PROVIDE A MEANS TO VISUALLY VERIFY THE SYSTEM ISDISCHARGING THROUGH THE SOIL SURFACE OR FILTER MEDIA WITHIN 48 HOURS. [MINN. R. 7090]17.9 PERMITTEES MUST EMPLOY APPROPRIATE ON-SITE TESTING TO ENSURE A MINIMUM OF THREE (3) FEET OF SEPARATIONBETWEEN THE SEASONALLY SATURATED SOILS (OR FROM BEDROCK) AND THE BOTTOM OF THE PROPOSED FILTRATIONSYSTEM. [MINN. R. 7090]17.10 PERMITTEES MUST ENSURE THAT FILTRATION SYSTEMS WITH LESS THAN THREE (3) FEET OF SEPARATION BETWEENSEASONALLY SATURATED SOILS OR FROM BEDROCK ARE CONSTRUCTED WITH AN IMPERMEABLE LINER. [MINN. R. 7090]17.11 THE PERMITTEES MUST DESIGN A MAINTENANCE ACCESS, TYPICALLY EIGHT (8) FEET WIDE, FOR THE FILTRATIONSYSTEM. [MINN. R. 7090]18.1 WET SEDIMENTATION BASIN. [MINN. R. 7090]18.2 PERMITTEES USING A WET SEDIMENTATION BASIN TO MEET THE PERMANENT STORMWATER TREATMENTREQUIREMENTS OF THIS PERMIT MUST INCORPORATE THE DESIGN PARAMETERS IN ITEM 18.3 THROUGH 18.10. [MINN. R.7090]18.3 PERMITTEES MUST DESIGN THE BASIN TO HAVE A PERMANENT VOLUME OF 1,800 CUBIC FEET OF STORAGE BELOW THEOUTLET PIPE FOR EACH ACRE THAT DRAINS TO THE BASIN. THE BASIN'S PERMANENT VOLUME MUST REACH A MINIMUMDEPTH OF AT LEAST THREE (3) FEET AND MUST HAVE NO DEPTH GREATER THAN 10 FEET. PERMITTEES MUST CONFIGURETHE BASIN TO MINIMIZE SCOUR OR RESUSPENSION OF SOLIDS. [MINN. R. 7090]18.4 PERMITTEES MUST DESIGN THE BASIN TO PROVIDE LIVE STORAGE FOR A WATER QUALITY VOLUME (CALCULATED AS ANINSTANTANEOUS VOLUME) OF ONE (1) INCH OF RUNOFF, OR ONE (1) INCH MINUS THE VOLUME OF STORMWATER TREATEDBY ANOTHER SYSTEM ON THE SITE, FROM THE NET INCREASE IN IMPERVIOUS SURFACES CREATED BY THE PROJECT. [MINN.R. 7090]18.5 PERMITTEES MUST DESIGN BASIN OUTLETS SO THE WATER QUALITY VOLUME DISCHARGES AT NO MORE THAN 5.66CUBIC FEET PER SECOND (CFS) PER ACRE OF SURFACE AREA OF THE BASIN. [MINN. R. 7090]18.6 PERMITTEES MUST DESIGN BASIN OUTLETS TO PREVENT SHORT-CIRCUITING AND THE DISCHARGE OF FLOATINGDEBRIS. BASIN OUTLETS MUST HAVE ENERGY DISSIPATION. [MINN. R. 7090]18.7 PERMITTEES MUST DESIGN THE BASIN TO INCLUDE A STABILIZED EMERGENCY OVERFLOW TO ACCOMMODATE STORMEVENTS IN EXCESS OF THE BASIN'S HYDRAULIC DESIGN. [MINN. R. 7090]18.8 PERMITTEES MUST DESIGN A MAINTENANCE ACCESS, TYPICALLY EIGHT (8) FEET WIDE, FOR THE BASIN. [MINN. R.7090]18.9 PERMITTEES MUST LOCATE BASINS OUTSIDE OF SURFACE WATERS AND ANY BUFFER ZONE REQUIRED IN ITEM 23.11.PERMITTEES MUST DESIGN BASINS TO AVOID DRAINING WATER FROM WETLANDS UNLESS THE IMPACT TO THE WETLANDCOMPLIES WITH THE REQUIREMENTS OF SECTION 22. [MINN. R. 7090]18.10 PERMITTEES MUST DESIGN BASINS USING AN IMPERMEABLE LINER IF LOCATED WITHIN ACTIVE KARST TERRAIN.[MINN. R. 7090]19.1 REGIONAL WET SEDIMENTATION BASINS. [MINN. R. 7090]19.2 WHEN THE ENTIRE WATER QUALITY VOLUME CANNOT BE RETAINED ONSITE, PERMITTEES CAN USE OR CREATEREGIONAL WET SEDIMENTATION BASINS PROVIDED THEY ARE CONSTRUCTED BASINS, NOT A NATURAL WETLAND OR WATERBODY, (WETLANDS USED AS REGIONAL BASINS MUST BE MITIGATED FOR, SEE SECTION 22). THE OWNER MUST ENSURE THEREGIONAL BASIN CONFORMS TO ALL REQUIREMENTS FOR A WET SEDIMENTATION BASIN AS DESCRIBED IN ITEMS 18.3THROUGH 18.10 AND MUST BE LARGE ENOUGH TO ACCOUNT FOR THE ENTIRE AREA THAT DRAINS TO THE REGIONAL BASIN.PERMITTEES MUST VERIFY THAT THE REGIONAL BASIN WILL DISCHARGE AT NO MORE THAN 5.66 CFS PER ACRE OF SURFACEAREA OF THE BASIN AND MUST PROVIDE A LIVE STORAGE VOLUME OF ONE INCH TIMES ALL THE IMPERVIOUS AREADRAINING TO THE BASIN. PERMITTEES CANNOT SIGNIFICANTLY DEGRADE WATERWAYS BETWEEN THE PROJECT AND THEREGIONAL BASIN. THE OWNER MUST OBTAIN WRITTEN AUTHORIZATION FROM THE APPLICABLE LGU OR PRIVATE ENTITYTHAT OWNS AND MAINTAINS THE REGIONAL BASIN. [MINN. R. 7090]20.1 SWPPP AVAILABILITY. [MINN. R. 7090]20.2 PERMITTEES MUST KEEP THE SWPPP, INCLUDING ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDSAT THE SITE DURING NORMAL WORKING HOURS BY PERMITTEES WHO HAVE OPERATIONAL CONTROL OF THAT PORTION OFTHE SITE. [MINN. R. 7090]21.1 TRAINING REQUIREMENTS. [MINN. R. 7090]21.2 PERMITTEES MUST ENSURE ALL OF THE FOLLOWING INDIVIDUALS RECEIVE TRAINING AND THE CONTENT AND EXTENTOF THE TRAINING IS COMMENSURATE WITH THE INDIVIDUAL'S JOB DUTIES AND RESPONSIBILITIES WITH REGARD TOACTIVITIES COVERED UNDER THIS PERMIT:A. INDIVIDUALS PREPARING THE SWPPP FOR THE PROJECT.B. INDIVIDUALS OVERSEEING IMPLEMENTATION OF, REVISING AND/OR AMENDING THE SWPPP AND INDIVIDUALSPERFORMING INSPECTIONS FOR THE PROJECT. ONE OF THESE INDIVIDUALS MUST BE AVAILABLE FOR AN ONSITEINSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA.C. INDIVIDUALS PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR OF BMPS. [MINN. R. 7090]21.3 PERMITTEES MUST ENSURE INDIVIDUALS IDENTIFIED IN SECTION 21 RECEIVE TRAINING FROM LOCAL, STATE, FEDERALAGENCIES, PROFESSIONAL ORGANIZATIONS, OR OTHER ENTITIES WITH EXPERTISE IN EROSION PREVENTION, SEDIMENTCONTROL, PERMANENT STORMWATER TREATMENT AND THE MINNESOTA NPDES/SDS CONSTRUCTION STORMWATER PERMIT.PERMITTEES MUST ENSURE THESE INDIVIDUALS ATTEND A REFRESHER-TRAINING COURSE EVERY THREE (3) YEARS. [MINN.R. 7090]24.1 GENERAL PROVISIONS. [MINN. R. 7090]24.2 IF THE MPCA DETERMINES THAT AN INDIVIDUAL PERMIT WOULD MORE APPROPRIATELY REGULATE THE CONSTRUCTIONACTIVITY, THE MPCA MAY REQUIRE AN INDIVIDUAL PERMIT TO CONTINUE THE CONSTRUCTION ACTIVITY. COVERAGE UNDERTHIS GENERAL PERMIT WILL REMAIN IN EFFECT UNTIL THE MPCA ISSUES AN INDIVIDUAL PERMIT. [MINN. R. 7001.0210,SUBP. 6]24.3 IF THE PERMITTEE CANNOT MEET THE TERMS AND CONDITIONS OF THIS GENERAL PERMIT, AN OWNER MAY REQUESTAN INDIVIDUAL PERMIT, IN ACCORDANCE WITH MINN. R. 7001.0210 SUBP. 6. [MINN. R. 7001.0210, SUBP. 6]24.4 ANY INTERESTED PERSON MAY PETITION THE MPCA TO REQUIRE AN INDIVIDUAL NPDES/SDS PERMIT IN ACCORDANCEWITH 40 CFR 122.28(B)(3). [40 CFR 122.29(B)(3)]24.5 PERMITTEES MUST MAKE THE SWPPP, INCLUDING ALL INSPECTION REPORTS, MAINTENANCE RECORDS, TRAININGRECORDS AND OTHER INFORMATION REQUIRED BY THIS PERMIT, AVAILABLE TO FEDERAL, STATE, AND LOCAL OFFICIALSWITHIN THREE (3) DAYS UPON REQUEST FOR THE DURATION OF THE PERMIT AND FOR THREE (3) YEARS FOLLOWING THENOT. [MINN. R. 7090]24.6 PERMITTEES MAY NOT ASSIGN OR TRANSFER THIS PERMIT EXCEPT WHEN THE TRANSFER OCCURS IN ACCORDANCEWITH THE APPLICABLE REQUIREMENTS OF ITEM 3.7 AND 3.8. [MINN. R. 7090]24.7 NOTHING IN THIS PERMIT MUST BE CONSTRUED TO RELIEVE THE PERMITTEES FROM CIVIL OR CRIMINAL PENALTIESFOR NONCOMPLIANCE WITH THE TERMS AND CONDITIONS PROVIDED HEREIN. NOTHING IN THIS PERMIT MUST BECONSTRUED TO PRECLUDE THE INITIATION OF ANY LEGAL ACTION OR RELIEVE THE PERMITTEES FROM ANYRESPONSIBILITIES, LIABILITIES, OR PENALTIES TO WHICH THE PERMITTEES IS/ARE OR MAY BE SUBJECT TO UNDER SECTION311 OF THE CLEAN WATER ACT AND MINN. STAT. SECT. 115 AND 116, AS AMENDED. PERMITTEES ARE NOT LIABLE FORPERMIT REQUIREMENTS FOR ACTIVITIES OCCURRING ON THOSE PORTIONS OF A SITE WHERE THE PERMIT HAS BEENTRANSFERRED TO ANOTHER PARTY AS REQUIRED IN ITEM 3.7 OR THE PERMITTEES HAVE SUBMITTED THE NOT AS REQUIREDIN SECTION 4. [MINN. R. 7090]24.8 THE PROVISIONS OF THIS PERMIT ARE SEVERABLE. IF ANY PROVISION OF THIS PERMIT OR THE APPLICATION OF ANYPROVISION OF THIS PERMIT TO ANY CIRCUMSTANCES IS HELD INVALID, THE APPLICATION OF SUCH PROVISION TO OTHERCIRCUMSTANCES, AND THE REMAINDER OF THIS PERMIT MUST NOT BE AFFECTED THEREBY. [MINN. R. 7090]24.9 THE PERMITTEES MUST COMPLY WITH THE PROVISIONS OF MINN. R. 7001.0150, SUBP. 3 AND MINN. R. 7001.1090,SUBP. 1(A), 1(B), 1(C), 1(H), 1(I), 1(J), 1(K), AND 1(L). [MINN. R. 7090]24.10 THE PERMITTEES MUST ALLOW ACCESS AS PROVIDED IN 40 CFR 122.41(I) AND MINN. STAT. SECT. 115.04. THEPERMITTEES MUST ALLOW REPRESENTATIVES OF THE MPCA OR ANY MEMBER, EMPLOYEE OR AGENT THEREOF, WHENAUTHORIZED BY IT, UPON PRESENTATION OF CREDENTIALS, TO ENTER UPON ANY PROPERTY, PUBLIC OR PRIVATE, FOR THEPURPOSE OF OBTAINING INFORMATION OR EXAMINATION OF RECORDS OR CONDUCTING SURVEYS OR INVESTIGATIONS. [40CFR 122.41(I)]24.11 FOR THE PURPOSES OF MINN. R. 7090 AND OTHER DOCUMENTS THAT REFERENCE SPECIFIC SECTIONS OF THISPERMIT, "STORMWATER DISCHARGE DESIGN REQUIREMENTS" CORRESPONDS TO SECTIONS 5, 6 AND 14 THROUGH 21;"CONSTRUCTION ACTIVITY REQUIREMENTS" CORRESPONDS TO SECTIONS 7 THROUGH 13; AND "APPENDIX A"CORRESPONDS TO SECTIONS 22 AND 23. [MINN. R. 7090]CONSTRUCTION PLANS9-14-22