My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-26-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
04-26-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 5:08:29 PM
Creation date
8/23/2023 8:26:09 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
77060900v2 <br /> <br /> <br /> <br /> S6-4 <br /> <br />after the date thereof shall have been true and correct in all respects on the date o n when made and shall <br />also be true and correct in all material respects on the Borrower on the date of such Requisition (except to <br />the extent of changes resulting from transactions contemplated or permitted by the Funding Loan <br />Documents). <br />4. No Damage. If the Improvements shall have been materially injured or damaged by fire, explosion, <br />accident, flood or other casualty, such Improvements are able to be and are diligently being restored in <br />accordance with the terms of the Mortgage. <br />5. Receipt by Controlling Person. The Controlling Person shall have received: <br />(a) Requisition. A completed Requisition in the form set forth on Exhibit B to this Agreement, <br />accompanied by the certificates, applications, invoices and other materials required thereby <br />together with approval of the portion of the Requisition applicable to the Work for such Advance <br />by the Engineering Consultant, accompanied by a certificate or report from the Engineering <br />Consultant to the effect that in its opinion, based on site observations and submissions by the <br />Contractor, the Work for which the Advance is requested to the date thereof was performed in a <br />good and workmanlike manner and stating that the remaining non-disbursed portion of the Funding <br />Loan proceeds and other available funds specified in the Development Budget are adequate to <br />complete construction of the Improvements in accordance with the Plans and Specifications; and <br />(b) Endorsement to Title Policy. At the time of each advance to update the date of and increase <br />the amount of coverage by the amount of such advance, such endorsements (a “Down Date <br />Endorsement”) shall be delivered by the Title Insurer, increasing the coverage under the Title <br />Policy by the amount of the approved Requisition plus the amount of any proceeds of the Funding <br />Loan disbursed from the Capitalized Interest Account of the Project Fund; <br />6. Foundation Survey; Current Survey. If the Plans and Specifications provide for construction of the <br />foundations, including expansion or modification of existing foundations, within thirty (30) days after <br />completion of construction of the foundations of the Improvements, a survey certified by a registered <br />engineer or surveyor showing that the foundations are located within the perimeter of the Land and any set <br />back lines and at the location shown on the Plans and Specifications, and from time to time. An updated <br />Survey if required by the Title Insurance Company or the Controlling Person; <br />7. Approval by Engineering Consultant. Approval of the Requisition for such disbursement by the <br />Engineering Consultant, accompanied by a certificate or report from the Engineering Consultant to the <br />effect that in its opinion, based on site observations and submissions by the Contractor, the construction of <br />the Improvements to the date thereof was performed in a good and workmanlike manner and in accordance <br />with the Plans and Specifications, stating the estimated total cost of construction of the Improvements, <br />stating the percentage of in-place construction of the Improvements, and stating that the remaining non- <br />disbursed portion of the Project Fund and Required Equity Funds allocated for such purpose in the <br />Development Budget is adequate to complete the construction of the Improvements; <br />8. Contracts. Evidence that one hundred percent (100%) of the cost of the remaining Work is covered <br />by firm fixed price or guaranteed maximum price contracts or subcontracts, or orders for the supplying of <br />materials, with contractors, subcontractors, materialmen or suppliers satisfactory to the Controlling Person, <br />and that the Payment and Performance Bonds have been obtained, as required. <br />9. Mechanics’ Liens. The Controlling Person may withhold or refuse to fund any advance hereunder <br />if any mechanic’s lien has been filed or recorded and not bonded over or otherwise collateralized to the
The URL can be used to link to this page
Your browser does not support the video tag.