Laserfiche WebLink
77060900v2 <br /> <br /> <br /> <br /> S12-1 <br /> <br />SCHEDULE 12 <br />INITIAL INSURANCE REQUIREMENTS <br />The Project Facilities must be continuously covered by acceptable property insurance policies meeting the <br />minimum requirements described below. This is a general outline of the insurance coverages required by <br />the Controlling Person, additional coverage may be required at the Controlling Person’s discretion.