My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-26-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
04-26-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 5:08:29 PM
Creation date
8/23/2023 8:26:09 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
77060900v2 <br /> <br /> <br /> 44 <br /> <br />Section 9.14 Construction Information and Verification. From time to time, within ten (10) <br />days after the written request of Controlling Person, Borrower shall deliver to Controlling Person any and <br />all of the following information and documents, to the extent applicable to the construction or renovation <br />of the Project Facilities, that Controlling Person may request, all in forms acceptable to Controlling Person, <br />as applicable: <br />(a) Current Plans and Specifications for the Improvements certified by the Architect <br />as being complete and accurate, and a line item cost breakdown for the proposed construction <br />and/or rehabilitation of the Improvements; <br />(b) A current, complete and correct list showing the name, address, telephone number <br />and license information of each contractor, subcontractor and material supplier engaged in <br />connection with the construction and/or rehabilitation of the Improvements, and the total dollar <br />amount of each contract and subcontract (including any changes) and the scope of work involved, <br />together with the amounts paid through the date of the list and all other information reasonably <br />requested by Controlling Person; <br />(c) True and correct copies of the most current versions of all executed contracts and <br />subcontracts with each party identified in the list described in clause (b) above, including any <br />changes; <br />(d) True and correct copies of all grading, foundation, building and all other <br />construction permits, licenses and authorizations from all applicable Governmental Authorities or <br />third parties necessary for the construction and/or rehabilitation of the Improvements and the <br />operation of, and access to, the Project; <br />(e) Copies of (i) owner/architect/contractor project meeting minutes; (ii) requests for <br />information (RFI), submittal logs, proposed change orders (PCO), and change order logs; (iii) <br />independent test results, (iv) quality inspection reports; and (v) anticipated cost reports, buy-out <br />logs and Major Contracts; <br />(f) A construction schedule showing the progress of construction or rehabilitation, as <br />the case may be, and the projected sequencing and completion times for uncompleted Work, all as <br />of the date of the schedule; and <br />(g) Any update to any item described above which Borrower may have previously <br />delivered to Controlling Person. <br />(h) Borrower expressly authorizes Controlling Person to contact Architect, Contractor <br />or any contractor, subcontractor, material supplier, surety or any Governmental Authority to verify <br />any information disclosed in accordance with this Section 9.14. Controlling Person shall give <br />notice to Borrower of any such contacts, provided that neither Controlling Person nor Funding <br />Lender shall incur any liability to Borrower by reason of the failure to give such notice, and <br />Borrower’s obligations under the Borrower Loan Documents shall not be affected in any manner <br />by any failure to give such notice. The Construction Contract shall require the Contractor to <br />disclose such information to Funding Lender and Controlling Person. Any defaulting architect, <br />contractor, subcontractor, material supplier or surety shall be promptly replaced, and Borrower <br />shall promptly deliver all required information and documents to Controlling Person and Funding <br />Lender regarding each replacement architect, contractor, subcontractor, material supplier and <br />surety. Controlling Person may disapprove any architect, contractor, subcontractor, material <br />supplier, surety or other party whom Controlling Person in its reasonable judgment may deem
The URL can be used to link to this page
Your browser does not support the video tag.