My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-24-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
05-24-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 5:08:30 PM
Creation date
8/24/2023 4:19:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Why this Study? <br />5/25/2023 7 <br />Previous plans <br />•City comprehensive plans: Roseville, Little Canada, Maplewood <br />•2018 E-Z Pass Study: add 1-2 managed lanes <br />•Ramsey County: Bike barriers; crossings at Lexington and Fairview Aves <br />•Washington Cnty Transit Feasibility Study: Stillwater to downtown Mpls <br />•Met Council Transitway Corridor Study 2014: Oakdale to downtown Mpls <br />•Metro Transit: Purple Line BRT (route being re-evaluated)
The URL can be used to link to this page
Your browser does not support the video tag.