Laserfiche WebLink
Contractor's Application for PaymentOwner's Project No.:Engineer's Project No.:Agency's Project No.:2 From06/07/23to 07/06/23AC D E F F1 F2 G H I J K LItem Quantity UnitsUnit Price($)Value of Bid Item(C X E)($)Quantity Previous EstimateValue Previous EstimateEstimated Quantity Incorporated in the WorkValue of Work Completed to Date(E X G)($)1 1.00 LUMP SUM 52,500.00 52,500.00 0.50 26,250.00 0.50 26,250.00 26,250.00 50% 26,250.00 2 50.00 LIN FT 75.00 3,750.00 - - - - 3,750.00 3 1.00 EACH 150.00 150.00 - - - - 150.00 4 1,360.00 SQ YD 3.00 4,080.00 - - - - 4,080.00 5 2.00 EACH 100.00 200.00 - - - - 200.00 6 1.00 LUMP SUM 6,500.00 6,500.00 0.50 3,250.00 0.50 3,250.00 3,250.00 50% 3,250.00 7 1.00 LUMP SUM 2,500.00 2,500.00 1.00 2,500.00 1.00 2,500.00 2,500.00 100% - 8 9.00 EACH 350.00 3,150.00 9.00 3,150.00 9.00 3,150.00 3,150.00 100% - 9 1.00 LUMP SUM 19,500.00 19,500.00 1.00 19,500.00 1.00 19,500.00 19,500.00 100% - 10 2,400.00 CU YD 20.00 48,000.00 285.00 5,700.00 960.00 19,200.00 19,200.00 40% 28,800.00 11 550.00 CU YD 22.00 12,100.00 - - - - 12,100.00 12 850.00 CU YD 20.00 17,000.00 - - - - 17,000.00 13 850.00 CU YD 22.00 18,700.00 - - - - 18,700.00 14 140.00 CU YD 35.00 4,900.00 - - - - 4,900.00 15 3,500.00 SQ YD 1.00 3,500.00 - - - - 3,500.00 16 7.00 EACH 3,000.00 21,000.00 - - - - 21,000.00 17 840.00 LIN FT 25.00 21,000.00 - 112.00 2,800.00 2,800.00 13% 18,200.00 18 6.00 EACH 850.00 5,100.00 - - - - 5,100.00 19 535.00 LIN FT 28.00 14,980.00 - - - - 14,980.00 20 3.00 EACH 1,950.00 5,850.00 - - - - 5,850.00 21 275.00 TON 150.00 41,250.00 - - - - 41,250.00 22 200.00 SQ FT 16.50 3,300.00 - - - - 3,300.00 23 45.00 SQ FT 85.00 3,825.00 - - - - 3,825.00 24 5,530.00 SQ FT 9.00 49,770.00 - - - - 49,770.00 25 420.00 LIN FT 27.00 11,340.00 - - - - 11,340.00 26 1,380.00 SQ FT 30.00 41,400.00 - - - - 41,400.00 27 300.00 SQ FT 45.50 13,650.00 - - - - 13,650.00 28 120.00 SQ FT 65.50 7,860.00 - - - - 7,860.00 29 50.00 SQ FT 75.25 3,762.50 - - - - 3,762.50 30 6.00 EACH 450.00 2,700.00 - - - - 2,700.00 31 1.00 LUMP SUM 21,500.00 21,500.00 - - - - 21,500.00 32 6.00 EACH 5,450.00 32,700.00 - - - - 32,700.00 33 150.00 LIN FT 150.00 22,500.00 - - - - 22,500.00 34 7.00 EACH 6,200.00 43,400.00 - - - - 43,400.00 35 1.00 LUMP SUM 6,500.00 6,500.00 - - - - 6,500.00 36 2.00 EACH 5,450.00 10,900.00 - - - - 10,900.00 37 1.00 LUMP SUM 3,500.00 3,500.00 - - - - 3,500.00 38 17.00 EACH 600.00 10,200.00 - - - - 10,200.00 39 11.00 EACH 1,000.00 11,000.00 - - - - 11,000.00 40 13.00 EACH 1,500.00 19,500.00 - - - - 19,500.00 41 3.00 EACH 3,000.00 9,000.00 - - - - 9,000.00 42 6.00 EACH 350.00 2,100.00 - - - - 2,100.00 43 11.00 EACH 250.00 2,750.00 - - - - 2,750.00 44 1.00 LUMP SUM 95,000.00 95,000.00 - - - - 95,000.00 45 1.00 LUMP SUM 13,600.00 13,600.00 - - - - 13,600.00 46 1.00 LUMP SUM 2,500.00 2,500.00 - - - - 2,500.00 47 710.00 LIN FT 7.50 5,325.00 - - - - 5,325.00 48 310.00 LIN FT 8.50 2,635.00 - - - - 2,635.00 49 575.00 LIN FT 18.00 10,350.00 - - - - 10,350.00 Contract InformationBid Item No.REMOVE PEDESTRIAN RAMPREMOVE BITUMINOUS TRAIL (SAW CUT INCIDENTAL)COMMON EXCAVATION (EV, P)SELECT GRANULAR BORROW (CV, P)COMMON EXCAVATION - SUBGRADE CORRECTION (EV)SELECT GRANULAR BORROW - SUBGRADE CORRECTION (CV)AGGREGATE BASE (CV) CLASS 5 - PLAYGROUND CONTAINERSREMOVE SIGN REMOVE PLAYGROUNDREMOVE IRRIGATIONApplication Date:Application Period:Application No.:MOBILIZATIONREMOVE & REPLACE CONCRETE CURB AND GUTTERCONCRETE WALK, THICKENED EDGE AT PLAYGROUNDPrevious Estimate07/06/23BBASE BID% of Value of Item (J / F)(%)Balance to Finish (F - J)($)DescriptionWork CompletedMaterials Currently Stored (not in G)($)Work Completed and Materials Stored to Date (H + I)($)Progress Estimate - Unit Price WorkCity of Little CanadaBolton & Menk, Inc.Albrecht CompanyPioneer Park ImprovementsOwner:0T6.124526Engineer:Contractor:Project:Contract:6" REINFORCED CONCRETE WALK, INTEGRAL COLORSPECIAL SURFACE TREATMENT 1 - SANDBLAST AND STAIN SPECIAL SURFACE TREATMENT 2 - STAMP AND STAIN SPECIAL SURFACE TREATMENT 3 - STAMP AND STAIN CLEAR AND GRUB TREEEROSION CONTROL8" PVC PIPE DRAIN CLEAN OUT WITH CASTINGTYPE SP 9.5 WEARING COURSE MIXTURE (2,B)6" CONCRETE PEDESTRIAN CURB RAMPTRUNCATED DOMES4" CONC. WALKFINISH GRADINGPRECAST CONCRETE FOOTINGS6" PERF PVC PIPE DRAIN 6" PVC PIPE DRAIN CLEAN OUT WITH CASTING8" PVC PIPE DRAIN INSTALL ENTRY KIOSK (INCLUDES DISPLAY BACKING PANEL)STONE MASONRY COLUMNS - ENTRY KIOSKINSTALL DRINKING FOUNTAINSURFACE MOUNT SITE FURNISHINGS (FURNISHED BY STONE SEAT BLOCK8'x3' CONCRETE BENCH PAD - 6" THICKINSTALL PICNIC SHELTERSTONE MASONRY COLUMNS - PICNIC SHELTERDECORATIVE FENCESTONE MASONRY COLUMNS - DECORATIVE FENCEELECTRICAL - SERVICE CABINETELECTRICAL - CONNECT TO EXISTING CABINETELECTRICAL - 3/4" PVC CONDUITELECTRICAL - 1" PVC CONDUITELECTRICAL - 1" CONDUIT HDDOUTCROPPING BOULDER - LANDSCAPEOUTCROPPING BOULDER - SPILLWAYLANDSCAPE BOULDERSTEPPING STONESINTERACTIVE WATER FEATURE SYSTEM COMPLETEUnit PriceEJCDC C-620 Contractor's Application for Payment(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.1 of 2DocuSign Envelope ID: 1FD3B9F9-6ECB-46AB-9855-F139B27803DF