<br />3 From 07/01/23 to 07/31/23
<br />A C D E F F1 F2 G H I J K L
<br />Item Quantity Units
<br />Unit Price
<br />($)
<br />Value of Bid Item
<br />(C X E)
<br />($)
<br />Quantity Previous
<br />Estimate
<br />Value Previous
<br />Estimate
<br />Estimated
<br />Quantity
<br />Incorporated in
<br />the Work
<br />Value of Work
<br />Completed to Date
<br />(E X G)
<br />($)
<br />Contract Information
<br />Bid Item
<br />No.
<br />Application Date:Application Period:Application No.:
<br />Engineer:
<br />Contractor:
<br />Project:
<br />Contract:
<br />Previous Estimate
<br />07/31/23
<br />B
<br />% of
<br />Value of
<br />Item
<br /> (J / F)
<br />(%)
<br />Balance to Finish
<br />(F - J)
<br />($)Description
<br />Work Completed
<br />Materials Currently
<br />Stored (not in G)
<br />($)
<br />Work
<br />Completed
<br />and Materials
<br />Stored to Date
<br />(H + I)
<br />($)
<br />Progress Estimate - Unit Price Work
<br />City of Little Canada
<br />Bolton & Menk, Inc.
<br />OMG Midwest, Inc. dba. Minnesota Paving & Materials
<br />2023 Street Improvements
<br />Owner:
<br />0N1.127995
<br />23-01, 23-02, 23-03, 23-05
<br />46 2.00 EACH 972.79 1,945.58 1.00 972.79 8.00 7,782.32 7,782.32 400% (5,836.74)
<br />47 1.00 EACH 581.67 581.67 - - - - - 581.67
<br />48 1.00 EACH 1,955.60 1,955.60 - - 1.00 1,955.60 1,955.60 100% -
<br />49 3.00 EACH 1,604.59 4,813.77 - - - - - 4,813.77
<br />50 1.00 EACH 170.49 170.49 - - 10.00 1,704.90 1,704.90 1000% (1,534.41)
<br />51 2.00 EACH 280.80 561.60 - - - - - 561.60
<br />52 2.00 EACH 451.29 902.58 1.00 451.29 1.00 451.29 451.29 50% 451.29
<br />53 1.00 EACH 53,000.00 53,000.00 0.43 22,910.00 0.43 22,910.00 22,910.00 43% 30,090.00
<br /> 65,736.45 26,740.96 37,210.99 37,210.99 57% 28,525.46
<br />54 2.00 EACH 280.80 561.60 - - 2.00 561.60 561.60 100% -
<br />55 7.00 EACH 3,941.29 27,589.03 8.60 33,895.09 8.60 33,895.09 33,895.09 123% (6,306.06)
<br />56 8.00 EACH 3,289.42 26,315.36 8.92 29,341.63 8.92 29,341.63 29,341.63 112% (3,026.27)
<br />57 14.00 EACH 3,259.33 45,630.62 14.00 45,630.62 14.00 45,630.62 45,630.62 100% -
<br />58 12.00 EACH 270.37 3,244.44 14.00 3,785.18 14.00 3,785.18 3,785.18 117% (540.74)
<br /> 103,341.05 112,652.52 113,214.12 113,214.12 110% (9,873.07)
<br />59 9.00 EACH 300.86 2,707.74 2.00 601.72 2.00 601.72 601.72 22% 2,106.02
<br />60 75.00 LF 36.05 2,703.75 75.00 2,703.75 75.00 2,703.75 2,703.75 100% -
<br />61 2.00 EACH 451.29 902.58 2.41 1,087.61 2.41 1,087.61 1,087.61 121% (185.03)
<br />62 48.00 LF 441.26 21,180.48 48.00 21,180.48 48.00 21,180.48 21,180.48 100% -
<br />63 30.00 LF 122.35 3,670.50 24.00 2,936.40 24.00 2,936.40 2,936.40 80% 734.10
<br />64 4.00 LF 787.25 3,149.00 - - - - - 3,149.00
<br />65 5.00 EACH 982.81 4,914.05 1.00 982.81 3.00 2,948.43 2,948.43 60% 1,965.62
<br />66 4.00 EACH 351.01 1,404.04 6.00 2,106.06 6.00 2,106.06 2,106.06 150% (702.02)
<br />67 4.00 EACH 832.38 3,329.52 5.00 4,161.90 5.00 4,161.90 4,161.90 125% (832.38)
<br />68 1.00 EACH 270.78 270.78 - - - - - 270.78
<br />69 1.00 EACH 511.46 511.46 1.00 511.46 1.00 511.46 511.46 100% -
<br />70 1.00 EACH 2,457.04 2,457.04 1.00 2,457.04 1.00 2,457.04 2,457.04 100% -
<br />71 3.00 EACH 1,900.00 5,700.00 3.00 5,700.00 3.00 5,700.00 5,700.00 100% -
<br />72 15.00 CY 175.50 2,632.50 13.81 2,423.66 13.81 2,423.66 2,423.66 92% 208.84
<br /> 55,533.44 46,852.88 48,818.51 48,818.51 88% 6,714.93
<br /> -
<br />833,102.17$ 464,272.49$ 783,645.24$ -$ 783,645.24$ 94% 49,456.93$ TOTAL BASE BID
<br />TOTAL PART 2: SANITARY SEWER
<br />PART 3: WATERMAIN
<br />TOTAL PART 3: WATERMAIN
<br />PART 4: STORM SEWER
<br />TOTAL PART 4: STORM SEWER
<br />NEW RINGS AND CASTING (SANITARY)
<br />ADJUST FRAME AND RING CASTING
<br />RECONSTRUCT SANITARY STRUCTURE
<br />CONNECT TO EXISTING SANITARY SEWER
<br />REMOVE AND REPLACE HYDRANT & VALVE BOLTS
<br />REMOVE AND REPLACE GATE VALVE BOLTS
<br />REMOVE AND REPLACE FITTING BOLTS
<br />REMOVE & REPLACE GATE VALVE BOX
<br />REMOVE CASTING & RINGS (STORM)
<br />CHIMNEY SEAL (INFI-SHIELD)
<br />PATCH DOGHOUSE (SANITARY)
<br />PATCH INVERT (SANITARY)
<br />5' DIA SANITARY MANHOLE W/ OUTSIDE DROP - SAN-7
<br />ADJUST GATE VALVE BOX
<br />CONNECT TO EXISITNG DRAINAGE STRUCTURE
<br />CLEAN FLARED END OUTLET
<br />RANDOM RIP RAP CLASS lll
<br />NEW RINGS AND CASTING (STORM)
<br />PATCH DOGHOUSE (STORM)
<br />PATCH INVERT (STORM)
<br />REPAIR STEP (STORM)
<br />ADJUST CASTING (STORM)
<br />SWALE REGRADING
<br />58" SPAN RC PIPE-ARCH APRON WITH TRASH GUARD
<br />58"X36" ARCH RCP
<br />24" RC PIPE SEWER CLASS III
<br />2'X3' CB RING SEAL (FLEX-SEAL)
<br />Unit Price
<br />EJCDC C-620 Contractor's Application for Payment
<br />(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved.2 of 2
<br />DocuSign Envelope ID: C994DA10-F5B2-401B-A955-E395C1A77BBC
|