Vendor: Flagship Recreation – Option 2 – Outer Space <br />Equipment:$398,974.00 <br />PIP Surfacing:$163,767.41 <br />Community Build:Yes. Estimated at a 3-day build with 15 people per day and concrete footings. <br />ADA Information: <br />2-5-year-old area <br />Total Elevated Play Components 13 <br />Total Elevated Components Accessible by Ramp 0 Required 0 <br />Total Elevated Components Accessible by Transfer 13 Required 7 <br />Total Accessible Ground Level Components Shown 7 Required 4 <br />Total Different Types of Ground Level Components 5 Required 5 <br />5-12-year-old area <br />Total Elevated Play Components 21 <br />Total Elevated Components Accessible by Ramp 10 Required 6 <br />Total Elevated Components Accessible by Transfer 7 Required 6 <br />Total Accessible Ground Level Components Shown 7 Required 7 <br />Total Different Types of Ground Level Components 6 Required 6