Laserfiche WebLink
Vendor: Minnesota/Wisconsin Playground – Option 1 <br />Equipment:$400,000.00 <br />PIP Surfacing:$253,000.00 <br />Community Build:No <br />ADA Information: <br />2-5-year-old area <br />Total Elevated Play Components 10 <br />Total Elevated Components Accessible by Ramp 0 Required 0 <br />Total Elevated Components Accessible by Transfer 10 Required 5 <br />Total Accessible Ground Level Components Shown 7 Required 3 <br />Total Different Types of Ground Level Components 4 Required 3 <br />5-12-year-old area <br />Total Elevated Play Components 18 <br />Total Elevated Components Accessible by Ramp 0 Required 0 <br />Total Elevated Components Accessible by Transfer 16 Required 9 <br />Total Accessible Ground Level Components Shown 14 Required 6 <br />Total Different Types of Ground Level Components 7 Required 3