My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-13-2023 Parks_Rec Packet
>
Agenda Packets
>
2020-2029
>
2023
>
07-13-2023 Parks_Rec Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2023 2:20:21 PM
Creation date
8/25/2023 2:16:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT <br />TO:Parks & Recreation Commission <br />FROM:Bryce Shearen, CPRE, Parks & Recreation/Community Services Director <br />DATE:July 13, 2023 <br />RE:Pioneer Park Updates <br />ACTION REQUESTED <br />None. Information update to the Parks and Recreation Commission. <br />BACKGROUND <br />Progress for Pioneer Park continues to move forward. Below are weekly updates since the last <br />Parks & Recreation Commission meeting and some photos. Staff continues to have weekly <br />meetings with the contractor and Engineer on site and we are anticipating a lot of construction <br />work to happen in the month of June. <br />With a lot of work scheduled for the month of June staff would recommend a park tour at <br />Pioneer Park before the July Commission meeting at 5:30 p.m. Staff would like feedback from <br />the Commission if a park tour would be a good idea. <br />Weekly Updates: <br />Work completed for the week of May 29 – June 2. <br />o Continued to grade the site and stockpile material. <br />Work completed for the week of June 5 – June 9. <br />o Continue to grade the site. <br />o Preparing for utility and conduit installation. <br />o Hauling material off site. <br />Work completed for the week of June 12 – June 16. <br />o Hauled out exess material. <br />Work completed for the week of June 19 – June 23. <br />o Water line ran to utility box and drinking fountain. <br />o Graded for hold down. <br />Work completed the week of June 26 – June 30. <br />o Started laying drain tile. <br />o Staked electrical components and jets. <br />o Tested water lines. <br />Work completed the week of July 3 – July 7 <br />o No work July 3 and July 4 for Holiday. <br />o Continued laying drain tile.
The URL can be used to link to this page
Your browser does not support the video tag.