Loading...
HomeMy WebLinkAbout10-13-2022 Planning Commission PacketCall To Order - 5:30 P.m. Roll Call Adopt Agenda Approval Of Minutes Meeting Minutes 8 -11 -22 08 -11 -2022 PC MINUTES.PDF Meeting Open To The Public Note: This is a courtesy extended to persons wishing to address the Commission concerning issues that are not on the agenda. This discussion will be limited to 15 minutes. Public Hearings Commission Business Action Items & Recommendations Cover Memo -Final Plat, Rezoning, Variance -Lennar Case #1415 PC COVER MEMO FINAL PLAT REZONING VARIANCE LENNAR.PDF Final Plat/Variance/Rezoning –U.S. Home, LLC And Lennar –Case #1415 PC STAFF MEMO FINAL PLAT REZONING VARIANCE LENNAR 10.13.PDF CITY ENGINEER COMMENTS REVIEW MEMO 10.6.PDF RWMWD 22 -28 PERMIT WITHHELD LETTER 10 -5 -22.PDF 019789 -000 PIONEER COMMONS -FIRST ADDITION.PDF FINAL PLAT PIONEER COMMONS.PDF Reports From Staff Reports From Commissioners Adjournment This agenda is subject to change by additions and deletions. Chairperson Chris Kwapick Planning Commissioners Bill Buesing Taelor Johnson Dawn Kulousek Valerie Quarles Eric Thorson Regular Meeting of the Little Canada Planning Commission Thursday, October 13, 2022 5:30 p.m. City Center Council Chambers A G E N D A 515 Little Canada Road Little Canada, MN 55117 www.littlecanadamn.org Staff Liaison Corrin Wendell 1. 2. 3. 4. A. Documents: 5. 6. 7. A. Documents: a. Documents: 8. 9. 10. Call To Order - 5:30 P.m.Roll CallAdopt AgendaApproval Of MinutesMeeting Minutes 8 -11 -2208-11 -2022 PC MINUTES.PDFMeeting Open To The PublicNote: This is a courtesy extended to persons wishing to address the Commission concerning issues that are not on the agenda. This discussion will be limited to 15 minutes.Public HearingsCommission Business Action Items & RecommendationsCover Memo -Final Plat, Rezoning, Variance -Lennar Case #1415PC COVER MEMO FINAL PLAT REZONING VARIANCE LENNAR.PDFFinal Plat/Variance/Rezoning –U.S. Home, LLC And Lennar –Case #1415PC STAFF MEMO FINAL PLAT REZONING VARIANCE LENNAR 10.13.PDFCITY ENGINEER COMMENTS REVIEW MEMO 10.6.PDFRWMWD 22 -28 PERMIT WITHHELD LETTER 10 -5 -22.PDF 019789 -000 PIONEER COMMONS -FIRST ADDITION.PDF FINAL PLAT PIONEER COMMONS.PDF Reports From Staff Reports From Commissioners Adjournment This agenda is subject to change by additions and deletions. ChairpersonChris KwapickPlanningCommissionersBill BuesingTaelor JohnsonDawn KulousekValerie QuarlesEric Thorson Regular Meeting of the Little Canada Planning CommissionThursday, October 13, 2022 5:30 p.m.City Center Council ChambersA G E N D A 515 Little Canada RoadLittle Canada, MN 55117www.littlecanadamn.org Staff LiaisonCorrin Wendell1.2.3.4.A.Documents:5.6.7.A.Documents:a.Documents: 8. 9. 10. STAFF REPORT TO: Chair Kwapick and Planning Commission Members FROM:Corrin Wendell, Community Development Director DATE: Thursday, October 13, 2022 RE: Final Plat/Variance/Rezoning– U.S. Home, LLC and Lennar – Case #1415 COVER MEMO BACKGROUND To consider recommending approval to the City Council for the Final Plat 1st Addition for U.S. Home, LLC, and Lennar, Rezoning from R-1 Low Density Residential to R-2 Medium Density Residential, and a Variance for the front and rear yard setbacks of the townhomes. On March 24, 2022, Lennar held a Neighborhood Meeting at the Little Canada Elementary to discuss the development and answer questions from the public. At the May 5, 2022 Planning Commission meeting, the Planning Commission reviewed the Preliminary Plat, Rezoning, and Variance request and recommended approval to the City Council. At the May 11, 2022 City Council Meeting and public hearing, the City Council reviewed the Preliminary Plat, Rezoning, and Variance request. This item was tabled to allow for Site Plan changes. At the May 25, 2022 City Council meeting, the City Council voted to approve the Preliminary Plat and move forward with the Final Plat, Rezoning, and Variance phases. Based on Council discussion and public comment, Lennar provided an updated Site Plan that showed additional circulation to address concerns about traffic, city road connections, and internal connections within the private streets of the development. The City process and requirements for Preliminary and Final Plats are outlined in the Subdivision Ordinance, Section 1005. The Planning Commission reviews each of these requests and makes a recommendation to the City Council. The City Council then reviews and makes a final determination for the requests. Sometimes Preliminary and Final Plats are reviewed together and sometimes they are reviewed separately, typically for larger parcels with more complex detail. This development proposal will have a Preliminary Plat stage and a Final Plat stage for approval of the 1st, 2nd, and 3rd Additions. Each Final Plat Addition will have a recommendation from the Planning Commission and a final determination from the City Council to obtain all necessary approvals. The proposed development will follow the Final Plat process below: o October 13, 2022 – Planning Commission Final Plat 1st Addition, Variance and Rezoning o October 26, 2022 – City Council Final Plat 1st Addition, Variance, Rezoning, and Development Agreement o 2023 – Planning Commission and City Council – Final Plat 2nd Addition o 2023/2024 – Planning Commission and City Council – Final Plat 3rd Addition STAFF REPORT TO: Chair Kwapick and Planning Commission Members FROM:Corrin Wendell, Community Development Director DATE: Thursday, October 13, 2022 RE: Final Plat/Variance/Rezoning– U.S. Home, LLC and Lennar – Case #1415 ACTION TO BE CONSIDERED To consider recommending approval to the City Council for the Final Plat for U.S. Home, LLC, and Lennar, Rezoning from R-1 Low Density Residential to R-2 Medium Density Residential, Variance for front and rear yard setbacks. BACKGROUND The City has received a Final Plat, Rezoning, and Variance applications from U.S. Home, LLC, Lennar, to construct a townhome community with (178) townhomes. Lennar plans to develop a mix of row townhomes and back-to-back townhomes to achieve an overall R-2 medium density zoning in accordance with future land use designations in the Comprehensive Plan. The site is 19.77 gross acres (861,180 sf) which includes 4.6 acres (200,376 sf) allocated to an overhead powerline easement (approximately 9 units/acre). Lennar has purchased the parcels which are in Planning District 10 as reflected in the 2040 Comprehensive Plan. The Planning Commission reviewed the Preliminary Plat at the May 5th meeting. Then, the City Council held a public hearing on May 11th and granted approval of the Preliminary Plat on May 25, 2022. Based on Council discussion and public comment, Lennar had provided an updated Site Plan to show additional circulation to address concerns about traffic, city road connections, and internal connections within the private streets of the development. APPLICANT/OWNER: U.S. Home, LLC 16305 36th Ave N. Plymouth, MN 55446 The Pioneer Commons site plan consists of five (5) parcels located South of County Road D and West of Edgerton Street: PID# 05-29-22-21-0024 (0.58 acres / 25,265 sf) 3007 Vanderbie Street, Little Canada, Minnesota 55117 Lot 12, Block 2 of Gervais Heights, Ramsey County, Minnesota Currently designated R-3 – Higher Density Residential Existing use – R-1/Agricultural And PID# 05-29-22-21-0032 (16.62 acres / 723,967 sf) 3036 Vanderbie Street, Little Canada, Minnesota 55117 Lots, 1,2,3,4,5,6,7,8 and 9, Block 1, Gervais Heights Lots, 1,2,3,4,5,6,7,8,9,10,11,20,21,22,23,24,25 and 26, Block 2, Gervais Heights AND All that part of the West 179 feet of the East 730 feet of the North 254.10 feet of the East ½ of the West ½ of Section 5, Township 29, Range 22, which lies between the East line of Vanderbie Street produced North to North line of said Section 5, and the West line of said Lot 1, Block 1, GERVAIS HEIGHTS, Ramsey County, Minn., produced North to North line of said Section 5, (& other property). Subject to Highway. Currently designated R-3/R-2 – Higher Density Residential / Medium Density Residential Existing use – Agricultural And PID# 05-29-22-21-0031 (1.29 acres / 56,192 sf) Desoto Street, Little Canada, Minnesota 55117 Lots 18 and 19, Block 2 of Gervais Heights, Ramsey County, Minnesota Currently designated R-3 – Higher Density Residential Exiting use – Agricultural And PID# 05-29-22-21-0030 (0.64 acres / 27,878 sf) 3034 Desoto Street, Little Canada, Minnesota 55117 Lot 17, Block 2 of Gervais Heights, Ramsey County, Minnesota Currently designated R-3 – Higher Density Residential Exiting use – R-1 And PID# 05-29-22-21-0029 (0.64 acres / 27,878 sf) Desoto Street, Little Canada, Minnesota 55117 Lot 16, Block 2 of Gervais Heights, Ramsey County, Minnesota Currently designated R-3 – Higher Density Residential Exiting use – R-1 The site is 19.77 gross acres (861,180 sf) which includes 4.6 acres (200,376 sf) allocated to an overhead powerline easement. The enclosed site plan includes a table detailing the layout of the proposed townhomes, the extension of public right-of-way and layout of private streets. Development Overview Infrastructure: The neighborhood will be served by public and private streets and public utilities. An extension of Vanderbie will tie in at the northern boundary line through the site and connect to Allen Avenue in the south. Additional private roads and visitor parking will accommodate internal circulation throughout the community. Ponding: The site is currently flat with poor drainage. The site will be graded to drain toward the overhead powerline easement area where ponds will be established and connected to the municipal drainage system. Soil borings indicate organic and clay-like soils so infiltration may not be possible. Ponds will be designed to collect water from the entire development and then slowly release into the municipal system, thereby protecting adjacent and downstream properties. Landscaping: Reforestation will be implemented throughout the site where possible, in accordance with City code. Lennar also proposes to plant wooded buffers to screen adjacent existing residents from vehicle headlights. Developer/Builder: Lennar will act as both developer of the property and builder of the homes. The community will be professionally maintained via an established HOA. Development Features Architecture: Lennar’s design team will carefully plan the color packages of each building to avoid monotony and to ensure a visually appealing streetscape. Existing Gas Line: The site’s northern boundary is encumbered by an existing gas line blanket easement. Discussions of the pipeline resulted in a size reduction of the easement area. The easement will be reduced to a 25’ setback from the center of the pipe. In addition, City code has an additional setback related to pipeline easements. Given there are existing homes within the setback created by City code, the City will match the newly reduced pipeline easement area. Variance: To accommodate the City Council’s request for increased density on the northern portion of the site and create more green space along the southern boundary, Lennar is requesting a variance for the front and rear yard setbacks of the townhomes throughout the site. Due to the placement of the townhomes, not all townhomes will need to utilize the flexibility in the variance and will comply with base zoning standards for the R-2 District. Proposed Homes and Architecture The Liberty Series is a two-story row style townhome with 2-car garage. Liberty Series Units: 72 lots Building Width: 25 feet Bedrooms: 3 bedrooms Bathrooms: 2.5/3 bathrooms Garage: 2-car Square Footage: 1,719 – 1,831 Base Price Range: **$364,990+ The Colonial Manor Series is a two-story back-to-back style townhome with 2-car garage. Colonial Manor Series Units: 106 lots Building Width: 32 feet Bedrooms: 3 bedrooms Bathrooms: 3 bathrooms Garage: 2-car Square Footage: 1,769 – 1,800 Base Price Range: **$333,990+ **Pricing is estimated and subject to change based on current market conditions at time of sales. Public Park and Trails Trail Connection: In response to the Connected Ramsey County Bicycle Network document, the future community has planned for a trail connection along the western boundary to connect trail extensions throughout the overhead powerline easement area to Allen Avenue – providing access to Pioneer Park. Sidewalks: Sidewalks will be installed along the west side of Vanderbie to promote walkability throughout the community. Schedule Land development work (grading, utilities, and streets) is intended to begin as soon as all development permits are obtained with construction on model homes beginning fall 2022 and homes could be ready for the Spring 2023 Parade of Homes. The overall project will likely be developed in multiple phases. Lennar estimates full occupancy of the community will occur approximately 2 to 3 years from the date sales begin. The Final Plat will be seen in the 1st, 2nd, and 3rd additions by the Planning Commission and City Council. Zoning: The property is currently zoned R-1, Low Density Residential and is requested to rezone it to R- 2, Medium Density Residential to align with the Future Land Use Map of the Comprehensive Plan. Attachments: Please see the enclosed Supplemental Information. AERIAL MAP (Source: Ramsey County GIS) CURRENT ZONING MAP (R-1) COMPREHENSIVE PLAN FUTURE LAND USE MAP (Light Brown, Medium Density Residential, Dark Brown, Higher Density Residential) FINDINGS What is a Major Subdivision? A major subdivision is a division of a single parcel, lot, or tract into four or more separate parcels, lots, or tracts. Subdivision by definition is the division of land by platting, conveyance, registered land survey or other means into four or more lots, plats, sites or other divisions. Chapter 1005.030. FINAL PLAT. The owner or subdivider shall submit a final plat together with any necessary supplementary information. The final plat, prepared for recording purposes, shall be prepared in accordance with provisions of Minnesota State Statutes and Ramsey County regulations, and such final plat shall contain the following information: Major Subdivision Filing Requirements: 1)Legal Description of land you want to divide. The applicant has provided a legal description to the City as shown on the application. 2)Proposed split line(s). Clearly identify each new parcel. The applicant has provided the proposed split lines clearly identifying each new parcel as shown on the certificate of survey. 3)Dimensions of all property lines and proposed use and area of each new lot. The applicant has provided the dimensions of all property lines as shown on the supplemental information. The applicant is seeking variances for the Front and Rear Yard Setbacks. Due to the placement of the townhomes, not all townhomes will require this exception, this is intended as a not to exceed setback limit. 4)Existing and proposed drainage and contour plan. The easements must be reflected on the survey. The applicant has provided a drainage and utility easements as shown on the final plat.. The applicant complies with this standard. 5)Location and widths of proposed utility easements. The applicant has provided utility easements as shown on the final plat. The applicant complies with this standard. 6)Existing street rights-of-way, railroad and utility rights-of-way, parks and other public open space, permanent building and easements within the existing lot and adjoining lots. The applicant has provided existing street rights-of-way as shown on the final plat. 7)Areas, other than street and utility easements, that you intend to dedicate for public use, including their areas. The applicant describes the linear trail and open areas under the existing power lines. Section 915, General Development Requirements: Off-Street Parking and Loading:Townhouse, (2) spaces per dwelling unit for residents’ use counting the private driveway plus a minimum of 1 shared space per 3 dwelling units for visitors’ use. The proposal complies with this requirement and provides 356 townhome spaces and 61 guest spaces. Section 915.140, Landscaping and Screening: This section outlines the various criteria for landscaping requirements including site landscaping, plant sizes and varieties, screening, and tree and woodland protection. The proposal complies with this requirement and includes an Overall Landscape Plan (Sheet LS-101) in the submittals. On the east side of the development along the property line with adjacent property owners, small berming and swaling will be utilized to screen potential headlights. Evergreen trees may be added to this area and added to the existing plan if deemed necessary to help screen development from adjacent properties. Development Review Committee: The Development Review Committee is made up of city staff including the City Administrator, Community Development Director, Public Works Director, City Engineer, Code Enforcement, Fire Chief, and Building Official. The proposal has been reviewed by the committee and comments have been provided to the applicant. Site Plan reviews include the following: Land use, setbacks, number of housing units, land coverage, parking, environmental impacts, traffic circulation, Landscape improvements, vehicle and pedestrian movements, drainage and utilities, security, fire protection, life and safety issues, grading, site preparation, right-of-way, easements, tree preservation, outdoor trash, Screening, signage, stormwater, wetlands, exterior lighting, and storm sewer alignment. Traffic Study: Ramsey County required a traffic analysis which is a study that anticipates the traffic counts, not an actual study which cannot be done until after the project is done to count the actual vehicles. The study shows that surrounding road networks are adequate to handle the additional traffic. The models show there would be about 70 trips each in the morning and evening. There will be design elements in the Vanderbie Street (bump-in and bump-outs) on the south end that can be used for traffic calming. Ramsey Washington Metro Watershed District Comments: (Please see the Watershed’s Comments Memo) At their October 5th meeting, the RWMWD reviewed Pioneer Commons, and recommended approval of the Watershed District permit provided that the three provisions requested are met. City Engineer Review: (Please see the City Engineer’s Comments Memo) Ramsey County Comments: As noted in the City Engineer comments, a permit will be required from Ramsey County for Vanderbie street and utility construction adjacent to and connecting to County Road D. Other Review Agencies: As noted in the City Engineer comments, other agencies such as the Metropolitan Council, Excel, BP, etc. will have permits that may be required. Comprehensive Plan: The proposal is consistent with the Comprehensive Plan. The Plan states that the R-2 Medium Density Residential District is reserved for a density range of 4 to 10 units/acres, the density of this project is 9 units/acres with a gross area of 19.7 acres and (178) units. Comprehensive Plan Goals: Comprehensive Plan goals that support the development are listed below: Chapter 1: Introduction •City’s vision detailed as an ‘Age-Friendly Community’ – where the land use plan allows for the expansion of housing options. Chapter 2: Land Use •Population forecasts project the addition of up to 300 more residents over the next 10-15 years as the city is fully built out with the addition of nearly 250 more households. •The Future Land Use Plan identifies up to 59 acres or 2% of the City’s land to be utilized for future medium density residential. The parcels are also located in District 10, which forecasted medium to high density residential development. Chapter 3: Housing •The Housing Strategy is to achieve new housing through redevelopment of certain sites from lower-density to achieve infill on open parcels. Infill and redevelopment are guided toward middle and higher density housing types. •Projected growth for developed communities is anticipated to occur through reinvestment at higher development densities. The City’s land use policies and strategies reflect this regional strategy. The private market is expected to respond to the need for additional housing by making good use of available properties. Zoning Map Amendment, Rezoning: Current Zoning District: R-1, Low Density Residential District Proposed Zoning District: R-2, Medium Density Residential District What is a Zoning Map Amendment? A Zoning Map Amendment is a change in the designation of the zoning district in the official zoning map. Chapter 917.050 (E) Approval Criteria: Recommendations and decisions on zoning amendments shall be based on consideration of the following criteria: 1.Whether the proposed amendment corrects an error in the original text or map; or This does not apply. 2.Whether the proposed amendment addresses needs arising from a changing condition, trend, or fact affecting the subject property and surrounding area; or Yes, this property is proposed to be developed into a townhome community (178 townhomes) to support the housing needs of the city. 3. Whether the proposed amendment is consistent with achieving the goals and objectives outlined in the Comprehensive Plan. Yes, this proposed rezoning request is consistent with the City’s 2040 Comprehensive Plan that achieves the goals and objectives outlined in the Comprehensive Plan. The property is currently guided Low Density Residential and would be requested to be rezoned to Medium Density Residential. The proposal is consistent with the Comprehensive Plan. The Plan states that the R- 2 Medium Density Residential District is reserved for a density range of 4 to 10 units/acres, the density of this project is 9 units/acres with a gross area of 19.7 acres and (178) units. Variance: Zoning Code Section 917.080, Variances: The variance process is intended to provide limited relief from the strict requirements of this ordinance in those cases where the reasonable conditions of a particular requirement will create practical difficulties because of circumstances unique to the property. It is not intended that variances be granted to allow a use not permitted by the underlying zoning district, nor to merely remove inconveniences or financial burdens that the requirements of this ordinance may impose on property owners in general. Variances are intended to address extraordinary, exceptional or unique situations that were not caused by the applicant’s act or omission. Variances may be allowed from restrictions placed on nonconformities. Criteria for Approving a Variance: 1. A variance may be approved only if these criteria are met: a. The request is in harmony with the purposes and intent of this ordinance. b. The variance is consistent with the Comprehensive Plan. c. The applicant can demonstrate that there are “practical difficulties” in complying with the regulation(s) in question. Determination of whether practical difficulties exist shall be based on the following: 1. The property owner proposes to use the property in a reasonable manner permitted by this ordinance; 2. The plight of the land owner is due to circumstances unique to the property not created by the landowner; 3. The variance will maintain the essential character of the locality. 2. Practical difficulties include, but are not limited to, inadequate access to direct sun light for solar energy systems. 3. Economic considerations alone shall not constitute a sufficient basis for a Variance if reasonable use for the property exists under the regulation. 4. Variances shall be granted for earth-sheltered construction as defined in Minnesota Statutes 216C, Subd. 14, when in harmony with this ordinance. 5. The City Council may impose conditions in the granting of a variance. Such conditions must be directly related to and bear a rough proportionality to the impact created by the variance. The applicant is seeking variances for the Front and Rear Yard Setbacks of the townhome units. Due to the placement of the townhomes, not all townhomes will require this exception as shown on the Final Plat, this is intended as a not to exceed setback limit. The City Council requested that the site plan show a gradual placement of units to achieve a lower density towards the southern end of the development and increase density as the development moves to the north end of the development. In order to achieve this goal, the applicant requires smaller front and rear yard setbacks in certain areas to be able to place the townhomes appropriately. The front yard setback variance request is from 25 feet to 20 feet in some places. The rear yard setback variance request is from 30 feet to 20 feet in some places. City staff does not find this proposal to be detrimental to the public health, welfare, or injurious to other property in the territory in which the property is situated as this development is internal to itself and all units will be affected by this change. This does not impact adjacent properties. In addition, under Minnesota law, we find that practical difficulty has been met, meaning (1) the property owner proposes to use the property in a reasonable manner permitted by the ordinance, (2) the owner's plight is due to circumstances unique to the property not created by the property owner. The request for variance is not based on an economic hardship and solely based on the physical aspects of the configuration of the site and is the best and highest use of the property. Public Hearing: A Final Plat, Rezoning, and Variance requires a Public Hearing and the City Council will open the hearing at their October 26, 2022 meeting to take comment from the public. At that time, they will consider comments from the public and application from the Planning Commission. Public hearing notice letters were sent to addresses within 350 feet of the parcel as well as to the Pioneer Press for publication. Next Steps: The proposed development will follow the process schedule below: October 26, 2022 – City Council Final Plat, Variance, Rezoning and Development Agreement RECOMMENDED ACTIONS 1.To recommend approval for the Final Plat for U.S. Home, LLC, and Lennar, contingent upon the following: a.Incorporating City Engineer comments into Final Plat submittal b.Incorporating RWMWD comments into Final Plat submittal c.Incorporating Ramsey County comments into Final Plat submittal 2.To recommend approval for a Zoning Map Amendment, Rezoning, for U.S. Home, LLC, and Lennar, to amend the official Zoning Map of the City of Little Canada, from R-1 Low Density Residential to R-2 Medium Density Residential for the following (5) parcels: a.PID# 05-29-22-21-0024 b.PID# 05-29-22-21-0029 c.PID# 05-29-22-21-0030 d.PID# 05-29-22-21-0031 e.PID# 05-29-22-21-0032 3.To recommend approval for a Variance for U.S. Home, LLC, and Lennar, for the following setbacks: a.Front Yard Setbacks from 25 feet to 20 feet. b.Rear Yard Setback from 30 feet to 20 feet. H:\Heidi\Planning\Planning Cases\1415 - Lennar - Final Plat 1st addition Variance Rezoning - Paul Tabone\City Engineer Comments Review Memo 10.6.docx October 6, 2022 Corrin Wendell Community Development Director, Planner City of Little Canada RE: Pioneer Commons, First Addition – Final Plan Review Comments (Civil) Corrin, I have reviewed the Pioneer Commons “First Addition Streets and Utilities Buildout” plans dated 09/23/2022. These plans were prepared by WSB and submitted by Lennar Homes. The plans were reviewed for conformance with the City’s comprehensive plan, City code, and industry standards for street, utility, and stormwater management construction. Below is a comprehensive list of administrative items that will need to be addressed through the development agreement as well as technical comments that should be addressed in a revised final plan submittal prior to acceptance. Administrative • A letter of credit will be required in the amount of 125% of the estimated construction costs. The estimated construction cost of $2,100,000 provided by the developer’s engineer is sufficient for a construction cost estimate. • A cash escrow in the amount of $122,800 will be required for the First Addition of this project. The escrow will be used for consulting reviews (engineering and legal) during the final plan and development agreement phase of the project. The escrow will also be used for consulting oversight and inspection of public infrastructure (Vanderbie Street, trails, all watermain, all sanitary sewer, all public storm sewer, stormwater management BMP’s). The cash escrow will also be used for warranty inspections and associated coordination with the developer. A detailed escrow worksheet will be provided in the development agreement. The City reserves the right to charge additional consultant fees as needed. • An as-built grading and utility plan will be required and shall be signed by a MN registered land surveyor or professional engineer certifying that the grades are as shown on the final submitted grading plan. A copy of the as-built requirements worksheet can be provide upon request. • The developer will need to prepare an exhibit(s) that outlines which streets, utilities, and stormwater management features are deemed private versus public. They should include any other infrastructure items I am not thinking of. This figure will be included in the development agreement. • Consent documents must be provided from Xcel Energy and BP Oil for encroachment into their existing private utility easements Name: Corrin Wendell Date: October 7, 2022 Page: 2 H:\Heidi\Planning\Planning Cases\1415 - Lennar - Final Plat 1st addition Variance Rezoning - Paul Tabone\City Engineer Comments Review Memo 10.6.docx Final Plat Comments • An ingress/egress easement over outlots E through M will need to be recorded concurrently with recording of the final plat. • Public utilities are being installed within Outlot B as part of the First Addition. Public utility easements should be defined in the plat to cover the utilities. • Trail easement rights are necessary within Outlot C – either include w/ the overarching Drainage and Utility Easement note or detail a separate trail easement over the trail within the Outlot. Include a trail easement within Outlot B for installation of the trail in the First Addition. • Outlots J, K, L, M should include drainage and utility easement rights. There is no platted boundary drainage and utility easement along Vanderbie Street for private utilities as is typical and required by ordinance. Plan Review Comments Cover Page • Update civil engineer name and contact information (Kyle Hoff) • Final plans should be signed by WSB with block for City Engineer approval signature Overall Existing Conditions Plan • According to City as-builts, the watermain extending south along Desoto Street from County Road D is 10” diameter DIP, not 16” diameter as labeled in the plan. Demolition Plan • Note F - applies to storm sewer structure at intersection of Desoto Street and County Road D. I cannot tell how this structure needs to be reconfigured without a design for Desoto Street. This will be reviewed in a future addition submittal. • Note G – hydrants should be salvaged to City maintenance staff for parts. Install new hydrants where hydrants are impacted. • Note L – this note should be re-emphasized on sheets CU-103 and CU-104. Maintaining existing sewer service to residents is very important. • Show or add note that pavement cut at the intersection of Vanderbie Street and Allen Avenue should extend to curb lines and radius points in all directions. This road was just redone and won’t be touched again for 25+ years. I want to make sure we have straight joints perpendicular to traffic for a strong long-term patch at this intersection. Phasing Plan • The phasing plan east of Vanderbie Street, north of the powerline easement is unclear. Only a portion of the eastern stormwater BMP is included with the First Addition boundary. Also, a portion of Street 1 and a grouping of townhome units is within the First Addition boundary. Name: Corrin Wendell Date: October 7, 2022 Page: 3 H:\Heidi\Planning\Planning Cases\1415 - Lennar - Final Plat 1st addition Variance Rezoning - Paul Tabone\City Engineer Comments Review Memo 10.6.docx Overall Site Plan • All keynotes – update the detail plate callouts to match detail plate number and associated sheet number. • Note F – maintain 6’ sidewalk width around power pole for plowing purposes. • Note I – the City now has a standard detail for these park benches on concrete slabs. Reference detail. • Note J – given there are driveways proposed on Vanderbie Street near Street 1, this curb could be surmountable to allow more flexibility in where the driveway goes. If you have a very strong plan for the driveway location and want to stick with B618, add a note that curb cuts should be staked and installed at driveway locations. • Note M – permanent barricades should be installed at First Addition limits w/ future road extension signs until roads are extended with future additions. WSB can provide a detail for this (Woodbury has a good detail). • Note O – due to its nature as a mid-block crossing, we have previously talked about an enhanced crossing. Please include RRFB signs at this crossing. On that note, include an overall signing plan for the First Addition. • Is there a reason the trail cannot be installed east of Vanderbie Street as part of the First Addition? Additionally, is there a reason the trail cannot be installed south of Desoto Street as part of the First Addition? This would provide First Addition residents with trail access to Thunder Bay Park (and associated trail) and Pioneer Park. Mass Grading, Drainage, & Erosion Control Plan • The grading plan scale, text size, and number of notes makes it very difficult to review the grading plan, follow contours, review storm sewer, etc.. A larger scale version of the grading plan would benefit all project stakeholders. Please modify accordingly. Grading will be re- reviewed with updates submittal. • Label EOF elevations for local low points within the site. Also show nearest LFE to local low points. Example: STCB-5126, unlabeled structure near BL 29 LOT 1 (sheet number unlabeled but is likely CG-103. • The erosion control blanket hatching is very hard to see. Please modify the linetype so that it is visible. Grading Notes • Note 14 under grading notes section – 6” of topsoil should be provided in non-paved areas. Storm Sewer Structure Table • Several flared ends are completely submerged as they discharge into ponds. There appears to be vertical clearance to raise pipes so that inverts are at or just below pond NWL’s. Please revise. • Ensure public catch basins and manholes have castings R-3067 and R-1733, respectively. Storm and sanitary per detail STO-8. Any public boulevard drains should be beehive style R-4342. Name: Corrin Wendell Date: October 7, 2022 Page: 4 H:\Heidi\Planning\Planning Cases\1415 - Lennar - Final Plat 1st addition Variance Rezoning - Paul Tabone\City Engineer Comments Review Memo 10.6.docx Pond Details • Remove sluice gate from OCS.. not practical given the height of the weir wall at the orifice elevation. Water can be pumped over the weir wall to drain the system during times of maintenance. • The OCS detail should be drawn closer to a real scale. The outlet pipe and draintile pipe are shown at the same grade or higher than the inlet pipe but are actually 4’ lower. This makes it difficult to visualize how the OCS operates. The sump on the upstream side of the weir should be filled with concrete and the structure can be made so that there is no sump on the downstream side. • Change the treated timber to vinyl sheet pile for the transition from wet pond to filtration basin. • There doesn’t appear to be a planting plan for the filtration basin. If this is indeed the case, the filtration media should be modified to remove the 30% compost and only include 100% clean sand. If plantings in the filtration media are proposed, keep the compost and include a low maintenance planting plan in the plans. • Construction notes should be added to the detail to ensure impermeable / clay soils are used to separate the wet pond from the filtration basin. Permeable soils will lead to inadvertent pond draining. Street and Storm Plan/Profile • Provide a ‘bump-in’ at the south end of Vanderbie as it approaches the Allen Avenue intersection. This roadway construction would be 22’ face to face with an approximately tangent of 100’. The taper to the bump in should occur after the two existing residential driveways on the east side. Additionally, provide a ‘bump-in’ to 22’ at the trail crossing. • A permit will be required from Ramsey County for Vanderbie street and utility construction adjacent to and connecting to County Road D. • Vanderbie: what is the plan with the existing catch basin at the intersection with County Road D? This will need to be modified/reconstructed to fit the new pavement. (CG-107) • Vanderbie: shift LP at Sta. 11+77 to get catch basins out of driveway entrances • Vanderbie: are structures 5221/5222 intended to be sump structures? They have approximately 18” of sump depth deeper than pipe inverts and are visually depicted as sump structures. Either remove the sumps if not being used for stormwater management or size the sump depth to match the structure diameter. This comment applies to many catch basins that have a sump elevation denoted in the storm structure table. • General note: increase storm sewer linetype – it so small it gets lost underneath the curb lines • Vanderbie: move catch basins 5223/5220 a few feet further north. As shown, will be too close to pedestrian ramp curb tapers. • The trail crossing at Vanderbie depicts asphalt between the sidewalk and street. This should be a concrete pedestrian ramp. • General note: any structures that need to be raised to the final lift of asphalt should be shown in plan view (sanitary castings, gate valve boxes, etc.) Name: Corrin Wendell Date: October 7, 2022 Page: 5 H:\Heidi\Planning\Planning Cases\1415 - Lennar - Final Plat 1st addition Variance Rezoning - Paul Tabone\City Engineer Comments Review Memo 10.6.docx • Vanderbie: show catch basins near Allen Ave in profile view on sheet CG-110. No invert or rim data is provided for the existing storm sewer manhole in Allen Avenue that is being connected to. • Provide intersection detail sheets for all intersections – intersection details should show radii curb grades, street crown transitions, PVI locations, etc. Street and Utility Plan/Profile • MPCA Sanitary Sewer Extension Permit – provide a copy prior to starting construction • DOH Watermain Extension Permit – provide a copy prior to starting construction • Label sanitary sewer size, type, and slope on all sheets (missing on CU-101) • All proposed watermain is shown as DIP. Project team previously requested and was given permission to use C900. Just pointing this out in case it is an oversight in the drawings. Denote on the plans weather copper or plastic water services are being used. • Denote on the plans that tracer wire is required for all plastic watermain and services, in accordance with MRWA specification. • Show and label all drainage and utility easement lines in plan view along all private streets. Curb stops should be located on the D/U easement line. o It is difficult to tell without the easement lines turned on, but it appears the watermain along Street 4 may be outside of the drainage and utility easement. Will confirm once revised plan is submitted showing utility easement lines. Hydrant and curb stop are likely outside of utility easement. • Label existing size and type of existing watermain along County Road D that is being connected to. W-1 is denoted at the connection – include a note or callout specifying how the connection is made. • Provide exhibit that shows hydrant spacing with 250’ radii around hydrants to demonstrate property coverage across the site. Example – I only see one hydrant for all of Street H and its at the very end (680’ long) • Hyd-1 on sheet CU-101 should be a new hydrant. • Extend SANMH-7 to the north to eliminate the bend in the sewer service. • General note: place curb stops at the right-of-way line • Show petroleum pipeline (BP) in profile view as a crossing pipe with approximate depth. I am guessing that BP staff will require potholing, watchdog, etc. Include notes on the plan sheet accordingly. • Provide additional depth to SANMH-7. There is a high likelihood of conflicts between sewer services and the watermain between stations 11+00 and 12+50 on the west side. • General note: curb stops should be located on the right-of-way line. A tail can be installed to get the service further from the right-of-way line for future connection during building construction. Name: Corrin Wendell Date: October 7, 2022 Page: 6 H:\Heidi\Planning\Planning Cases\1415 - Lennar - Final Plat 1st addition Variance Rezoning - Paul Tabone\City Engineer Comments Review Memo 10.6.docx • Sheet CU-101: remove gate valves on Street 1.. show as ‘future’ gate valves when the stubs get connected to. In the interim, stubs will need a corporation stop and 1” line extended to the surface for flushing. The lines will need to be removed after successful pressure and bacteria testing and flushing. In future additions, the plugs will be removed and a new gate valve will be installed. Include gate valve on southern side of the tee to accommodate future connections and minimize water outages. Shift both sewer and water mains north ~2’ so future gate valves are not in curblines. Apply this methodology to all watermain stubs and update valving accordingly. • General note: sewer services should be downstream of water services. • General note: show hydrant valves in plan view as part of hydrant and valve assembly • Sanitary sewer is 17’+ deep near Street 4. Include and detail sanitary sewer risers when service depths are greater than 14’. • General note: hydrant along Vanderbie should be offset 3’ from the sidewalk to ensure the hydrant valve does not end up in the curb. There are locations where the hydrant is only 3’ behind the curb which could cause problems. • Sheet CU-104: move hydrant in northwest quadrant of Allen Ave intersection so that hydrant lead and valve aren’t in conflict with the storm sewer structure • Sheet CU-104: no connection elevation is shown at existing sanitary sewer manhole. As visually depicted, an outside drop will be required. Show and detail this work accordingly, including reconstruction of the manhole bench and invert. • Sheet CU-104: no information provided for size, type, and method of connection to the existing watermain. • Sheet CU-104: sewer and water connections within Allen Ave will undermine existing large- diameter storm sewer – especially the deeper sanitary sewer. My guess is that the contractor will need to remove/salvage and reinstall the storm sewer. Please consider this and make any plan adjustments as necessary so that it is considered in advance versus a construction issue. • Sheet CU-104 / Street H: sanitary sewer services will be in conflict with watermain between stations 16+00 and 16+80. Providing addition sanitary sewer depth should eliminate the conflicts. • Sheet CU-104 / Street H: extend hydrant to 5’ behind curb – currently only 2’ behind curb and hydrant valve will be in curb. It is difficult to tell from the plans what the proposed wall height is here. Additional frost protection may be needed around the hydrant to prevent frost penetration through the wall. • Sheet CU-104 / Street H: extend sewer so that services do not require bends – manhole directly behind the curb should suffice. • Sheet CU-105 / Street H: No design roadway profile shown in profile view. Please add. Profile view missing many utility components as well. • Sheet CU-105 / Street H: sanitary sewer services to conflict with the watermain at crossing between stations 10+25 through 11+50. Name: Corrin Wendell Date: October 7, 2022 Page: 7 H:\Heidi\Planning\Planning Cases\1415 - Lennar - Final Plat 1st addition Variance Rezoning - Paul Tabone\City Engineer Comments Review Memo 10.6.docx • Sheet CU-105 / Street H: storm sewer along eastern curb line will pose problems with sanitary sewer services and watermain services. Notes should be include to address possible vertical conflicts – perhaps installing water services low so that storm sewer can come in over the top after. Include insulation where water services and storm sewer have less than 18” of separation. • Sheet CU-105 / Street H: Extend SANMH-12 to the north so that the water service to east can be installed straight. Similar note for SANMH-13. • Sheet CU-106 / Street G: watermain in profile view appears to be just over 5’ deep in many locations… Ensure 7.5’ of cover is provided for all watermain across the project – double check all locations. • Sheet CU-106 / Street G: sanitary sewer manholes in profile view appear to have sumps below the pipe invert. This applies to many manholes throughout project – check all of them. • Sheet CU-106 / Street G: SANMH-9 rim is floating above the design street profile • Sheet CU-106 / Street G: review possible sanitary sewer service / watermain conflicts on the north end. Also review water service / storm sewer crossing conflicts per previous comments. • Sheet CU-107 / Street 4: is there any benefit to installing the water and sewer service to Lot 3 BL 31 as part of the First Addition work? I think they could be installed in a future additions as well. • Sheet Cu-107 / Street 4: no watermain stub annotation provided. Refer to previous notes regarding watermain stubs. • Sheet CU-108 / Street 2: 18” minimum separation does not appear to be provided between storm sewer and watermain crossings near stations 19+60 and 20+50. Provide insulation when only 18” is provided. • Sheet CU-108 / Street 2: general note for all sanitary sewer stubs –show future sanitary sewer extension in a grey hatch to the next/future manhole. Will likely need to extend plan and profile views. Showing the future pipeline helps ensure current design grades will accommodate extensions. Detail Plates • Include 2022 version of City of Little Canada detail plates (some details in plans are not current) • Include typical MnDOT pedestrian ramp details Sincerely, Bolton & Menk, Inc. Eric Seaburg, PE Little Canada City Engineer October 5, 2022 Melissa Duce Lennar Homes 16305 36th Ave N #600 Plymouth, MN 55446 Nicole Soderholm, Permit Coordinator Pioneer Commons 22-28 On 10/5/2022 the Board of Managers of the Ramsey-Washington Metro Watershed District reviewed your application for the above-described project. A motion was duly made, seconded and passed approving this project providing that the provisions of the permit are met. Your Watershed District permit is being withheld until the project plans are revised to incorporate all special provisions of the permit. Please contact Nicole Soderholm at 651-792-7976 or nicole.soderholm@rwmwd.org if you have any questions regarding these provisions. SPECIAL PROVISIONS 1. The applicant shall submit the final, signed plans set including phased erosion control plans as applicable. 2. The applicant shall submit the executed maintenance agreement for the proposed stormwater facilities. 3. The applicant shall submit written confirmation that the City of Little Canada has reviewed and approved the increase in discharge rates from the north outfall. Bob Barth To: From: Re: cc: K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-TITL-PH 1-PLAN.dwg 9/23/2022 10:50:34 AMCS-001 AS SHOWN SJH KWHSJH N SCALE IN FEET 0 H: 500 1000 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709TITLE SHEET K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-TITL-PH 1-PLAN.dwg 9/23/2022 10:50:34 AMCOUNTY:RAMSEY SECT 5, TWP 29, RNG 22 PROJECT LOCATION A CALL TO GOPHER STATE ONE, 811 OR (651-454-0002) IS REQUIRED A MINIMUM OF 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION. PROJECT LOCATION PIONEER COMMONS LENNAR HOMES PROJECT LOCATION MAP LITTLE CANADA, MINNESOTA PROJECT OWNER/DEVELOPER LENNAR HOMES 16305 36TH AVENUE NORTH SUITE 600 MINNEAPOLIS, MN 55446 CONTACT: MELISSA DUCE PHONE: (763) 249-3000 EMAIL: MELISSA.DUCE@LENNAR.COM PROJECT CONTACT LIST CIVIL ENGINEER WSB, INC. DBA: WSB ENGINEERS & SURVEYORS, INC. 701 XENIA AVE. S., #300 GOLDEN VALLEY, MN 55416 CONTACT: JAMES SOLTIS, PE PHONE: (763) 541-4800 FIRM #16849, EXP. 7/31/2022 EMAIL: JSOLTIS@WSBENG.COM CITY OF LITTLE CANADA PLANNING DIVISION 515 LITTLE CANADA ROAD EAST LITTLE CANADA, MN 55117 CONTACT: CORRIN WENDELL PHONE: (651) 766-4046 FAX: (651) 766-4048 EMAIL: CORRIN.WENDELL@LITTLECANADAMN.ORG ELECTRIC XCEL ENERGY 414 NICOLLET MALL, 6TH FLOOR MINNEAPOLIS, MN 55401 CONTACT: SETH WIGHT PHONE: (612) 342-8926 CELL: (651) 955-5104 EMAIL: SETH.J.WIGHT@XCELENERGY.COM GAS XCEL ENERGY 1700 E COUNTY ROAD E WHITE BEAR LAKE, MN 55110 CONTACT: SCOTT WIDMER PHONE: (651) 779-3506 FAX: (651) 779-3139 EMAIL: SCOTT.A.WIDMER@EXCELENERGY.COM 1.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE PLANS AND REQUIREMENTS OF THE DETAILED SPECIFICATIONS. 2.CONTRACTOR TO OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL PAY ALL PERMIT AND OTHER ASSOCIATED FEES REQUIRED BY LOCAL, STATE AND FEDERAL AGENCIES. 3.EXISTING SITE INFORMATION WAS TAKEN FROM SURVEY INFORMATION PROVIDED BY PIONEER ENGINEERING, & WSB ENGINEERING. EXISTING UTILITY INFORMATION PROVIDED BY CITY OF LITTLE CANADA GIS LINEWORK, AND BOTH SURVEYS. ACTUAL FIELD CONDITIONS MAY VARY. VERIFY ALL FIELD CONDITIONS INCLUDING LOCATION OF UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES AFFECTING THE SCOPE OF THIS CONTRACT. 4.PROTECT ALL PROPERTY CORNERS. RELOCATE BENCHMARKS AS NECESSARY WITH NEW BENCHMARK LOCATIONS WITHIN A TOLERANCE OF 0.010 VERTICAL FEET. 5.THE CONTRACTOR SHALL CONTACT THE LOCAL UTILITY MARKING AUTHORITY PRIOR TO CONSTRUCTION. 6.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY TRAFFIC CONTROL DEVICES TO CONFORM TO THE LATEST VERSION OF THE MINNESOTA "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD). ALL COSTS ASSOCIATED WITH LABOR, MATERIALS, AND EQUIPMENT TO FURNISH AND MAINTAIN TRAFFIC CONTROL WILL BE CONSIDERED INCIDENTAL TO THE PROJECT. 7.UPON COMPLETION OF WORK, THE CONTRACTOR SHALL PROVIDE REDLINED COPIES OF CONSTRUCTION DOCUMENTS TO THE ENGINEER REFLECTING ACTUAL INSTALLATION AS APPROVED BY THE ENGINEER AND/OR OWNER. 8.GRADING ACTIVITY WHICH BLOCKS TRAFFIC OF ANY STREET, ALLEY, OR DRIVE IS SUBJECT TO APPROVAL BY THE CITY. 9.CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE ENGINEER AND OWNER IF CONTAMINANTS ARE FOUND IN THE EXISTING SOILS. 10.PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREA. DO NOT ALLOW WATER TO POND IN EXCAVATION AREAS, AND MAINTAIN ALL EXISTING DRAINAGE PATTERNS. 11.THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH ALL OSHA REGULATIONS IN THE EXECUTION OF WORK UNDER THIS CONTRACT. 12.THE CONTRACTOR SHALL APPLY FOR A CITY OF LITTLE CANADA GRADING PERMIT BEFORE STARTING WORK. NO WORK MAY BEGIN UNTIL THE PERMIT HAS BEEN RECEIVED AND THE CONTRACTOR MUST COMPLY WITH THE TERMS OF THE PERMIT. 13.ALL EXTERIOR BUILDING WALLS AND FOUNDATIONS ADJACENT TO PERVIOUS NON-PAVED AREAS SHALL BE WATERPROOFED TO AN ELEVATION OF 0.5' ABOVE SAID EXTERIOR PERVIOUS GRADE IN ACCORDANCE WITH ARCHITECTURAL PLANS AND SPECIFICATIONS. GENERAL NOTES FIRST ADDITION STREETS AND UTILITIES BUILD-OUT- 09/23/2022 Sheet List Table Sheet Number Sheet Title CS-001 TITLE SHEET CE-101 OVERALL EXISTING CONDITIONS PLAN CE-102 EXISTING CONDITIONS PLAN-NORTH CE-103 EXISTING CONDITIONS PLAN-SOUTH CD-101 OVERALL DEMOLITION PLAN CD-102 DEMOLITION PLAN-NORTH CD-103 DEMOLITION PLAN-SOUTH CS-101 PHASING PLAN CS-102 OVERALL SITE PLAN CS-103 SITE PLAN-NORTH CS-104 SITE PLAN-SOUTH CG-101 GRADING, DRAINAGE, & EROSION CONTROL PLAN CG-102 GRADING, DRAINAGE, & EROSION CONTROL PLAN-NORTH CG-103 GRADING, DRAINAGE, & EROSION CONTROL PLAN-SOUTH CG-104 GRADING NOTES CG-105 STORM SEWER STRUCTURE TABLE CG-106 POND DETAILS CG-107 STREET & STORM PLAN AND PROFILE CG-108 STREET & STORM PLAN AND PROFILE CG-109 STREET & STORM PLAN AND PROFILE CG-110 STREET & STORM PLAN AND PROFILE CG-111 STREET & STORM PLAN AND PROFILE CG-112 STREET & STORM PLAN AND PROFILE CG-113 STREET & STORM PLAN AND PROFILE CG-114 STREET & STORM PLAN AND PROFILE CG-115 STREET & STORM PLAN AND PROFILE CU-101 STREET UTILITY PLAN AND PROFILE CU-102 STREET UTILITY PLAN AND PROFILE CU-103 STREET UTILITY PLAN AND PROFILE CU-104 STREET UTILITY PLAN AND PROFILE CU-105 STREET UTILITY PLAN AND PROFILE CU-106 STREET UTILITY PLAN AND PROFILE CU-107 STREET UTILITY PLAN AND PROFILE CU-108 STREET UTILITY PLAN AND PROFILE CU-109 STREET UTILITY PLAN AND PROFILE CU-110 WATER AND SANITARY SEWER STRUCTURE TABLE LS-101 OVERALL LANDSCAPE PLAN LS-102 ENLARGED LANDSCAPE PLAN-NORTH LS-103 ENLARGED LANDSCAPE PLAN-SOUTH LS-104 COLONIAL MANOR LANDSCAPE PLAN LS-105 TOWNHOME LANDSCAPE PLAN LS-106 OVERALL SEEDING PLAN LS-107 COLONIAL MANOR MATERIALS PLAN LS-108 TOWNHOME MATERIALS PLAN LS-109 LANDSCAPE DETAILS CS-501 CIVIL DETAILS CS-502 CIVIL DETAILS CS-503 CIVIL DETAILS CS-504 CIVIL DETAILS CS-505 CIVIL DETAILS CS-506 CIVIL DETAILS PUBLIC WORKS 515 LITTLE CANADA ROAD EAST LITTLE CANADA, MN 55117 CONTACT: BILL DIRCKS PHONE: (651) 766-4029 FAX: (651) 766-4048 EMAIL: BILL.DIRCKS@LITTLECANADAMN.ORG CITY ENGINEER - BOLTON AND MENK 111 WASHINGTON AVE S., SUITE 650 MINNEAPOLIS, MN 55401 CONTACT: ERIC SEABURG PHONE: (763) 732-8751 EMAIL: ERIC.SEABURG@BOLTON-MENK.COM XXXXXXXXX MB >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>|||||||||||||||||||||||||| | | | ||||||||||||||||||||||||||||||||N00°56'17"W 1100.00S89°58'02"E 552.22 S00°47'50"E 1193.27S89°33'17"W 270.00 N00°47'47"W 95.56N89°57'54"W 279.49 N00°47'50"W 1054.11S89°58'02"E 117.75 S00°49'52"E 254.13S89°58'02"E 151.02 S00°49'52"E 800.00ALLEN AVENUE 60 3333TRUNK H I G H W A Y 3 5 E - 6 9 4 33 33 33 17 3317 ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED)PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) LP TANK FIBER OPTIC SIGN FIBER OPTIC MARKER C C C C C F F F F CCCEX. CB RIM: 907.28 INV: 894.98 N INV: 894.98 E INV: 902.88 S EX. CB RIM: 906.42 INV: 903.42 NEX. STMH RIM: 903.34 INV: 900.44 W EX. CB RIM: 901.60 INV: 896.50 E (30") INV: 896.50 W (30")EX. CB RIM: 897.78 INV: 893.38 E (30") INV: 893.38 W (30") INV: 894.58 N (12") INV: 893.38 S (12")VANDERBIE STREETPIPELINE EASEMENT PER DOC. NO. 426628 6" DIP (PLAN)16" DIP (PLAN)8" DIP (P L A N ) 8" DIP 8" DIP 16" DIP 8" WM 8" WM 6" WMVANDERBIESTREET36" STORMSTORM15" RCP STORM 15" RCP STORM36" RCP 8" DIP COUNTY R O A D D E A S T DESOTOSTREET6" DIP16" DIP12" RCP12" RCP 12" RCP 8" VCP8" VCP8" VCP 8"PVC12" RCP 8" VCP 12" RCP STORMSTORMPATRINAWAYDAVIDCIRCLESTORMXMB MB MBMB MB >>>N89°57'56"W 269.39 60VANDERBIE STREET3333CF EX. CB RIM: 904.26 INV: 899.56 E (30") INV: 899.46 W (30") EX. STMH RIM: 904.91 INV: 899.41 E (30") INV: 899.41 W (30") INV: 899.51 N (18") 6" WM 6" WM>>RIM: 907.55 INV: 893.55 S 8" VCP12" RCP15" RCPSTORMEX. CB RIM: 897.81 INV: 897.41 N (12") INV: 894.41 S (12") INV: 906.10 INV: 906.4812" CMP12" CMP12" CMPINV: 907.58 INV: 907.24 18" CMPINV: 907.48 INV: 907.14 ALLEN AVENUE RIM: 905.14 INV: 887.54 E INV: 887.54 W INV: 887.64 S INV: 894.64 S INV: 887.74 N INV: 892.64 N EX. CB RIM: 904.40 30" STORM 30" STORM 30" STORM 30" STORM 30" STORM K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-EXIST-COND-PH 1-PLAN.dwg 9/23/2022 10:50:48 AMCE-101 AS SHOWN SJH KWHSJH N SCALE IN FEET 0 H: 100 200 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709OVERALL EXISTING CONDITIONS PLAN GERVAIS LAKE NOT TO SCALE PROJECT LOCATION LEGEND (EXISTING CONDITIONS) F oh S ST PROPERTY LINE PROJECT BOUNDARY EXISTING RIGHT-OF-WAY LINE EXISTING SECTION LINE EXISTING LOT LINE EXISTING EASEMENT LINE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING WATERMAIN EXISTING WATER VALVE EXISTING HYDRANT EXISTING WELL EXISTING SANITARY SEWER PIPE EXISTING SANITARY SEWER MANHOLE EXISTING STORM SEWER PIPE EXISTING STORM SEWER MANHOLE, CATCH BASIN EXISTING FIBER LINE EXISTING UNDERGROUND COMMUNICATIONS LINE EXISTING MAILBOX EXISTING AERIAL TOWER, POWER POLES, GUY WIRE EXISTING OVERHEAD ELECTRIC LINE EXISTING UNDERGROUND GAS PIPELINE EXISTING PEDESTALS, SMALL UTILITY STRUCTURES EXISTING SIGN EXISTING FENCE LINE EXISTING TREES EXISTING VEGETATION LINE EXISTING CURB AND GUTTER D C MB p e t r o EXISTING BUILDING EXISTING BITUMINOUS SURFACE EXISTING GRAVEL DRIVEWAY 1020 1019 LOCATION MAP XXX X X X X X X X X X X X X X MB >>>>>>>>>>>>>>>>>|||||||||||||| | | ||||||||||||||||||N00°56'17"W 1100.00S89°58'02"E 552.22 S00°47'50"E 1193.27N00°47'50"W 1054.11S89°58'02"E 117.75 S00°49'52"E 254.13S89°58'02"E 151.02 S00°49'52"E 800.0060 TRUNK H I G H W A Y 3 5 E - 6 9 4 33 17 3317 ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED) PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN FIBER OPTIC MARKER C C C C C C C C C C F F F F F F F F F F EX. CB RIM: 907.28 INV: 894.98 N INV: 894.98 E INV: 902.88 S EX. CB RIM: 906.42 INV: 903.42 N EX. STMH RIM: 903.34 INV: 900.44 W VANDERBIE STREETPIPELINE EASEMENT PER DOC. NO. 426628 6" DIP (PLAN)16" DIP (PLAN)8" DIP 15" RCP S T O R M 15" RCP S T O R M36" RCP COUNTY R O A D D E A S T 8" VCP ||15" RCP STORM||K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-EXIST-COND-PH 1-PLAN.dwg 9/23/2022 10:50:50 AMCE-102 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709EXISTING CONDITIONS PLAN-NORTH N SCALE IN FEET 0 H: 50 100 SEE BELOW MATCHLINE - XXX>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>|||||||||||||||||||||||||||||||||||||||||||||||N00°56'17"W 1100.00S00°47'50"E 1193.27S89°33'17"W 270.00N00°47'47"W 95.56N89°57'54"W 279.49 S00°49'52"E 800.00ALLEN AVENUE33 3333 33 33 17 LP TANK CCCCCCCEX. CB RIM: 901.60 INV: 896.50 E (30") INV: 896.50 W (30") EX. CB RIM: 897.78 INV: 893.38 E (30") INV: 893.38 W (30") INV: 894.58 N (12") INV: 893.38 S (12") 8" DIP 16" DIP 8" WM 8" WM 6" WMVANDERBIE36" STORMSTORMDESOTO STREET12" RCP12" RCP 8" VCP8" VCPXXXMB MB MBMB MB >>>>>>>>>>>>>>>N89°57'56"W 269.39 60 VANDERBIE STREET3333C C CFF F C EX. CB RIM: 904.26 INV: 899.56 E (30") INV: 899.46 W (30") EX. STMH RIM: 904.91 INV: 899.41 E (30") INV: 899.41 W (30") INV: 899.51 N (18") 6" WM>>>>RIM: 907.55 INV: 893.55 S 8" VCP12" RCP EX. CB RIM: 897.81 INV: 897.41 N (12") INV: 894.41 S (12") INV: 906.10 INV: 906.4812" CMP12" CMP12" CMPINV: 907.58 INV: 907.24 18" CMPINV: 907.48 INV: 907.14 ALLEN AVENUE ||||||||RIM: 905.14 INV: 887.54 E INV: 887.54 W INV: 887.64 S INV: 894.64 S INV: 887.74 N INV: 892.64 N EX. CB RIM: 904.40 30" STORM 30" STORM 30" STORM 30" STORM 30" STORM K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-EXIST-COND-PH 1-PLAN.dwg 9/23/2022 10:50:55 AMCE-103 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709EXISTING CONDITIONS PLAN-SOUTH N SCALE IN FEET 0 H: 50 100 SEE ABOVE MATCHLINE - oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohoh ohohoh oh Xoh oh ohohohohXXXXXXXX MB >>>>>>>>>>>>>>>>>>>>S S S S S S S S S S S >>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D D D D D D D D D |||||||||||||||||||||||||| | | | |||||||||||||||||||||||||||||||| ALLEN AVENUE 60 3333TRUNK H I G H W A Y 3 5 E - 6 9 4 33 33 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED)PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) LP TANK FIBER OPTIC SIGN FIBER OPTIC MARKER C C C C C F F F F CCCVANDERBIE STREETPIPELINE EASEMENT PER DOC. NO. 426628 VANDERBIESTREETCOUNTY R O A D D E A S T DESOTOSTREETPATRINAWAYDAVIDCIRCLEohohXMB MB MBMB MB >>>S S S D 60VANDERBIE STREET3333CF>>RIM: 907.55 INV: 893.55 S 8" VCPINV: 906.10 INV: 906.4812" CMP12" CMP12" CMPINV: 907.58 INV: 907.24 18" CMPINV: 907.48 INV: 907.14 ALLEN AVENUE X XXX X X X XXXXXXXXXXX XX X X XX XX XX X XX XX X XXX XXX X XXXX XXX X X XX XXXX X X X X X XX X XXXXX XX XXXX X XXX XXX XXXXXXXXXX XX XX XXX XXXX XXXX XXXXXXXXXXXXXXXX X XX XXXXXXXXXXX XXXXX XXXXXXXXXXXXXXXX XXXXXXX XXXXXXX XXXXXXXX XXX X XXXXXX XX XX XX XX X X XXX XXXXX ohBL 20 1 5 2 6 3 7 4 8 BL 24 1 5 2 6 3 7 4 8 BL 28 1 4 2 5 3 6 BL 21 1 2 BL 25 1 2 3 4 5 6 BL 29 1 2 3 4 5 6 BL 33 1 2 3 4 5 6 BL 32 1 2 3 4 5 6 BL 3 BL 3 BL 3 BL 3 BL 19 1 5 2 6 3 7 4 8 BL 18 1 5 2 6 3 7 4 8 BL 22 1 5 2 6 3 7 4 8 BL 23 1 5 2 6 3 7 4 8 BL 27 1 4 2 5 3 6 BL 26 1 4 2 5 3 6 BL 31 1 2 3 4 BL 30 1 2 3 4 5 6 BL 34 1 2 3 4 5 6 BL 35 1 2 3 4 5 6 BL 16 1 2 3 4 BL 17 1 2 3 4 BL 37 1 2 3 4 BL 36 1 2 BL 4 BL 2 BL 1 BL 7 1 4 2 5 3 6 BL 8 1 4 2 5 3 6 BL 9 1 4 2 5 3 6 BL 14 1 4 2 5 3 6 BL 5 1 3 2 4 BL 6 1 3 2 4 BL 10 1 3 2 4 BL 11 1 3 2 4 BL 12 1 3 2 4 BL 15 1 3 2 4 BL 13 1 2 K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-DEMO-PH 1-PLAN.dwg 9/23/2022 10:51:09 AMCD-101 AS SHOWN SJH KWHSJH N SCALE IN FEET 0 H: 100 200 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709OVERALL DEMOLITION PLAN LEGEND (DEMOLITION) p e t r o F oh S PROPERTY LINE PROJECT BOUNDARY EXISTING SECTION LINE EXISTING RIGHT-OF-WAY LINE EXISTING EASEMENT LINE EXISTING OVERHEAD ELECTRIC LINE EXISTING AERIAL TOWER, POWER POLE, GUY WIRE EXISTING UNDERGROUND PETROLEUM GAS LINE SALVAGE WATER VALVE SALVAGE HYDRANT DEMO WELL DEMO SANITARY SEWER PIPE DEMO SANITARY SEWER MANHOLE DEMO STORM SEWER PIPE/DRIVEWAY CULVERT DEMO STORM SEWER CULVERT DEMO FIBER LINE DEMO UNDERGROUND COMMUNICATIONS LINE DEMO MAILBOX DEMO POWER POLES, GUY WIRE DEMO OVERHEAD ELECTRIC LINE DEMO PEDESTALS, SMALL UTILITY STRUCTURES DEMO SIGN DEMO TREES DEMO VEGETATION LINE DEMO CURB AND GUTTER SAWCUT LINE C MB oh DEMOLITION NOTES 1.THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID TO BECOME FAMILIAR WITH ALL SITE CONDITIONS. ALL SURFACE FEATURES THAT CONFLICT WITH PROPOSED CONDITIONS SHALL BE REMOVED OR RELOCATED WHETHER OR NOT SHOWN ON SURVEY OR SPECIFICALLY CALLED OUT. THIS INCLUDES BUT IS NOT LIMITED TO CLEARING AND GRUBBING. 2.EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSTALLED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. INSTALL EROSION AND SEDIMENTATION CONTROL PRIOR TO DEMOLITION. (SEE SHEET(S) CG101-CG 103) 3.USE TEMPORARY CONSTRUCTION FENCING TO SECURE BUILDING SITE FOR PROTECTION OF PERSONS AND PROPERTY. 4.CONTRACTOR SHALL COORDINATE WITH ALL SMALL UTILITY OWNERS FOR THE DEMOLITION & RELOCATION OF EXISTING UTILITY STRUCTURES AND LINES AS NECESSARY TO ACCOMMODATE PROPOSED IMPROVEMENTS. 5.MAINTAIN FIRE ACCESS WITHIN 150 FEET OF EXTERIOR AREAS OF ALL BUILDINGS DURING CONSTRUCTION. 6.THE CONTRACTOR SHALL REFER TO THE MUTCD FOR TRAFFIC CONTROL REQUIREMENTS. THE CONTRACTOR MAY BE REQUIRED TO PHASE CONSTRUCTION TO MINIMIZE DISRUPTION TO TRAFFIC AND MAINTAIN SITE SAFETY. CONSTRUCTION OPERATIONS SHALL BE PERFORMED IN A WAY TO MINIMIZE THE DISRUPTION TO THE NORMAL FLOW OF TRAFFIC ON ALL STREETS, ALLEYS, AND PUBLIC BUILDING ACCESS. 7.THE CONTRACTOR SHALL REFER TO THE MUTCD FOR TRAFFIC CONTROL REQUIREMENTS. THE CONTRACTOR MAY BE REQUIRED TO PHASE CONSTRUCTION TO MINIMIZE DISRUPTION TO TRAFFIC AND MAINTAIN SITE SAFETY. CONSTRUCTION OPERATIONS SHALL BE PERFORMED IN A WAY TO MINIMIZE THE DISRUPTION TO THE NORMAL FLOW OF TRAFFIC ON ALL STREETS, ALLEYS, AND PUBLIC BUILDING ACCESS. 8.THE CONTRACTOR SHALL OBTAIN AND CONFORM TO ALL PERTINENT CITY, COUNTY AND STATE DETAILS, SPECIFICATIONS, PERMITS, AND COORDINATE INSPECTIONS AS REQUIRED BY THE GOVERNING BODY DURING THE ENTIRE PROJECT DURATION. 9.CONTACT PUBLIC AND PRIVATE UTILITY OWNERS A MINIMUM OF 72 HOURS PRIOR TO THE START OF WORK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND PROTECT ALL EXISTING UTILITIES AND TOPOGRAPHIC FEATURES NOT SCHEDULED FOR REMOVAL. NO ADDITIONAL PAYMENT WILL BE MADE FOR REPAIRING DAMAGE TO EXISTING UTILITIES, RELOCATING, WORKING AROUND, OR PROTECTING EXISTING UTILITIES OR OTHER APPURTENANCES. 10.COORDINATE WITH PRIVATE UTILITY COMPANIES (ELECTRIC, GAS, COMMUNICATIONS) FOR TERMINATION REMOVAL AND OR RELOCATION OF EXISTING SERVICES THROUGHOUT SITE AND REPLACEMENT WITH NEW SERVICES FOR THE PROPOSED DEVELOPMENT. 11.REMOVE TOPSOIL WITHIN LIMITS OF CONSTRUCTION. STOCKPILE ON-SITE FOR USE IN AREAS NOT SCHEDULED FOR BUILDING, PAVEMENT, OR SIDEWALK. 12.A DIAMOND EDGE SAWBLADE SHALL BE USED FOR CUTTING ALL PAVEMENT MARKED FOR REMOVAL. 13.SAWCUT EXISTING PAVEMENT WHICH ABUTS ALL NEW PAVEMENTS TO PROVIDE A STRAIGHT VERTICAL EDGE. 14.PROTECT BY WHATEVER MEANS REQUIRED ALL FENCES, SIGNS, STRUCTURES, DRIVES, SIDEWALKS, STREETS, BUSHES, TREES, ETC. WHICH ARE NOT DESIGNATED FOR REMOVAL, OR OUTSIDE THE LIMITS OF CONSTRUCTION. 15.CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE INCURRED DURING CONSTRUCTION. THIS INCLUDES, BUT IS NOT LIMITED TO, DAMAGE CAUSED BY SUBCONTRACTORS TO THE GENERAL CONTRACTOR. REPAIRS SHALL EQUAL OR EXCEED THE QUALITY OF EXISTING CONDITIONS. 16.CONTRACTOR SHALL REMOVE AND/OR RELOCATE ALL ITEMS NECESSARY TO ACCOMMODATE THE PROPOSED IMPROVEMENTS WHETHER SPECIFICALLY CALLED OUT BY NOTE OR NOT. 17.THE LOCATIONS OF ALL AERIAL AND UNDERGROUND UTILITY FACILITIES ARE APPROXIMATE OR MAY NOT BE INDICATED IN THESE PLANS. UNDERGROUND FACILITIES, WHETHER INDICATED OR NOT, SHALL BE LOCATED PRIOR TO CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL EXISTING UTILITIES, PAVEMENT AND OTHER IMPROVEMENTS. ANY DAMAGE TO EXISTING UTILITIES AND/OR PAVED STREETS CAUSED BY CONSTRUCTION OPERATIONS SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE, IN ACCORDANCE WITH CITY OF LITTLE CANADA PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS FOR CONSTRUCTION, LATEST EDITION. 18.ALL DEBRIS AND REFUSE RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE HAULED OFF-SITE AND DISPOSED OF PROPERLY AT THE CONTRACTOR'S EXPENSE. X DEMO BUILDING DEMO BITUMINOUS SURFACE DEMO GRAVEL DRIVEWAY X DASHED LINE INDICATES PHASE I PROJECT BOUNDARY. ITEMS OUTSIDE PHASING LINE ARE TO ASSUMED TO HAVE BEEN REMOVED IN THE MASS GRADING OPERATION. IN CASE THAT DIDN'T OCCUR WE ARE SHOWING THE ENTIRE DEMOLITION PLAN. oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohoh oh oh oh XXX X X X X X X X X X X X X X MB >>>S S >>>>>>>>>>>>>>D D D |||||||||||||| | | ||||||||||||||||||60 TRUNK H I G H W A Y 3 5 E - 6 9 4 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED) PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN FIBER OPTIC MARKER p e t r o C C C C C C C C C C F F F F F F F F F F EX. CB RIM: 907.28 INV: 894.98 N INV: 894.98 E INV: 902.88 S EX. CB RIM: 906.42 INV: 903.42 N EX. STMH RIM: 903.34 INV: 900.44 W VANDERBIE STREETPIPELINE EASEMENT PER DOC. NO. 426628 6" DIP (PLAN)16" DIP (PLAN)8" DIP 15" RCP S T O R M 15" RCP S T O R M36" RCP COUNTY R O A D D E A S T 8" VCP ||15" RCP STORM||X X X X X X X XX X X X XXX X XX X X X X X X X X XX X X XX XXXX X XX X X X X XXXXXX X X XX X X X X XX XX X X X X X X XXXX BL 20 1 5 BL 21 1 2 BL 19 1 5 BL 18 1 5 BL 34 1 BL 35 1 2 3 BL 16 1 2 3 4 BL 17 1 2 3 4 BL 2 BL 1 BL 7 1 4 2 5 3 6 BL 8 1 4 2 5 3 6 BL 9 1 4 2 5 3 6 BL 14 1 4 2 5 3 6 BL 5 1 3 2 4 BL 6 1 3 2 4 BL 10 1 3 2 4 BL 11 1 3 2 4 BL 12 1 3 2 4 BL 15 1 3 2 4 BL 13 1 2 B B B B B B F D E A E G R RR R R K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-DEMO-PH 1-PLAN.dwg 9/23/2022 10:51:16 AMCD-102 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709DEMOLITION PLAN-NORTH N SCALE IN FEET 0 H: 50 100 SEE BELOW MATCHLINE - DEMO AND DISPOSE OF EXISTING BUILDING AND OVERHANGS. REMOVE AND SALVAGE EXISTING SIGN(S) FOR RE-USE. COORDINATE WITH UTILITY COMPANY, CITY, AND/OR LAND OWNER. DEMO AND DISPOSE OF EXISTING OVERHEAD WIRES, POWER POLE, GUY WIRE. COORDINATE WITH UTILITY COMPANY AND CITY. SALVAGE AND RE-LOCATE EXISTING OVERHEAD WIRES, POWER POLE, GUY WIRE FOR RE-USE. COORDINATE NEW LOCATION WITH UTILITY COMPANY AND CITY. SALVAGE AND RE-LOCATE EXISTING UTILITY/COMMUNICATIONS BOX(ES) AND LINES. COORDINATE RE-USE WITH UTILITY COMPANY AND CITY. CONVERT SOLID MANHOLE COVER TO CATCH BASIN CASTING PER CITY STANDARDS & SPECIFICATIONS. ADJUST RIM. REMOVE AND SALVAGE HYDRANT AND VALVE FOR RE-USE. COORDINATE NEW LOCATION WITH CITY/CIVIL UTILITY PLANS. DEMO AND DISPOSE OF EXISTING MAILBOXES FOR HOMES BEING DEMOLISHED. REMOVE AND SALVAGE MAILBOXES FOR HOME OWNER(S) THAT WILL REMAIN. RE-INSTALL MAILBOX PER CITY STANDARD. ABANDON, REMOVE, AND DISPOSE OF WATER WELL(S) PER CITY/LOCAL STANDARDS. DEMO AND DISPOSE OF ELECTRIC METER AND GAS METER. SAWCUT, DEMO AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER. DEMO AND DISPOSE OF EXISTING 8" VCP SANITARY SEWER LINE AND MANHOLE. EXISTING MANHOLE IN ALLEN AVENUE WHERE VCP CONNECTS TO BE RE-USED FOR NEW SANITARY LINE CONNECTION. SCHEDULE DISCONNECTION ACCORDINGLY TO ALLOW FOR CURRENT RESIDENTS TO MAINTAIN SEWER SERVICE AT ALL TIMES. DEMO AND DISPOSE OF EXISTING 12" & 18" CMP STORM SEWER LINES AND CULVERT(S). DEMO AND DISPOSE OF EXISTING LP TANK. DEMO AND DISPOSE OF EXISTING FENCE. DEMO AND DISPOSE OF EXISTING GRAVEL SURFACE. SAWCUT, DEMO AND DISPOSE OF EXISTING BITUMINOUS SURFACE. EXISTING AERIAL TOWER/FOOTINGS. NO DEMO OR EXCAVATION WITHIN 20' OF EDGE OF TOWER FOOTING. EXISTING POWER POLES/GUY WIRES TO REMAIN. PROTECT AT ALL TIMES. A B KEYNOTES C D E F G H I J K L M N O P Q R S oh ohohohXXXoh oh oh oh ohohohohohohohoh>>>>>>>>>>>>>>>S S>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D||||||||||||||||||||||||||||||||||||||||||||||| ALLEN AVENUE33 3333 33 33 17 LP TANK CCCCCCCEX. CB RIM: 901.60 INV: 896.50 E (30") INV: 896.50 W (30") EX. CB RIM: 897.78 INV: 893.38 E (30") INV: 893.38 W (30") INV: 894.58 N (12") INV: 893.38 S (12") 8" DIP 16" DIP 8" WM 8" WM 6" WMVANDERBIE36" STORMSTORMDESOTO STREET12" RCP12" RCP 8" VCP8" VCPohohohohohohohoh oh XXXMB MB MBMB MB >>>>>>>>>>>>>S S >>D 60 VANDERBIE STREET3333C C CFF F C EX. CB RIM: 904.26 INV: 899.56 E (30") INV: 899.46 W (30") EX. STMH RIM: 904.91 INV: 899.41 E (30") INV: 899.41 W (30") INV: 899.51 N (18") 6" WM>>>>RIM: 907.55 INV: 893.55 S 8" VCP12" RCP EX. CB RIM: 897.81 INV: 897.41 N (12") INV: 894.41 S (12") INV: 906.10 INV: 906.4812" CMP12" CMP12" CMPINV: 907.58 INV: 907.24 18" CMPINV: 907.48 INV: 907.14 ALLEN AVENUE ||||||||RIM: 905.14 INV: 887.54 E INV: 887.54 W INV: 887.64 S INV: 894.64 S INV: 887.74 N INV: 892.64 N X X XX XX XX X XX XX X X X X XX X X XX XX XXX X X X X X X XX X X X XXXXXX X X XX X X X X X X X XXXX XXXX X X XXX XXX XX X XX XXX X X X X XXXXXXXX XX XXXXX XXXXXXX XXXX X X XX X XX XXX XX X XX XXXX X XXX XXX X X X X X X X XXXX XX X X ohohohEX. CB RIM: 904.40 30" STORM 30" STORM 30" STORM 30" STORM 30" STORM BL 20 1 5 2 6 3 7 4 8 BL 24 1 5 2 6 3 7 4 8 BL 28 1 4 2 5 3 6 BL 21 1 2 BL 25 1 2 3 4 5 6 BL 29 1 2 3 4 5 6 BL 33 1 2 3 4 5 6 BL 32 1 2 3 4 5 6 BL 3 BL 3 BL 3 BL 3 BL 19 1 5 2 6 3 7 4 8 BL 18 1 5 2 6 3 7 4 8 BL 22 1 5 2 6 3 7 4 8 BL 23 1 5 2 6 3 7 4 8 BL 27 1 4 2 5 3 6 BL 26 1 4 2 5 3 6 BL 31 1 2 3 4 BL 30 1 2 3 4 5 6 BL 34 1 2 3 4 5 6 BL 35 1 2 3 4 5 6 BL 37 1 2 3 4 BL 36 1 2 BL 4 A A A A A A A A A A A B B B C C C C C C C C C B B E E E E H H H H H E I I J J J K K L L M M M M M I N O P P P P P Q Q Q Q E E S S S S S S S K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-DEMO-PH 1-PLAN.dwg 9/23/2022 10:51:21 AMCD-103 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709DEMOLITION PLAN-SOUTH N SCALE IN FEET 0 H: 50 100 SEE ABOVE MATCHLINE - oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh XXXXXXXXX MB ALLEN AVENUE 60 3333TRUNK H I G H W A Y 3 5 E - 6 9 4 33 33 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o VANDERBIESTREETCOUNTY R O A D D E A S T DESOTOSTREETPATRINAWAYohohX60 3333ALLEN AVENUE ohSTORMWATER POND oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh XXXXXXXXX MB ALLEN AVENUE 60 3333TRUNK H I G H W A Y 3 5 E - 6 9 4 33 33 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o VANDERBIESTREETCOUNTY R O A D D E A S T DESOTOSTREETPATRINAWAYohohX60 3333ALLEN AVENUE ohSTORMWATER POND NWL=900.0 HWL=903.9 BL 20 1 5 2 6 3 7 4 8 BL 24 1 5 2 6 3 7 4 8 BL 28 1 4 2 5 3 6 BL 21 1 2 BL 25 1 2 3 4 5 6 BL 29 1 2 3 4 5 6 BL 33 1 2 3 4 5 6 BL 32 1 2 3 4 5 6 BL 3 BL 3 BL 3 BL 3 BL 19 1 5 2 6 3 7 4 8 BL 18 1 5 2 6 3 7 4 8 BL 22 1 5 2 6 3 7 4 8 BL 23 1 5 2 6 3 7 4 8 BL 27 1 4 2 5 3 6 BL 26 1 4 2 5 3 6 BL 31 1 2 3 4 BL 30 1 2 3 4 5 6 BL 34 1 2 3 4 5 6 BL 35 1 2 3 4 5 6 BL 16 1 2 3 4 BL 17 1 2 3 4 BL 37 1 2 3 4 BL 36 1 2 BL 4 BL 2 BL 1 BL 7 1 4 2 5 3 6 BL 8 1 4 2 5 3 6 BL 9 1 4 2 5 3 6 BL 14 1 4 2 5 3 6 BL 5 1 3 2 4 BL 6 1 3 2 4 BL 10 1 3 2 4 BL 11 1 3 2 4 BL 12 1 3 2 4 BL 15 1 3 2 4 BL 13 1 2 FUTURE PHASE FUTURE PHASE FUTURE PHASE FUTURE PHASE FUTURE PHASE STREET 4 STREET HVANDERBIE STREETSTREET GSTREET HSTREET 2 STREET 2 STREET 1 VANDERBIE STREETSTREET 1 FUTURE PHASE FUTURE PHASE K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-PHASE-PH 1-PLAN.dwg 9/23/2022 10:51:35 AMCS-101 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709PHASING PLAN N SCALE IN FEET 0 H: 100 200 PROPERTY LINE PROPOSED PHASE I LIMITS PROJECT BOUNDARY LINE PHASING PLAN NOTES 1.STREET NAMES ARE SUBJECT TO APPROVAL BY THE CITY. 2.48 UNITS AS PART OF PHASE I BUILD-OUT. PROVIDE SANITARY AND WATER SERVICES FOR 24 FUTURE UNITS AS PART OF PHASE I DUE TO ROADS AND PUBLIC SIDEWALK BEING BUILT IN PHASE I. SEE STREET UTILITY PLANS. 3.STORM SEWER PIPE CONNECTIONS FROM EAST STORMWATER POND TO WEST STORMWATER POND TO BE PART OF PHASE I. ALSO INTERIM STORM SEWER TO BE PART OF PHASE I. SEE GRADING PLANS. LEGEND DASHED LINE INDICATES PHASE I PROJECT BOUNDARY. ITEMS OUTSIDE PHASING LINE ARE TO BE PART OF FUTURE PHASES. 50' PETROLEUM EASEMENT oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh oh XXXXXXXXXXX MB ALLEN AVENUE 60 333333 33 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o VANDERBIESTREETCOUNTY R O A D D E A S T DESOTOSTREETohohohohohX60 3333ALLEN AVENUE ohohSTORMWATER POND oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh oh XXXXXXXXXXX MB ALLEN AVENUE 60 333333 33 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o VANDERBIESTREETCOUNTY R O A D D E A S T DESOTOSTREETohohohohohX60 3333ALLEN AVENUE ohohVANDERBIE STREETVANDERBIE STREETSTREET HSTREET HSTREET GSTREET 2 STREET 2 STREET 4 STREET 1 STREET 1 STORMWATER POND NWL=900.0 HWL=903.9 BL 20 1 5 2 6 3 7 4 8 BL 24 1 5 2 6 3 7 4 8 BL 28 1 4 2 5 3 6 BL 21 1 2 BL 25 1 2 3 4 5 6 BL 29 1 2 3 4 5 6 BL 33 1 2 3 4 5 6 BL 32 1 2 3 4 5 6 BL 3 BL 3 BL 3 BL 3 BL 19 1 5 2 6 3 7 4 8 BL 18 1 5 2 6 3 7 4 8 BL 22 1 5 2 6 3 7 4 8 BL 23 1 5 2 6 3 7 4 8 BL 27 1 4 2 5 3 6 BL 26 1 4 2 5 3 6 BL 31 1 2 3 4 BL 30 1 2 3 4 5 6 BL 34 1 2 3 4 5 6 BL 35 1 2 3 4 5 6 BL 16 1 2 3 4 BL 17 1 2 3 4 BL 37 1 2 3 4 BL 36 1 2 BL 4 BL 2 BL 1 BL 7 1 4 2 5 3 6 BL 8 1 4 2 5 3 6 BL 9 1 4 2 5 3 6 BL 14 1 4 2 5 3 6 BL 5 1 3 2 4 BL 6 1 3 2 4 BL 10 1 3 2 4 BL 11 1 3 2 4 BL 12 1 3 2 4 BL 15 1 3 2 4 BL 13 1 2 28'26' 24'26' 28' 24' 26' 26' 26' 60' ROW 60' ROW 60' ROW FUTURE PHASE FUTURE PHASE FUTURE PHASE FUTURE PHASE FUTURE PHASE FUTURE PHASE FUTURE PHASE K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-SITE-PH 1-PLAN.dwg 9/23/2022 10:51:50 AMCS-102 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709OVERALL SITE PLAN N SCALE IN FEET 0 H: 80 160 PROPERTY LINE FUTURE BITUMINOUS TRAIL EXISTING OVERHEAD POWERLINEoh PROPOSED CROSSWALK EXISTING UNDERGROUND GAS PIPELINEpetro EXISTING RIGHT-OF-WAY LINE EXISTING BUILDING EXISTING EASEMENT LINE EXISTING ADJACENT LOT EXISTING SECTION LINE PROJECT BOUNDARY LINE SITE DEVELOPMENT DATA GROSS AREA: 19.7 ACRES OVERHEAD POWER EASEMENT: 4.6 ACRES PROPOSED UNITS: 178 MANOR HOME UNITS: 114 TOWNHOME UNITS: 64 DENSITY:9.0 UNITS/ACRE ± PUBLIC ROW LENGTH:±1,940 LF PRIVATE ROAD LENGTH: ±5,435 LF VISITOR PARKING PROVIDED:61 SPACES PROPOSED BUILDING SETBACKS 2, 3, OR 4 UNITS FRONT:20' SIDE:15' CORNER:20' REAR:20' MORE THAN 4 UNITS FRONT:20' SIDE:15' CORNER:20' REAR:20' TOWNHOME FRONT:20' SIDE:15' CORNER:20' REAR:20' CURRENT ZONING:R-1 SINGLE FAMILY RESIDENTIAL PROPOSED ZONING:R-2 MEDIUM DENSITY RESIDENTIAL FUTURE LAND USE PER 2040 COMPREHENSIVE PLAN: HIGHER DENSITY RESIDENTIAL AND UTILITY/LINEAR PARK LAND USE GUIDANCE DISTRICT 10 CENTRAL NORTH:MEDIUM DENSITY - 4-10 UNITS/AC ALLOWED PROPOSED SETBACK LINE SITE PLAN NOTES 1.STREET NAMES ARE SUBJECT TO APPROVAL BY THE CITY. 2.DRAINAGE AND UTILITY EASEMENTS SHALL BE PROVIDED AS REQUIRED. DRAINAGE AND UTILITY EASEMENTS WILL BE PROVIDED OVER ALL PUBLIC UTILITIES AND UP TO 1 FOOT ABOVE THE HIGH WATER LEVEL OF ALL PONDS. 3.STREET WIDTH DIMENSIONS ARE SHOWN FROM BACK OF CURB TO BACK OF CURB. ALL OTHER DIMENSIONS ARE SHOWN FROM FACE OF CURB TO FACE OF CURB UNLESS NOTED OTHERWISE. (BOC=BACK OF CURB) PROPOSED RETAINING WALL PROPOSED CONCRETE PROPOSED PHASE I LIMITS PROPOSED BITUMINOUS LEGEND: SCALE: 1 CS-102 TOWNHOME PAVEMENT DETAIL NOT TO SCALE SCALE: 2 CS-102 COLONIAL MANOR HOME PAVEMENT DETAIL NOT TO SCALE BIT. DWY. 18.0' BIT. DWY. 36.0' CONCRETE STOOP & CONCRETE WALK. SEE BUILDING PLANS (TYP.) CONCRETE PATIO. SEE BUILDING PLANS (TYP.)CONCRETE PATIO. SEE BUILDING PLANS (TYP.) BIT. DWY. 36.0' CONCRETE PORCH & CONCRETE WALK. SEE BUILDING PLANS (TYP.) CONCRETE PATIO. SEE BUILDING PLANS (TYP.) PROPOSED STREET LIGHT VANDERBIE STREETXXXXALLEN AVENUE33 3333 33 ohohohohohohohohoh ohohoh 60 ohohohohXXXXALLEN AVENUE33 3333 33 ohohohohohohohohoh ohohoh 60 ohohohohSTREET HSTREET HSTREET GSTREET 4 3 7 4 8 BL 24 1 5 2 6 3 7 4 8 BL 28 1 4 2 5 3 6 BL 25 1 2 3 4 5 6 BL 29 1 2 3 4 5 6 BL 33 1 2 3 4 5 6 BL 32 1 2 3 4 5 6 BL 3 BL 3 BL 3 BL 3 3 7 4 8 3 7 4 8 BL 22 1 5 2 6 3 7 4 8 BL 23 1 5 2 6 3 7 4 8 BL 27 1 4 2 5 3 6 BL 26 1 4 2 5 3 6 BL 31 1 2 3 4 BL 30 1 2 3 4 5 6 3 4 5 6 BL 37 BL 36 1 2 D D G E F L A AR28' BOC R28' BOC E G L A A LL L L L L L E A A G E K PKP CC BC BC A A C C C C C C C C C C C C C M Q Q Q R R R R R R C R20' BOC R20' BOC R20' BOC R20' BOC R20' BOC R20' BOC K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-SITE-PH 1-PLAN.dwg 9/23/2022 10:51:56 AMCS-103 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709SITE PLAN-NORTH N SCALE IN FEET 0 H: 40 100 VANDERBIE STREET50' PETROLEUM EASEMENT DESOTO STREEToh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohoh oh oh oh oh XXX X X X X X X X X X X X X X X X X X MB 60 33 17 33 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t rpetro COUNTY R O A D D E A S T STORMWATER POND oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohoh oh oh oh oh XXX X X X X X X X X X X X X X X X X X MB 60 33 17 33 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t rpetro COUNTY R O A D D E A S T STREET 2 STREET 2 STREET 1 STREET 1 STORMWATER POND NWL=900.0 HWL=903.9 BL 20 1 5 2 6 BL 21 1 2 BL 19 1 5 2 6 BL 18 1 5 2 6 BL 34 1 2 3 BL 35 1 BL 16 1 2 3 4 BL 17 1 2 3 4 BL 1 BL 7 1 4 2 5 3 6 BL 8 1 4 2 5 3 6 BL 9 1 4 2 5 3 6 BL 14 1 4 2 5 3 6 BL 5 1 3 2 4 BL 6 1 3 2 4 BL 10 1 3 2 4 BL 11 1 3 2 4 BL 12 1 3 2 4 BL 15 1 3 2 4 BL 13 1 2 A A D D E G E G J J 6' 36' 18' L LM M E O G 36'J HH H H I I L L L L M M G G E E A A A A A A BC BC C CCC C C KK L C CP P 8.67'2' B B 8' R28' BOC R28' BOC R R R R R R R AA B B B I R21.5' BOC R21.5' BOC R21.5' BOC R21.5' BOC R21.5' BOC R21.5' BOC R21.5' BOC R21.5' BOC R20' BOC R20' BOC R20' BOC R20' BOC L L K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-SITE-PH 1-PLAN.dwg 9/23/2022 10:52:01 AMCS-104 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709SITE PLAN-SOUTH N SCALE IN FEET 0 H: 40 80 B618 CONCRETE CURB AND GUTTER. (SEE DETAIL X/CS50X) TRANSITION FROM B618 TO SURMOUNTABLE CURB AND GUTTER FOR CATCH BASIN INSTALLATION. (SEE DETAIL X/CS50X) SURMOUNTABLE CURB AND GUTTER. (SEE DETAIL X/CS50X) CONSTRUCT NEW CURB AND GUTTER TO TIE INTO EXISTING CURB AND GUTTER OR BITUMINOUS SURFACE. MATCH EXISTING. IN CASE OF TYING INTO AN AREA WHERE THERE IS NO EXISTING CURB AND GUTTER, DOVE TAIL END OF CURB. 6.0' WIDE CONCRETE SIDEWALK. (SEE DETAIL X/CS50X) CONSTRUCT SIDEWALK TO GO AROUND POWER POLE WITH ENOUGH CLEARANCE TO MEET ADA STANDARDS. PEDESTRIAN ACCESS RAMP WITH TRUNCATED DOMES. (SEE DETAIL X/CS50X) 8.0' BITUMINOUS TRAIL. (SEE DETAIL X/CS50X) PARK BENCH ON CONCRETE SLAB. CONCRETE DRIVEWAY APRON. (SEE DETAIL X/CS50X) 90° 9.0' X 20.0' VISITOR PARKING STALLS. BITUMINOUS STREET SECTION. (SEE DETAIL X/CS50X) LIMITS OF PHASE I BITUMINOUS PAVEMENT. CONSTRUCT CROSSWALK. (SEE DETAIL X/CS50X) BITUMINOUS PARKING SECTION. (SEE DETAIL X/CS50X) RETAINING WALL, DESIGN BY OTHERS. REFER TO GRADING PLAN FOR TOP AND BOTTOM OF WALL ELEVATIONS. STREET LIGHT PER CITY OF LITTLE CANADA STANDARDS AND SPECIFICATIONS. SPACING BETWEEN LIGHTS TO BE DETERMINED BY CITY. A KEYNOTES B C D E F G H I J K L M O P Q R 50' PETROLEUM EASEMENT oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh XXXXXXXXX MB >>>>>>>>>>>>>>>>S S S S S S S S S S >>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D D D D D D D D ||||||||||||||||||||||| | | |||||||||||||||||||||||||||||| p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED)PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN C C C C C F F F F CCCPIPELINE EASEMENT PER DOC. NO. 426628 ohohX>>S S D CFoh STORMWATER POND oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh XXXXXXXXX MB >>>>>>>>>>>>>>>>S S S S S S S S S S >>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D D D D D D D D ||||||||||||||||||||||| | | |||||||||||||||||||||||||||||| p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED)PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN C C C C C F F F F CCCPIPELINE EASEMENT PER DOC. NO. 426628 ohohX>>S S D CFohVANDERBIE STREETVANDERBIE STREETSTREET HSTREET HSTREET GSTREET 2 STREET 2 STREET 4 STREET 1 STREET 1 STORMWATER POND NWL=900.0 HWL=903.9 ΔΔΔΔΔ10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+59 10+00 11+00 12+00 13+00 14+00 15+00 15+6010+0011+0012+0012+3710+0011+0012+0012+3510+0011+0012+0012+3510+0011+0012+0012+4810+0011+0012+0012+81>>>>>>>> >>>>>>>>>>SFSFSFSF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SFSF SF>>>>>>>>>>>>>>>>>>>>>>>>ST >>>>>>>>>>K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GRAD-PH 1-PLAN.dwg 9/23/2022 10:52:46 AMAS SHOWN LCW KWHLCW/SJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709MASS GRADING, DRAINAGE, & EROSION CONTROL PLAN N SCALE IN FEET 0 H: 100 200 DASHED LINE INDICATES FIRST ADDITION STREET AND UTILITIES PROJECT LIMIT EXTENTS. MASS GRADING COMPOSES FULL SITE AREA AS SHOWN. GRADING NOTES 1. NOTIFY NICOLE SODERHOLM, RAMSEY-WASHINGTON METRO WATERSHED AT 651-792-7976 PRIOR TO BEGINNING CONSTRUCTION ACTIVITY IN ORDER TO SCHEDULE AN INITIAL SWPPP INSPECTION. 2. NOTIFY NICOLE SODERHOLM, RAMSEY-WASHINGTON METRO WATERSHED DISTRICT, AT 651-792-7976 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION OF THE STORMWATER FILTRATION BENCH. CG-101 VANDERBIE STREET50' PETROLEUM EASEMENT DESOTO STREEToh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohoh oh oh oh XXX X X X X X X X X X X X X X MB >>>>S S >>>>>>>>>>>>>>D D D ||||||||||||||| | | ||||||||||||||||||p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED) PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN p e t r o C C C C C C C C C C F F F F F F F F F F EX. CB RIM: 907.28 INV: 894.98 N INV: 894.98 E INV: 902.88 S EX. CB RIM: 906.42 INV: 903.42 N EX. STMH RIM: 903.34 INV: 900.44 W PIPELINE EASEMENT PER DOC. NO. 426628 6" DIP (PLAN)16" DIP (PLAN)8" DIP 15" RCP S T O R M 15" RCP S T O R M36" RCP 8" VCP15" RCP STORM||STORMWATER POND oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohoh oh oh oh XXX X X X X X X X X X X X X X MB >>>>S S >>>>>>>>>>>>>>D D D ||||||||||||||| | | ||||||||||||||||||p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED) PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN p e t r o C C C C C C C C C C F F F F F F F F F F EX. CB RIM: 907.28 INV: 894.98 N INV: 894.98 E INV: 902.88 S EX. CB RIM: 906.42 INV: 903.42 N EX. STMH RIM: 903.34 INV: 900.44 W PIPELINE EASEMENT PER DOC. NO. 426628 6" DIP (PLAN)16" DIP (PLAN)8" DIP 15" RCP S T O R M 15" RCP S T O R M36" RCP 8" VCP15" RCP STORM||STREET 2 STREET 2 STREET 1 STREET 1 STORMWATER POND NWL=900.0 HWL=903.9 BL 35 BL 16 1 2 3 4 BL 17 1 2 3 4 BL 2 BL 1 BL 7 1 4 2 5 3 6 BL 8 1 4 2 5 3 6 BL 9 1 4 2 5 3 6 BL 14 1 4 2 5 3 6 BL 5 1 3 2 4 BL 6 1 3 2 4 BL 10 1 3 2 4 BL 11 1 3 2 4 BL 12 1 3 2 4 BL 15 1 3 2 4 BL 13 1 2 Δ Δ ΔΔΔΔΔΔΔ10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+5910+0011+0012+0012+3710+0011+0012+0012+3510+0011+0012+0012+3510+0011+0012+0012+4810+00>>>>>>>> >>>> >>>>>>>>>>>>>>>>>>>>>>SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFEOF EOF EOFEOF24" CL III RCP15" CL V RCP 15" CL V RCP 15" CL V RCP 15" CL V RCP 15" CL V RCP 18" CL V RCP15" CL V RCP 24" CL III RCP 18" CL V RCP 15" CL V RCP 15" CL V RCP 15" CL V RCP 15" CL V RCP24" CL I I I RCP 24" CL III RCP 24" CL III RCP 15" CL V RCP 15" CL V RCP 24" CL III RCP 24" CL III RCP 908 909 9 0 7906 906908 90 7 908 909 909908908908907 908 906 909909 908908907908909 909908909909910 910910910910910 910 910908908909 908909901900 9029039049059 0 6 907908908 908909 905904 903 902 901 907906905 904903 902 901905 906 905 899 899 900 901 902 908907904903 901901900899 907 906 909908910911907909 909908907 9 0 5 906>>>>>> >> >>>>>>>>>>>>>>>>>>>>>>>> >> LP:13+63.51 905.67 908FES-6 STCB-5222 STCB-5217 STCB-5223 STCB-5220 STMH-5211 FES-4 STCB-5221 FES-2FES-3 FES-5 STMH-5201 STMH-5204 STCB-5210 STCB-5209 FES-1 STMH-5100 OCS-1 FES-8 STCB-5208 STCB-5130STCB-5101 STUB-5201STUB-5102 07.58 07.72 HP 10.00 07.60 DISCHARGE INV: 904.43 15" CL V RCP STMH-5301 DISCHARGE INV: 904.20 STCB-5218 14.26% 13 . 2 3 % 0.00%9.51%25.02%1.02%1.10%1 4 . 4 2%11.97%25.10%1.61% 25.00% 1. 8 3 % 3.72 %1.99%0.7%2.2%1.0%1.5%1.0%0.5%0.6% 0.5%1.0% 2.48 % 1.57%2.57%2.12 % 1. 8 6 % 2.2 8 % 5.7% 5.4% 4.9% 3.7% 6.8% 6.8% 3.4% 4.2% 5.0% 7.4% 8.1%6.0% 5.5% 3.8%4.8% 5.1% 6.1%7.3% 6.6% 4.8%3.1% 4.1% 4.7% 8.6% 7.2% 5.8% 6.7% 6.6% 6.9% 5.8% 5.9%5.0% 4.6% 3.2% 4.6% 5.1% 6.1% 6.5% 3.2% 3.2% 8.0% 8.5% 4.4% 4.8% 5.8% 6.2% 5.8% 6.8% 4.1% 5.6% 5.3% 6.9% 3.3% 3.7% 7.9% 8.3% 3.4% 5.2 %13.38%GL 08.73 GL 08.71 GL 08.84 GL 08.88 GL 08.68GL 08.43 GL 08.40 GL 08.73 GL 05.13 GL 06.31 GL 06.38 GL 05.91 GL 05.98 GL 06.89 GL 07.01 GL 07.43 GL 08.16GL 07.77 GL 08.32 GL 09.46 GL 07.39 GL 07.35 SW 08.17 SW 07.97 GL 08.20 SW 09.01 GL 07.97 SW 08.59 SW/TBC 09.22 SW/TBC 07.25 EOF 08.42 EOF 05.97 SOG 10.00 GL 07.62 GL 07.59 SOG 10.50SOG 10.50 SOG 10.50 SOG 09.00 SOG 08.50 SOG 08.75 SOG 09.75 SOG 09.75 SOG 09.19 SOG 10.75SOG 10.50 SOG 10.50 GL 06.15 GL 06.27 GL 06.20GL 06.11 GL 06.18 GL 05.07 GL 04.89 GL 05.37GL 06.07 GL 05.64 GL 08.32 GL 08.40 GL 08.33 GL 07.86 GL 08.36 GL 07.74 GL 08.05 GL 08.16 GL 08.54 GL 07.48 GL 07.51 GL 08.47 GL 08.17 GL 08.66GL 08.67 GL 07.89 GL 08.13 GL 07.08 GL 08.11 GL 09.13GL 09.13 GL 06.26 GL 06.26 GL 06.58 GL 06.21 GL 06.39 GL 06.21 GL 06.52 GL 06.58 GL 07.53 GL 07.37 GL 07.60GL 07.60 GL 07.37 GL 07.53 GL 09.42GL 09.42 GL 09.31GL 09.31 GL 09.39 GL 08.77 GL 09.50 GL 09.37 GL 09.39 GL 09.46 GL 06.32 GL 06.35 GL 07.29 GL 07.45 GL 06.67 GL 06.12 GL 06.61 GL 06.49 GL 08.12 GL 07.09 SW/TBC 07.04 SW 08.01 SW 08.82GL 07.55 GL 06.56 GL 06.86 GL 07.45 GL 07.45 GL 08.17 GL 08.09 GL 08.66 GL 09.02 GL 09.52GL 09.53 GL 09.36 GL 09.09 GL 09.11 GL 09.21 GL 09.74 GL 09.14 GL 09.50 GL 09.84 GL 08.52 HP 10.25 GL 05.30 GL 05.98 GL 05.81 GL 07.02 SW/TBC 09.19 LP:15+39.46 906.98 HP:11+19.34 907.89 LP:11+77.86 907.57 HP:13+05.22 909.05 K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GRAD-PH 1-PLAN.dwg 9/23/2022 10:52:59 AMCG-102 AS SHOWN LCW KWHLCW/SJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709MASS GRADING, DRAINAGE, & EROSION CONTROL PLAN-NORTH N SCALE IN FEET 0 H: 50 100 GRADING NOTES LEGEND APPROX. CONSTRUCTION LIMITS EXISTING CONTOUR (MAJOR)1019 EXISTING CONTOUR (MINOR)1019 EXISTING FENCEXX PROPOSED FENCEXX 965.77 PROPOSED SPOT ELEVATION PROPERTY LINE EXISTING EASEMENT PROPOSED EASEMENT PROPOSED CONTOUR (MAJOR)1019 PROPOSED CONTOUR (MINOR)1019 EXISTING STORM STRUCTURE PROPOSED DRAINAGE STRUCTURE ST EXISTING STORM SEWER PIPE PROPOSED STORM SEWER PIPE>> >> EXISTING SANITARY SEWER MAIN> PROPOSED SANITARY SEWER MAIN> EXISTING SANITARY SEWER SERVICE PROPOSED SANITARY SEWER SERVICE EXISTING SANITARY STRUCTURE PROPOSED SANITARY STRUCTURE S S SF INLET PROTECTION FLOW DIRECTION RIP RAP SILT FENCE STABILIZED CONSTRUCTION ENTRANCE Δ 20' OFFSET FROM TOWER FOOTINGS WHERE EARTH CUT OR FILL IS NOT ALLOWED SURFACE SAND FILTER MEDIA DRAINAGE SURFACE FLOW PATH (EOF) EROSION CONTROL BLANKET TYPE 3N EROSION CONTROL BLANKET CAT 25N PROPOSED SLAB ON GRADE ELEVATIONSOG TEMPORARY SEDIMENT TRAP 1. SEE SHEET CG-108 FOR OUTLET CONTROL STRUCTURE (OCS) DESIGN DATA. 2. NOTIFY NICOLE SODERHOLM, RAMSEY-WASHINGTON METRO WATERSHED AT 651-792-7976 PRIOR TO BEGINNING CONSTRUCTION ACTIVITY IN ORDER TO SCHEDULE AN INITIAL SWPPP INSPECTION. 3. NOTIFY NICOLE SODERHOLM, RAMSEY-WASHINGTON METRO WATERSHED DISTRICT, AT 651-792-7976 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION OF THE STORMWATER FILTRATION BENCH. TEMPORARY SEDIMENT TRAP (TYP) 1 1 KEY NOTES 1. INSTALL RIP RAP AT END OF PHASE 1 STORM PIPES. CONSTRUCT DRAINAGE SWALE TO DOWNSTREAM TEMPORARY SEDIMENT TRAPS. DISCHARGE PIPE OUTLET FROM TEMPORARY SEDIMENT TRAPS TO STRUCTURES STMH-5301 AND STMH-5211, RESPECTIVELY. 2. OUTLET PIPES FROM TEMPORARY SEDIMENT TRAPS TO BE INSTALLED UNDER PROPOSED TRAIL. TEMPORARY PIPE IS NOT TO BE WITHIN TRAIL BASE. 2 2 2 VANDERBIE STREETXXX>>>>>>>>>>>>>>S S>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D||||||||||||||||||||||||||||||||||||||||||||||CCCCCCEX. CB RIM: 901.60 INV: 896.50 E (30") INV: 896.50 W (30") EX. CB RIM: 897.78 INV: 893.38 E (30") INV: 893.38 W (30") INV: 894.58 N (12") INV: 893.38 S (12") 8" DIP 16" DIP 8" WM 8" WM 6" WM36" STORMSTORM12" RCP12" RCP 8" VCP8" VCPohohohohohohohoh XXX>>>>>S >>D C C CFF F EX. CB RIM: 904.26 INV: 899.56 E (30") INV: 899.46 W (30") EX. STMH RIM: 904.91 INV: 899.41 E (30") INV: 899.41 W (30") INV: 899.51 N (18") 6" WM 12" RCP EX. CB RIM: 897.81 INV: 897.41 N (12") INV: 894.41 S (12")||||||||RIM: 905.14 INV: 887.54 E INV: 887.54 W INV: 887.64 S INV: 894.64 S INV: 887.74 N INV: 892.64 N ohohohEX. CB RIM: 904.40 30" STORM 30" STORM 30" STORM 30" STORM 30" STORMXXX >>>>>>>>>>>>>>S S>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D||||||||||||||||||||||||||||||||||||||||||||||CCCCCCEX. CB RIM: 901.60 INV: 896.50 E (30") INV: 896.50 W (30") EX. CB RIM: 897.78 INV: 893.38 E (30") INV: 893.38 W (30") INV: 894.58 N (12") INV: 893.38 S (12") 8" DIP 16" DIP 8" WM 8" WM 6" WM36" STORMSTORM12" RCP12" RCP 8" VCP8" VCPohohohohohohohoh XXX>>>>>S >>D C C CFF F EX. CB RIM: 904.26 INV: 899.56 E (30") INV: 899.46 W (30") EX. STMH RIM: 904.91 INV: 899.41 E (30") INV: 899.41 W (30") INV: 899.51 N (18") 6" WM 12" RCP EX. CB RIM: 897.81 INV: 897.41 N (12") INV: 894.41 S (12")||||||||RIM: 905.14 INV: 887.54 E INV: 887.54 W INV: 887.64 S INV: 894.64 S INV: 887.74 N INV: 892.64 N ohohohEX. CB RIM: 904.40 30" STORM 30" STORM 30" STORM 30" STORM 30" STORMSTREET HSTREET HSTREET GSTREET 2 STREET 2 STREET 4 BL 20 1 5 2 6 3 7 4 8 BL 24 1 5 2 6 3 7 4 8 BL 28 1 4 2 5 3 6 BL 21 1 2 BL 25 1 2 3 4 5 6 BL 29 1 2 3 4 5 6 BL 33 1 2 3 4 5 6 BL 32 1 2 3 4 5 6 BL 3 BL 3 BL 3 BL 3 BL 19 1 5 2 6 3 7 4 8 BL 18 1 5 2 6 3 7 4 8 BL 22 1 5 2 6 3 7 4 8 BL 23 1 5 2 6 3 7 4 8 BL 27 1 4 2 5 3 6 BL 26 1 4 2 5 3 6 BL 31 1 2 3 4 BL 30 1 2 3 4 5 6 BL 34 1 2 3 4 5 6 BL 35 1 2 3 4 5 6 BL 37 1 2 3 4 BL 36 1 2 BL 4 10+00 11+00 12+00 13+00 14+00 15+00 15+60 10+0011+0012+0012+81>>>>>>>>>>>>>>>>>>>>>>>>>>SFSFSFSFSFSFSFSF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SFSFSF SF SF SF SF 15" CL V RCP 15" CL V RCP24" CL I I I RCP 24" CL III RCP 24" CL III RCP15" CL V RCP 15" CL V RCP 15" CL V RCP 24" CL III RCP 24" CL III RCP 15" CL V RCP 18" CL V RCP 18" CL V RCP15" CL V RCP 15" CL V RCP15" CL V RCP 15" CL V RCP 15" CL V RCP 15" CL V RCP 18" CL V RCP 15" CL V RCP 18" CL V RCP9 0 6 904903 902 906 905 902 909909909910910909909 909908909909909908 909903904905906907908909907908909908907910909 909 908 908 909 907907 9 0 5 906>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>HP:15+85.69906.56ST >>>>>>>>STMH-5201 STCB-5205 STCB-5206 STCB-5131 STCB-5130 STCB-5101 STCB-5113 STCB-5112 STCB-5102 STCB-5119 STCB-5117 STCB-5118 STCB-5124 STCB-5125 STCB-5123 STCB-5127 STCB-5122 STCB-5128 STCB-5121 STUB-5201STUB-5102 HP 08.70 HP 09.97 07.58 07.72 HP 09.69 09.15 09.63 STCB-5602 STCB-5601908EOF 08.58 EOF 08.58 >>>>>>>>>>>>>> STCB-5126 15" CL V RCP STCB-5132 STCB-5116 STCB-5114 STCB-5115 HP 09.50 HP 09.18 13 . 2 3 %25.02%0.79%0.79%1.66%1.36%0.60%0.60%0.59%0.60%0.6%0.64%0.80%0.43% 1 4 . 4 2%11.97%1.99%1.6%1.66%1.3%1.6%0.4%0.54%0.7%0.8%0.60%8.1%7.5%6.3%5.7%7.0%6.3%5.4%4.9%4.1%3.6%3.3% 3.8% 5.2% 7.4% 8.3% 9.9% 7.5% 7.5% 8.9% 7.5% 4.3% 3.2% 6.2% 5.3% 5.0%6.4% 4.1% 6.3% 5.6%8.5% 6.2% 7.4% 5.3% 5.6%9.4% 9.0% 8.3% 7.9% 6.6% 6.5% 5.8% 5.2% 5.3% 4.4% 6.0% 7.6% 6.7% 3.6% 2.6% 4.0% 3.1% 7.5% 8.6% 6.0% 5.5% 5.0% 4.9% 3.6% 3.1% 3.2% 4.2% 4.6% 8.0% 7.8% 6.9% 6.5% 5.6% 5.1% 7.3% 6.8% 5.8% 4.9% 4.2% 3.4%3.4% 4.3% 5.2% 5.6% 6.6% 7.2% 5.1% 6.8% 6.5% 5.3% 6.5% 5.6% 4.7% 4.8% 4.6% 4.9%8.9% 5.5% 7.7% 5.6% 6.4% 6.9% 3.1% 3.8% 4.8% 6.0% 6.4%4.7% 4.6% 4.2% 5.0% 4.6% 3.4% 4.1% 5.0% 5.5% 6.1% 5.5% 6.8% 7.4% 8.1% 8.3% 5.4% 6.3% 7.2% 7.5% GL 05.57 GL 05.84 GL 05.90 GL 05.68 GL 05.13 GL 06.45 GL 06.64GL 06.53 GL 06.02 GL 06.31 GL 06.38 GL 05.91 GL 05.98 GL 06.89 GL 07.01 GL 06.46 GL 06.95 GL 07.43GL 07.42 GL 06.79 GL 07.04 GL 07.43 GL 08.16GL 07.77 GL 08.32 GL 08.19 GL 07.53 SW/TBC 07.25 SW/TBC 07.66 GL 06.72 GL 06.72 GL 07.11 GL 06.87 GL 07.65 GL 08.06 GL 07.33 GL 07.65 GL 07.64 GL 08.25 GL 08.98 GL 09.37 GL 09.48 GL 09.88 GL 09.91 GL 09.43 GL 09.51 GL 10.05 GL 09.44 GL 05.15 GL 08.27 GL 08.02 GL 08.01 GL 07.40 SW/TBC 10.19 SW/TBC 10.25 GL 08.98 GL 08.98 TW 08.25TW 09.00 TW 07.26 TW 08.36 TW 07.22 BW 07.22BW 02.99 BW 04.19BW 01.97 BW 07.04 SOG 08.00 SOG 09.00 SOG 08.75 SOG 10.00 SOG 09.60 SOG 09.60 SOG 09.75 SOG 09.25SOG 08.60 SOG 10.00 SOG 10.00 SOG 10.75 SOG 10.50 SOG 10.25 SOG 10.25 EOF 08.01 GL 07.71 GL 07.73 GL 08.02 GL 07.08 GL 07.68 GL 08.56 GL 08.35 GL 07.64 GL 08.02GL 07.20 GL 06.79GL 06.80 GL 07.21 GL 07.53 EOF 08.01 GL 08.48 GL 06.89 GL 09.03 GL 09.03 GL 05.19 GL 06.79 GL 09.05 GL 10.12 GL 09.91 GL 09.00GL 09.00 GL 09.03 GL 06.78 SW 07.82 SOG 08.85 SOG 09.85 SOG 10.00 SOG 09.00 SOG 09.25 SOG 09.75 SOG 08.75 SOG 08.25 SOG 09.25 SOG 09.75 SOG 09.00 GL 06.15 GL 06.27 GL 06.20GL 06.11 GL 06.18 GL 06.70 GL 06.53 GL 06.64 GL 06.57 GL 06.05 GL 05.78 GL 05.07 GL 04.89 GL 05.37 GL 08.48 GL 08.45 GL 08.11 GL 07.53 GL 07.55 GL 07.54 GL 07.11 GL 08.76 GL 08.80 GL 09.01 GL 06.46 GL 07.20 GL 06.07 GL 05.64 GL 08.57 GL 08.11 GL 08.84 GL 08.53 GL 08.52 GL 08.13 GL 07.10 GL 07.66GL 07.42 GL 07.08 GL 07.78 GL 08.26 GL 07.69 GL 07.13 GL 08.68 GL 07.85 GL 07.11 HP 09.75 HP 09.13 HP 08.52 HP 09.25 GL 05.30 GL 05.98 GL 05.81 HP 09.51 08.09 LP 06.88 LP 07.70 GL 07.02 EOF 08.34 EOF 08.34 EOF 08.28 EOF 08.28 LP 07.80 LP 07.21 LP 07.24 TW 07.75 BW 01.51 08.51 HP:12+00.69 908.28 LP:14+50.00 906.98 HP:12+34.17 908.83 LP:14+38.55 907.87 HP:21+51.50 910.48 HP:11+82.45 908.62 LP:13+17.35 907.93 HP:11+73.42 908.52 LP:13+29.40 906.93 K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GRAD-PH 1-PLAN.dwg 9/23/2022 10:53:12 AMAS SHOWN LCW KWHLCW/SJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709MASS GRADING, DRAINAGE, & EROSION CONTROL PLAN-SOUTH N SCALE IN FEET 0 H: 50 100 BOTTOM OF WALL AT EG MAX WALL HEIGHT = 8' LEGEND APPROX. CONSTRUCTION LIMITS EXISTING CONTOUR (MAJOR)1019 EXISTING CONTOUR (MINOR)1019 EXISTING FENCEXX PROPOSED FENCEXX 965.77 PROPOSED SPOT ELEVATION PROPERTY LINE EXISTING EASEMENT PROPOSED EASEMENT PROPOSED CONTOUR (MAJOR)1019 PROPOSED CONTOUR (MINOR)1019 EXISTING STORM STRUCTURE PROPOSED DRAINAGE STRUCTURE ST EXISTING STORM SEWER PIPE PROPOSED STORM SEWER PIPE>> >> EXISTING SANITARY SEWER MAIN> PROPOSED SANITARY SEWER MAIN> EXISTING SANITARY SEWER SERVICE PROPOSED SANITARY SEWER SERVICE EXISTING SANITARY STRUCTURE PROPOSED SANITARY STRUCTURE S S SF INLET PROTECTION FLOW DIRECTION RIP RAP SILT FENCE STABILIZED CONSTRUCTION ENTRANCE Δ 20' OFFSET FROM TOWER FOOTINGS WHERE EARTH CUT OR FILL IS NOT ALLOWED SURFACE SAND FILTER MEDIA DRAINAGE SURFACE FLOW PATH (EOF) EROSION CONTROL BLANKET TYPE 3N EROSION CONTROL BLANKET CAT 25N PROPOSED SLAB ON GRADE ELEVATIONSOG TEMPORARY SEDIMENT TRAP WEST POND EMERGENCY OVERFLOW FLOWS SOUTH ALONG SWALE WITHIN DESOTO RIGHT-OF-WAY GRADING NOTES 1. NOTIFY NICOLE SODERHOLM, RAMSEY-WASHINGTON METRO WATERSHED AT 651-792-7976 PRIOR TO BEGINNING CONSTRUCTION ACTIVITY IN ORDER TO SCHEDULE AN INITIAL SWPPP INSPECTION. 2. NOTIFY NICOLE SODERHOLM, RAMSEY-WASHINGTON METRO WATERSHED DISTRICT, AT 651-792-7976 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION OF THE STORMWATER FILTRATION BENCH. TEMPORARY SEDIMENT TRAP (TYP) K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GRAD-NOTE-PH 1-PLAN.dwg 9/23/2022 10:53:19 AMCG-104 AS SHOWN LCW KWHLCW/SJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709GRADING NOTES GRADING NOTES 1.RELOCATE BENCHMARKS AS NECESSARY WITH NEW BENCHMARK LOCATIONS WITHIN A TOLERANCE OF 0.010 VERTICAL FEET. 2.SLAB ON GRADE (SOG) ELEVATIONS, AS INDICATED ON THE CIVIL DRAWINGS, CORRESPONDS TO ELEVATION 100'-0" ON ALL OTHER DISCIPLINE SHEETS (ARCHITECTURAL, STRUCTURAL, ETC). SLAB ON GRADE ELEVATIONS ARE ALSO THE LOW FLOOR ELEVATIONS FOR ALL BUILDINGS. 3.THE PROPOSED GRADES SHOWN ON THE GRADING PLAN ARE FINISHED GRADES. SPOT ELEVATIONS ALONG CURB LINES REPRESENT THE FLOWLINE UNLESS OTHERWISE NOTED. 4.CATCH BASINS AT LOW POINTS SHALL HAVE ADDITIONAL 2" CASTING SUMP BELOW SPOT GRADES SHOWN ON THE PLAN. 5.GRADING ACTIVITY WHICH BLOCKS TRAFFIC OF ANY STREET, ALLEY, OR DRIVE IS SUBJECT TO APPROVAL BY THE CITY. 6.CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE ENGINEER AND OWNER IF CONTAMINANTS ARE FOUND IN THE EXISTING SOILS. 7.SIDEWALK AND BITUMINOUS TRAIL CROSS-SLOPES SHALL NOT EXCEED 2.0% AND LONGITUDINAL SLOPES SHALL NOT EXCEED 5.0%. 8.STRIP TOPSOIL PRIOR TO PLACING FILL. 9.IN AREAS WHERE NEW FILL IS TO BE PLACED ON SLOPING GROUND, BENCHING THE SURFACE SHALL BE COMPLETED PRIOR TO PLACING THE FILL. BENCHING SHALL BE COMPLETED WHERE SLOPES ARE STEEPER THAN 4:1 (HORIZONTAL:VERTICAL). 10.PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREA. DO NOT ALLOW WATER TO POND IN EXCAVATION AREAS, AND MAINTAIN ALL EXISTING DRAINAGE PATTERNS. 11.UNLESS OTHERWISE NOTED, FINISH GRADE SHALL BE SIX INCHES BELOW FINISHED FLOOR IN NON-PAVED AREAS. 12.THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH ALL OSHA REGULATIONS IN THE EXECUTION OF WORK UNDER THIS CONTRACT. 13.THE CONTRACTOR SHALL APPLY FOR A CITY GRADING PERMIT BEFORE STARTING WORK. THE INSPECTOR AND THE CITY PUBLIC WORKS DEPARTMENT SHALL BE NOTIFIED BY THE CONTRACTOR 48 HOURS BEFORE START OF CONSTRUCTION. NO WORK MAY BEGIN UNTIL THE PERMIT HAS BEEN RECEIVED AND THE CONTRACTOR MUST COMPLY WITH THE TERMS OF THE PERMIT. 14.ALL NON-PAVED AREAS SHALL RECEIVE A FOUR-INCH (4") LAYER OF TOPSOIL. INSTALL SEED ACCORDING TO THE OVERALL SEEDING PLAN. 15.THE CONTRACTOR SHALL ADJUST TO GRADE ALL MANHOLE STRUCTURES AND APPURTENANCES THAT FALL WITHIN THE LIMITS OF THIS CONTRACT. THE CONTRACTOR SHALL KEEP ALL SAID EXISTING UTILITIES AND THEIR APPURTENANCES FREE OF DEBRIS AND OPERABLE AT ALL TIMES DURING CONSTRUCTION. 16.ALL GRADES WITHIN THE LANDSCAPED AREA SHALL NOT EXCEED 4 HORIZONTAL TO 1 VERTICAL AND HAVE A MINIMUM GRADE OF 2%, UNLESS OTHERWISE NOTED. GRADED SWALES MUST HAVE A MINIMUM BOTTOM SLOPE OF 2.0% LONGITUDINALLY. 17.ALL PAVEMENT GRADES SHALL BE AS FOLLOWS IN THE DIRECTION OF FLOW: ASPHALT PAVEMENT - 1.5% MINIMUM, 5% MAXIMUM CONCRETE PAVEMENT - 1% MINIMUM, 5% MAXIMUM CONCRETE CURB AND GUTTER - 0.50% MINIMUM 18.MASS GRADING OPERATIONS BEYOND PHASE 1 BOUNDARY SHALL ALSO COMPLY WITH THE FOLLOWING: 18.1.CONTRACTOR TO GRADE TO THE BOTTOM OF STREET SECTION AND BUILDING PAD HOLD-DOWNS. 18.2.CONTRACTOR TO MAINTAIN POSITIVE DRAINAGE IN THE INTERIM FOR ALL FUTURE LOW POINT LOCATIONS WHERE STORM SEWER IS NOT BEING BUILT IN THIS PHASE. 19.CONCRETE WASHOUT IS NOT PERMITTED ONSITE. EROSION CONTROL NOTES 1.A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS INCLUDED WITH THIS PROJECT. FAILURE TO IMPLEMENT THE CONTROLS AND PRACTICES OUTLINED WOULD RESULT IN VIOLATION OF THE ENVIRONMENTAL PROTECTION ACT AND CLEAN WATER ACT AND IS GROUNDS FOR PENALTIES. CONTRACTOR IS RESPONSIBLE FOR PAYMENT OF ALL FINES AND PENALTIES ISSUED BY THE CITY AND OTHER GOVERNING AGENCIES FOR INADEQUATE EROSION CONTROL. 2.ESTABLISH SEDIMENT CONTROL MEASURES AT THE BEGINNING OF CONSTRUCTION AND MAINTAIN DURING THE ENTIRE LENGTH OF CONSTRUCTION. AREAS WHICH ARE SUBJECT TO SEVERE EROSION AND OFF-SITE AREAS WHICH ARE ESPECIALLY VULNERABLE TO DAMAGE FROM EROSION AND/OR SEDIMENTATION ARE TO BE IDENTIFIED AND RECEIVE ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES AS DIRECTED BY THE OWNER'S CONSTRUCTION REPRESENTATIVE. EROSION CONTROL DEVICES SHALL BE INSTALLED PROPERLY PRIOR TO ANY LAND DISTURBING ACTIVITIES. 3.LOCATIONS OF STABILIZED CONSTRUCTION ENTRANCES INDICATED ON PLANS ARE APPROXIMATE. CONTRACTOR SHALL ADJUST LOCATION AND SIZE OF ENTRANCES TO ACCOMMODATE CONSTRUCTION VEHICLES AND ACTIVITIES. 4.CONDUCT ALL LAND DISTURBING ACTIVITIES TO MINIMIZE THE AREA TO BE EXPOSED AT ANY ONE TIME AND MINIMIZE THE TIME OF EXPOSURE. MASS CLEARING AND GRADING OF THE ENTIRE SITE SHOULD BE AVOIDED. COORDINATE ALL LAND DISTURBING ACTIVITIES TO MINIMIZE OFF-SITE SEDIMENTATION DAMAGE. RESTABILIZE DISTURBED AREAS AS SOON AS POSSIBLE AFTER CONSTRUCTION IS COMPLETED IN ACCORDINACE WITH THE NPDES PERMIT. 5.PERIODICALLY CLEAN OUT AND DISPOSE OF ALL SEDIMENT ONCE THE STORAGE CAPACITY OF THE DRAINAGE FEATURE OR STRUCTURE RECEIVING THE SEDIMENT IS REDUCED BY ONE-HALF. CLEAN OUT AND DISPOSE OF ALL SEDIMENT AT THE COMPLETION OF THE PROJECT. ALL STREETS IN AND ADJACENT TO THE PROJECT SHALL REMAIN CLEAN AND PASSABLE AT ALL TIMES. ANY SEDIMENT OR DEBRIS SHALL BE REMOVED WITHIN 24 HOURS, OR AS OFTEN AS NEEDED TO ENSURE PUBLIC SAFETY AND TO COMPLY WITH THE NPDES PERMIT. CONTRACTOR IS REQUIRED TO MAINTAIN AND REPLACE ALL EROSION CONTROL DEVICES AS NECESSARY TO COMPLY WITH THE NPDES PERMIT AND CITY REQUIREMENTS AT NO COST TO THE OWNER. 6.INLET PROTECTION WILL BE INSTALLED AT ALL CATCH BASINS WITHIN THE PROJECT AREA. THE CONTRACTOR SHALL PROVIDE APPROPRIATE EROSION CONTROL DEVICES FOR STOCKPILE AREAS, INLETS AND DITCHES. DITCHES MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE TO ANY SURFACE WATER. STABILIZATION MUST BE COMPLETED WITHIN 24 HOURS OF CONNECTING TO SURFACE WATER. 7.REMOVE THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AND VERIFY THE CLEANING OUT OF ALL STORM DRAINAGE STRUCTURES, INCLUDING FLUMES, PIPES, AND DITCHES ONCE FINAL STABILIZATION HAS OCCURRED. 8.PIPE OUTLETS NEED TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS OF GOING ONLINE. 9.WHEN DEWATERING IS REQUIRED, CONTRACTOR MUST SUBMIT A DEWATERING PLAN TO THE ENGINEER FOR APPROVAL AT LEAST 10 DAYS PRIOR TO THE PROPOSED DEWATERING ACTIVITY. THE PLAN MUST INCLUDE A DEWATERING SYSTEM COMPLETE WITH SEDIMENT REMOVAL SYSTEM PRIOR TO DISCHARGE. THE DEWATERING SYSTEM MUST ENSURE THE DISCHARGE IS FREE OF SEDIMENT AND TURBID WATER. 10.ADDITIONAL EROSION AND SEDIMENT CONTROLS MAY BE ADDED DURING ANY PHASE OF CONSTRUCTION AS DIRECTED BY THE ENGINEER. 11.THE CONTRACTOR SHALL PROVIDE PERIMETER CONTROL DAY - TO - DAY AT DISTURBED, UNSTABILIZED AREAS WHERE EROSION OR SEDIMENTATION COULD BE A PROBLEM. THE ENGINEER SHALL DIRECT THE CONTRACTOR AS TO WHERE PLACEMENT OF PERIMETER CONTROL WILL BE REQUIRED. 12.THE CONTRACTOR MUST COMPLY WITH ALL NOISE AND DUST CONTROL ORDINANCES OF THE CITY. 13.MASS GRADING AREAS BEYOND PHASE 1 BOUNDARY TO BE STABILIZED ACCORDING TO EROSION CONTROL PLAN AND WITH SEED AS SHOWN IN SEEDING PLAN. PER STANDARD DETAILSINLET PROTECTION TEMPORARY EROSION AND SEDIMENT CONTROL PROVISIONS WEEKLY INSPECTION & AFTER EACH RAIN EVENT-CORRECTIVE WORK AS NECESSARY EROSION & SEDIMENT CONTROL MAINTENANCE ALSO SEE INSPECTION AND MAINTENANCE REQUIREMENTS CONTAINED IN GENERAL PROVISIONS OF SWPPP. (LESS THAN 4:1) - TYPE 1 MULCH, DISC ANCHORED. (GREATER THAN 4:1) - STABALIZED FIBER MATRIX @ 3,000 lbs/ac. IF BLANKET CANNOT BE INSTALLED WITHIN 14 DAYS. SCHEDULE ALSO SEE INSPECTION AND MAINTENANCE REQUIREMENTS CONTAINED IN GENERAL PROVISIONS OF SWPPP. PERMANENT EROSION AND SEDIMENT CONTROL PROVISIONS PERMANENT COVER - ALL OTHER DISTURBED AREAS TYPE 1 STRAW MULCH WITH DISC ANCHOR AND STATE SEED MIX 25-131 (LOW MAINTENANCE TURF GRASS STABILIZATION) @ 220 lbs/ac WITH FERTILIZER TYPE 3 (SLOW RELEASE; 22-5-10) @ 350 lbs/ac. UNLESS BLANKET IS SPECIFIED ON PLANS. OR SOD WITH FERTILIZER TYPE 3 (SLOW RELEASE; 22-5-10) @ 200 lbs/ac STORMWATER POND SLOPE EROSION CONTROL BLANKET CATEGORY 3N/2S (WOOD FIBER) WITH STATE SEED MIX 33-261 @ 35 lbs/ac. WITH TYPE 4 FERTILIZER (NATURAL BASED; 18-1-8) @ 150 lbs/ac. PERMANENT COVER - BLANKETED AREAS EROSION CONTROL BLANKET CATEGORY 3N/2S (WOOD FIBER) WITH STATE SEED MIX 35-241 @ 36.5 lbs/ac WITH TYPE 4 FERTILIZER (NATURAL BASED; 18-1-8) @ 150 lbs/ac. EROSION CONTROL BLANKET CATEGORY 3N/2S (WOOD FIBER) EROSION CONTROL BLANKET ITEM PRIOR TO CONSTRUCTION AND IMMEDIATELY AS DICTATED SILT FENCE, PERIMETER CONTROLS MnDOT SEED MIX 21-111 (SPEC 3876) 100 lbs/ac. COVER CROPS SCALE: - CG-104 TYPICAL SOG HOLD DOWN GRADE DETAIL TOWNHOME NOT TO SCALE VARIES 21'29.5' LFE LO (LOWEST UNPROTECTED OPENING) SEE PLAN FINISH GRADE DRIVE PER PLAN INTERIM GRADE GARAGE ELEVATION 1.0' HOLD DOWN TOP OF FOUNDATION 10"22' MIN. BACK OF CURB SCALE: - CG-104 TYPICAL SOG HOLD DOWN GRADE DETAIL MANOR HOME NOT TO SCALE VARIES 21'-10 1 2"11'-11 3 4" LFE LO (LOWEST UNPROTECTED OPENING) SEE PLAN FINISH GRADE DRIVE PER PLAN INTERIM GRADE GARAGE ELEVATION 1.0' HOLD DOWN TOP OF FOUNDATION 22' MIN. BACK OF CURB WEEKLY INSPECTION & AFTER EACH RAIN EVENT-CORRECTIVE WORK AS NECESSARY TEMPORARY SEDIMENT TRAP Structure Table STRUCTURE FES-1 FES-2 FES-3 FES-4 FES-5 FES-6 FES-8 OCS-1 STCB-5101 STCB-5102 STCB-5112 STCB-5113 STCB-5114 STCB-5115 STCB-5116 STCB-5117 STCB-5118 STCB-5119 STCB-5121 STCB-5122 STCB-5123 DETAILS RIM = 899.83 SUMP = ??? INV IN = 897.40 (24" CL III RCP) (SE) RIM = 907.12 SUMP = ??? INV OUT = 904.00 (24" CL III RCP) (W) RIM = 905.20 SUMP = ??? INV IN = 900.00 (24" CL III RCP) (E) RIM = 902.02 SUMP = ??? INV IN = 900.15 (18" CL V RCP) (N) RIM = 902.39 SUMP = ??? INV IN = 900.60 (18" CL V RCP) (S) RIM = 900.58 SUMP = ??? INV IN = 898.15 (24" CL III RCP) (N) RIM = 903.33 SUMP = ??? INV OUT = 901.00 (24" CL III RCP) (W) RIM = 905.00 SUMP = 896.72 INV IN = 900.90 (24" CL III RCP) (E) INV IN = 896.77 (8" PVC DRAINTILE) (E) INV OUT = 896.72 (24" CL III RCP) (S) RIM = 905.91 SUMP = 898.04 INV IN = 898.39 (24" CL III RCP) (W) INV IN = 898.79 (18" CL V RCP) (S) INV IN = 898.59 (15" CL V RCP) (E) INV OUT = 898.29 (24" CL III RCP) (N) RIM = 905.13 SUMP = 898.83 INV IN = 899.28 (18" CL V RCP) (S) INV OUT = 899.18 (24" CL III RCP) (W) INV OUT = 899.08 (24" CL III RCP) (E) RIM = 905.91 SUMP = 900.01 INV IN = 901.92 (15" CL V RCP) (W) INV IN = 900.11 (18" CL V RCP) (S) INV OUT = 900.01 (18" CL V RCP) (N) RIM = 905.95 SUMP = 902.15 INV OUT = 902.15 (15" CL V RCP) (E) RIM = 907.93 SUMP = 900.91 INV IN = 901.01 (18" CL V RCP) (S) INV IN = 902.26 (15" CL V RCP) (E) INV IN = 902.26 (15" CL V RCP) (W) INV OUT = 900.91 (18" CL V RCP) (N) RIM = 907.21 SUMP = 904.21 INV OUT = 903.31 (15" CL V RCP) (W) RIM = 907.24 SUMP = 904.24 INV OUT = 903.40 (15" CL V RCP) (E) RIM = 906.71 SUMP = 902.56 INV IN = 902.81 (15" CL V RCP) (W) INV IN = 902.93 (15" CL V RCP) (S) INV OUT = 902.56 (18" CL V RCP) (N) RIM = 906.84 SUMP = 903.24 INV OUT = 903.24 (15" CL V RCP) (N) RIM = 906.71 SUMP = 902.95 INV OUT = 902.95 (15" CL V RCP) (E) RIM = 907.38 SUMP = 900.49 INV IN = 903.37 (15" CL V RCP) (W) INV IN = 900.59 (18" CL V RCP) (S) INV IN = 902.66 (15" CL V RCP) (E) INV OUT = 900.49 (18" CL V RCP) (N) RIM = 907.63 SUMP = 902.65 INV IN = 903.10 (15" CL V RCP) (W) INV IN = 902.90 (15" CL V RCP) (S) INV OUT = 902.65 (18" CL V RCP) (N) RIM = 907.96 SUMP = 903.14 INV IN = 903.74 (15" CL V RCP) (S) INV IN = 903.24 (15" CL V RCP) (E) INV OUT = 903.14 (15" CL V RCP) (N) BUILD HEIGHT ??? ??? ??? ??? ??? ??? ??? 8.28 7.87 6.30 5.90 3.80 7.02 3.00 3.00 4.15 3.60 3.76 6.89 4.98 4.82 DESCRIPTION 24" FES 24" FES 24" FES 18" FES 18" FES 24" FES 24" FES WEST OCS 60" DIA CBMH 60" DIA CBMH 48" DIA CBMH 2'x3' CB 48" DIA CBMH 27" DIA CB 27" DIA CB 48" DIA CBMH 2'x3' CB 2'x3' CB 48" DIA CBMH 48" DIA CBMH 48" DIA MH CASTING ??? ??? ??? ??? ??? ??? ??? ??? ??? ??? ??? ??? ??? ??? R-1678-A R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V R-2510-2 R-2510-2 R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V R-1678-A Structure Table STRUCTURE STCB-5124 STCB-5125 STCB-5126 STCB-5127 STCB-5128 STCB-5130 STCB-5131 STCB-5132 STCB-5205 STCB-5206 STCB-5208 STCB-5209 STCB-5210 STCB-5214 STCB-5216 STCB-5217 STCB-5218 STCB-5220 STCB-5221 STCB-5222 STCB-5223 DETAILS RIM = 908.06 SUMP = 904.10 INV OUT = 904.10 (15" CL V RCP) (N) RIM = 909.33 SUMP = 903.74 INV IN = 903.84 (15" CL V RCP) (N) INV OUT = 903.74 (15" CL V RCP) (W) RIM = 907.80 SUMP = 904.80 INV OUT = 904.02 (15" CL V RCP) (S) RIM = 907.63 SUMP = 903.23 INV OUT = 903.23 (15" CL V RCP) (E) RIM = 907.38 SUMP = 903.58 INV OUT = 903.58 (15" CL V RCP) (E) RIM = 906.37 SUMP = 895.57 INV IN = 899.10 (15" CL V RCP) (S) INV OUT = 899.00 (15" CL V RCP) (W) RIM = 906.81 SUMP = 899.03 INV OUT = 899.22 (15" CL V RCP) (N) RIM = 906.88 SUMP = 903.88 INV OUT = 903.00 (15" CL V RCP) (W) RIM = 906.67 SUMP = 902.87 INV IN = 902.97 (15" CL V RCP) (S) INV OUT = 902.87 (15" CL V RCP) (N) RIM = 906.80 SUMP = 901.48 INV OUT = 903.10 (15" CL V RCP) (N) RIM = 907.38 SUMP = 902.08 INV IN = 902.18 (15" CL V RCP) (S) INV IN = 902.18 (15" CL V RCP) (N) INV OUT = 902.08 (15" CL V RCP) (E) RIM = 906.66 SUMP = 902.63 INV IN = 902.73 (15" CL V RCP) (W) INV OUT = 902.63 (15" CL V RCP) (S) RIM = 906.66 SUMP = 902.26 INV OUT = 902.86 (15" CL V RCP) (E) RIM = 907.97 SUMP = 903.51 INV IN = 903.61 (15" CL V RCP) (N) INV OUT = 903.51 (15" CL V RCP) (S) RIM = 908.38 SUMP = 904.10 INV IN = 904.20 (15" CL V RCP) (W) INV OUT = 904.10 (15" CL V RCP) (E) RIM = 908.89 SUMP = 904.56 INV IN = 904.66 (15" CL V RCP) (S) INV OUT = 904.56 (15" CL V RCP) (E) RIM = 908.69 SUMP = 904.79 INV OUT = 904.79 (15" CL V RCP) (N) RIM = 907.60 SUMP = 901.63 INV IN = 902.73 (15" CL V RCP) (W) INV IN = 901.73 (15" CL V RCP) (N) INV OUT = 901.63 (15" CL V RCP) (E) RIM = 907.43 SUMP = 901.69 INV IN = 903.29 (15" CL V RCP) (W) INV OUT = 903.19 (15" CL V RCP) (S) RIM = 907.35 SUMP = 901.95 INV OUT = 903.45 (15" CL V RCP) (E) RIM = 907.60 SUMP = 903.60 INV OUT = 903.60 (15" CL V RCP) (E) BUILD HEIGHT 3.96 5.59 3.00 4.40 3.80 10.80 7.78 3.00 3.80 5.32 5.30 4.03 4.40 4.46 4.28 4.33 3.90 5.97 5.74 5.40 4.00 DESCRIPTION 2'x3' CB 48" DIA CBMH 27" DIA CB 2'x3' CB 2'x3' CB 48" DIA CBMH 2'x3' CB 27" DIA CB 2'x3' CB 2'x3' CB 48" DIA CBMH 48" DIA CBMH 2'x3' CB 48" DIA CBMH FUT 2'x3' CB 48" DIA CBMH 2'x3' CB 48" DIA CBMH 48" DIA CBMH 2'x3' CB 2'x3' CB CASTING R-3067 V R-3067 V R-2510-2 R-3067 V R-3067 V R-3067 V R-3067 V R-2510-2 R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V R-3067 V Structure Table STRUCTURE STCB-5225 STCB-5226 STCB-5227 STCB-5315 STCB-5316 STCB-5601 STCB-5602 STMH-5100 STMH-5201 STMH-5204 STMH-5211 STMH-5215 STMH-5301 STMH-5501 STMH-5502 STMH-5503 STMH-5504 STUB-5102 STUB-5201 DETAILS RIM = 908.86 SUMP = 904.03 INV IN = 904.13 (15" CL V RCP) (W) INV OUT = 904.03 (15" CL V RCP) (N) RIM = 908.86 SUMP = 904.29 INV IN = 904.39 (15" CL V RCP) (W) INV OUT = 904.29 (15" CL V RCP) (E) RIM = 907.70 SUMP = 904.70 INV OUT = 904.54 (15" CL V RCP) (E) RIM = 908.32 SUMP = 904.33 INV IN = 904.43 (15" CL V RCP) (E) INV OUT = 904.33 (15" CL V RCP) (W) RIM = 908.65 SUMP = 904.85 INV OUT = 904.85 (15" CL V RCP) (W) RIM = 905.19 SUMP = 901.24 INV IN = 901.34 (15" CL V RCP) (W) INV OUT = 901.24 (15" CL V RCP) (S) RIM = 905.19 SUMP = 901.50 INV OUT = 901.50 (15" CL V RCP) (E) RIM = 905.12 SUMP = 897.72 INV IN = 898.07 (24" CL III RCP) (S) INV OUT = 897.97 (24" CL III RCP) (NW) RIM = 907.98 SUMP = 900.81 INV IN = 903.80 (15" CL V RCP) (S) INV IN = 901.06 (15" CL V RCP) (W) INV OUT = 900.81 (18" CL V RCP) (N) RIM = 907.82 SUMP = 901.81 INV IN = 901.91 (15" CL V RCP) (W) INV IN = 902.75 (15" CL V RCP) (S) INV OUT = 901.81 (15" CL V RCP) (E) RIM = 907.88 SUMP = 900.40 INV IN = 902.39 (15" CL V RCP) (N) INV IN = 900.72 (15" CL V RCP) (W) INV OUT = 900.47 (18" CL V RCP) (S) RIM = 908.48 SUMP = 900.62 INV IN = 900.62 (15" CL V RCP) (N) INV IN = 903.97 (15" CL V RCP) (W) INV OUT = 903.87 (15" CL V RCP) (S) RIM = 906.34 SUMP = 898.35 INV IN = 902.57 (18" CL V RCP) (N) INV IN = 899.10 (18" CL V RCP) (W) INV OUT = 898.60 (24" CL III RCP) (S) RIM = 906.22 SUMP = 895.62 INV IN = 895.72 (24" CL III RCP) (N) INV OUT = 895.62 (24" CL III RCP) (S) RIM = 904.48 SUMP = 894.86 INV IN = 894.96 (24" CL III RCP) (N) INV OUT = 894.86 (24" CL III RCP) (S) RIM = 903.98 SUMP = 894.61 INV IN = 894.71 (24" CL III RCP) (N) INV OUT = 894.61 (24" CL III RCP) (S) RIM = 902.45 SUMP = 894.28 INV IN = 894.38 (24" CL III RCP) (N) INV OUT = 894.28 (24" CL III RCP) (S) RIM = 902.06 SUMP = ??? INV IN = 899.60 (24" CL III RCP) (E) INV OUT = 899.60 (24" CL III RCP) (W) RIM = 905.38 SUMP = ??? INV IN = 903.86 (15" CL V RCP) (S) INV OUT = 903.86 (15" CL V RCP) (N) BUILD HEIGHT 4.82 4.57 3.00 3.99 3.80 3.95 3.69 7.40 7.17 6.01 7.49 7.85 7.99 10.60 9.62 9.37 8.17 ??? ??? DESCRIPTION 48" DIA CBMH 48" DIA CBMH 27" DIA CB FUT 2'x3' CB 2'x3' CB 2'x3' CB 2'x3' CB 48" DIA MH 48" DIA MH 48" DIA MH 48" DIA MH 48" DIA MH 60" DIA MH 48" DIA MH 48" DIA MH 48" DIA MH 48" DIA MH 24" PLUG 15" PLUG CASTING R-3067 V R-3067 V R-2510-2 R-3067 V R-3067 V R-3067 V R-1678-A R-1678-A R-1678-A R-1678-A R-1678-A R-1678-A R-1678-A R-2510-2 R-2510-2 R-2510-2 ??? ??? ??? ???K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STRM-TABL-PH1-PLAN.dwg 9/23/2022 10:53:44 AMSTORM SEWER STRUCTURE TABLE CG-105 AS SHOWN LCW KWHLCW/SJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709 OUTLET CONTROL STRUCTURE 1 PLACE LOW SIDE OF STRUCTURE TOWARDS POND FLOW DIRECTION FLOW DIRECTIO N NOT TO SCALE TOP OF WEIR ELEVATION SEE WEIR DETAIL STEPS 16" O.C. STEPS 16" O.C. VARYING L x H x 9" CONCRETE WALL CENTERED ON MANHOLE DRILL & GROUT REBAR IN BASE AND WALL OF MANHOLE 3 1/2" MIN. MnDOT 4011 G CONCRETE BASE SLABCOMPACTED SUBGRADE 12" AGGREGATE BASE, CLASS 5 (INCIDENTAL) TBD" DIA. PRECAST STRUCTURE 12" EPOXY COATED BARS @ 9" O.C. EW. CONCRETE FILL INVERT ELEVATION 900.9 INVERT ELEVATION 896.7 RIM ELEVATION 905.0 NOTE THAT THE RIM ELEVATION LISTED IN THE PLANS IS FOR THE LOW SIDE OF THE CASTING 24" DIA. INLET PIPE 24" DIA. 902 OUTLET CONTROL STRUCTURE 1 WEIR DETAIL NOT TO SCALE OUTLET PIPE 8" DRAINTILE PIPE 5.0'5.00'AQUANOX SLUICE GATE - MODEL S-22F SQUARE NUT OPERATOR W/NON-RISING STEM OR APPROVED EQUIVALENT. 12" ORIFICE WITH SLUICE GATE WIDTH VARIES SLOPES 1 : 4 M A X I M U M EROSION CONTROL BLANKET - CAT 25-N SEE PLANTING PLAN HWL - 906.1 NWL - 904.0 BOTTOM - 900 NOTES: 1. BENDS AND RISER TO BE SAME SIZE AS DRAINTILE PLANT BEDDING DRAIN TILE FINISHED GRADE CASTING ASSEMBLY NEENAH R-1976 (INCIDENTAL) CAPPED WITH SCREW IN PLUG WITH RAISED 2" SQUARE TOP FOR REMOVAL 4" PVC SCHED. 40 VARIESK:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GENL-PH 1-DETL.dwg 9/23/2022 10:53:58 AMCG-106 AS SHOWN SJP KWHLCW/SJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709POND DETAILS SCALE: 1 CG106 OUTLET CONTROL STRUCTURE-1 (OCS) NOT TO SCALE SCALE: 2 CG106 WET BASIN DETAIL-EAST POND NOT TO SCALE SCALE: 4 CG106 DRAINTILE CLEANOUT DETAIL NOT TO SCALESCALE: 3 CG106 POND WITH A FILTRATION BENCH DETAIL-WEST POND NOT TO SCALE 8" PERFORATED DRAINTILE (NO SOCK, MUST BE SLOTTED, .25" MAX WIDTH) - ELEVATION AND VERTICAL POSITION WITHIN ROCK TRENCH VARY ALONG LENGTH OF DRAINTILE 18" FILTER MEDIA SPECIAL 70% SAND (ASTM C-33 COARSE WASH SAND) 30% COMPOST (MNDOT 3890.2B, GRADE 2 LEAF LITTER) SLOP E S 1: 4 M A XI M U M SEE PLANTING PLAN EROSION CONTROL BLANKET - TYPE 3N BOTTOM OF BENCH - 900.00 BOTTOM - 895.0 3' TYPICAL 12" TYPICAL NOTE: CONTRACTOR SHALL PROVIDE A POST CONSTRUCTION TEST ON THE BIOFILTRATION BENCH. TEST SHALL BE CONDUCTED BY FILLING BASIN WITH WATER TO A DEPTH OF 6" OVER THE BENCH AND MONITORING THE TIME NECESSARY TO DRAIN. THE ENGINEER SHALL BE NOTIFIED NO LESS THAN 3 DAYS PRIOR TO THE TEST TO WITNESS THE RESULTS. 18" MINIMUM 8" SOLID PVC OUTLET CONTROL STRUCTURE SEE 1/CG106 HWL - 903.9 NWL - 900.0 FILTRATION BENCH ITEMS WITHIN DASHED LINE INDICATE SAND FILTER AND DRAINTILE TO BE CONSTRUCTED FOLLOWING FINAL PHASE BUILD-OUT. PRESSURE TREATED 2"x12" WOOD PLANKING ALONG LENGTH OF BENCH ADJACENT TO POND SIDE SLOPE COARSE FILTER AGGREGATE (MnDOT 3149.2H) CONTRACTOR TO EXCAVATE TO BOTTOM OF SAND FILTER. ACCUMULATED SEDIMENT TO BE EXCAVATED TO BOTTOM OF SAND LAYER AND DRAINTILE TRENCHES FOLLOWING FINAL PHASE BUILD-OUT. ELEV: 898.50 COUNTY ROAD D EAST50'PETROLEUMEASEMENTohohohohohohohohohohohXXX|||||||||||petropetropetropetropetroCCCCCFFFFF8" DIPohohohohohohohohohohohXXX|||||||||||petropetropetropetropetroCCCCCFFFFF8" DIPBL 9142536BL 14123BL 121324BL 1512BL 131216+0010+00 11+00 12+00 13+00 14+00SS>>>>>>>>>>>>>>>>|||||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>STCB-5217 STCB-5222 STCB-5218 STCB-5316 STCB-5221 STCB-5223 STCB-522015" CL V RCP15" CL V RCP15" CL V RCP 15" CL V RCP15" CL V RCP15" CL V RCPBEGIN CONSTRUCTION STA: 10+21.34 |895 900 905 910 915 920 925 895 900 905 910 915 920 925 10+00 906.96907.710+50 907.82908.311+00 907.71909.311+50 907.66908.912+00 908.48909.012+50 909.04908.613+00 908.72908.213+50 908.17908.214+00 907.94908.114+20 STCB-5221RIM: 907.43STA 11+77.86, 13.33' LT48" DIA CBMHINV: 903.29 (W)INV: 903.19 (S)- R-3067244' - 15" CL V RCP @ 0.60%PVIS: 10+24.08PVIE: 906.45PVIS: 10+24.42PVIE: 906.44PVIS: 10+50.00PVIE: 906.96HP: 11+19.34EL: 907.89HP: 13+05.22EL: 909.052.51% -1.00%2.23% -1.10% 2.00% PVIS: 11+00 PVIE: 908.21 AD: -3.51% K: 25.66 90.00' VC PVIS: 12+90 PVIE: 909.38 AD: -3.33% K: 27.00 90.00' VCBVCS: 10+55BVCE: 907.08BVCS: 12+45BVCE: 908.38EVCS: 11+45EVCE: 907.76EVCS: 13+35EVCE: 908.88LP: 11+77.86EL: 907.57PVIS: 11+95 PVIE: 907.26 AD: 3.23% K: 27.86 90.00' VC BVCS: 11+50BVCE: 907.71EVCS: 12+40EVCE: 908.26K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STST-PH1-PLAN.dwg 9/23/2022 10:54:35 AMCG-107 AS SHOWN SJH JMSSJHNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 VANDERBIE STREET (28.0' BC-BC 60' RIGHT-OF-WAY)MATCHLINE STA -SEE SHEET -14+20CG-108SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 1STREET 1MATCHLINE STA - SEE SHEET - 15+50 CG-115 MATCHLINE STA - SEE SHEET - 16+60 CG-115 FUTURE PHASE FUTURE PHASE ohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohBL 2112BL 2512345BL 34123456BL 3620+0021+0014+00 15+00 16+00 17+00 18+00SS>>>>>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>STCB-5223 STCB-5220 STMH-5204 STCB-5208 STCB-5206 STCB-5205 STCB-5131 STCB-5209 STCB-5210 STCB-5130 FES-3 15" CL V RCP15" CL V RCP15" CL V RCP 15" CL V RCP15" CL V RCP15" CL V RCP15" CL V RCP24" CL III RCP15" CL V RCP 15" CL V RCP>>>>>>>>>>>>>>>>>>>>15" CL V RCP 37+0037+37|||||||||||895 900 905 910 915 920 925 895 900 905 910 915 920 925 908.05908.114+10 907.61908.214+50 907.12908.115+00 906.99908.515+50 907.24908.516+00 907.54909.316+50 907.84908.617+00 908.14909.117+50 908.44908.918+00 908.74909.318+50 908.92909.318+80 STCB-5220RIM: 907.60STA 14+21.94, 13.33' LT48" DIA CBMHINV: 902.73 (W)INV: 901.73 (N)INV: 901.63 (E)- R-3067STCB-5209RIM: 906.66STA 15+39.46, 13.33' LT48" DIA CBMHINV: 902.73 (W)INV: 902.63 (S)- R-306775' - 15" CL V RCP @ 0.60% STCB-5208RIM: 907.38STA 16+14.51, 13.33' LT48" DIA CBMHINV: 902.18 (S)INV: 902.18 (N)INV: 902.08 (E)- R-306724" CL III RCP INV: 901.48 0.60%-1.10% 309' - 15" CL V RCP @ 0.60%LP: 15+39.46EL: 906.98PVIS: 15+24.68 PVIE: 906.79 AD: 1.70% K: 58.73 100.00' VC BVCS: 14+74.68BVCE: 907.34EVCS: 15+74.68EVCE: 907.09K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STST-PH1-PLAN.dwg 9/23/2022 10:54:48 AMSTREET & STORM PLAN AND PROFILE CG-108 AS SHOWN SJH JMSSJHNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 VANDERBIE STREET (28.0' BC-BC 60' RIGHT-OF-WAY)- MATCHLINE STA- SEE SHEET14+20CG-107MATCHLINE STA -SEE SHEET -18+80CG-109SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 2STREET 2MATCHLINE STA - SEE SHEET - 20+00 CG-114 MATCHLINE STA - SEE SHEET - 21+50 CG-114 FUTURE PHASE C C C C C C C C C C C C C C oh oh oh oh oh oh oh ohohohohohohohohoh ohohoh oh oh oh ohC C C C C C C C C C C C C C oh oh oh oh oh oh oh ohohohohohohohohoh ohohoh oh oh oh oh56BL 29123456BL 33123456BL 3BL 361215+0015+6019+00 20+00 21+00 22+00 23+00SS>>>>>>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||||>>>>STCB-5125 15" CL V RCP>>>>>>STCB-5225 15" CL V RCPSTCB-5226 15" CL V RCPSTCB-5227 15" CL V R C P STCB-5126 ||||||895 900 905 910 915 920 925 895 900 905 910 915 920 925 908.92909.318+80 909.04909.319+00 909.34909.319+50 909.64909.320+00 909.94909.520+50 910.24909.621+00 910.48909.521+50 910.16909.122+00 909.19908.922+50 908.09908.423+00 907.00907.323+50 0.60% -2.19%HP: 21+51.50EL: 910.48PVIS: 21+80 PVIE: 910.72 AD: -2.79% K: 35.85 100.00' VC BVCS: 21+30BVCE: 910.42EVCS: 22+30EVCE: 909.62STCB-5225RIM: 908.86STA 19+23.50, 13.33' LT48" DIA CBMHINV: 904.13 (W)INV: 904.03 (N)- R-3067K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STST-PH1-PLAN.dwg 9/23/2022 10:54:57 AMSTREET & STORM PLAN AND PROFILE CG-109 AS SHOWN SJH JMSSJHNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 VANDERBIE STREET (28.0' BC-BC 60' RIGHT-OF-WAY)MATCHLINE STA -SEE SHEET -18+80CG-108SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 4- MATCHLINE STA- SEE SHEET23+50CG-110MATCHLINE STA - SEE SHEET - 14+70 CG-113 >>>>>>>>>>>>>>||||||||||||||||||C C C C 8" VCPohohohohoh>>>>S>>>>>>>>>>D|CCCCCCFFFFFF6" WM12" RCP| | | | | |RIM: 905.14INV: 887.54 EINV: 887.54 WINV: 887.64 SINV: 894.64 SINV: 887.74 NINV: 892.64 Noh oh oh oh oh oh oh oh >>>>>>>>>>>>>>||||||||||||||||||C C C C 8" VCPohohohohoh>>>>S>>>>>>>>>>D|CCCCCCFFFFFF6" WM12" RCP| | | | | |RIM: 905.14INV: 887.54 EINV: 887.54 WINV: 887.64 SINV: 894.64 SINV: 887.74 NINV: 892.64 Noh oh oh oh oh oh oh oh 24+00 24+68S>>>>> ||||||||ST>>>>>>>>>>>>>>>>>>>>>>BL 33123456BL 3212345615+00 16+00 16+81 14+0015+00SS>>>>>>>>>>>>>>>>||||||||||||||||||||||>>>>>>>>>>STCB-5127 STCB-5122 STCB-5124STCB-5123 15" CL V RCP15" CL V RCP 15" CL V RCP|||885 890 895 900 905 910 915 920 925 885 890 895 900 905 910 915 920 925 907.00907.323+50 905.90906.224+00 905.00905.024+50 25+00 -2.19% -1.81%PVIS: 24+00.00PVIE: 905.90PVIS: 24+52.69PVIE: 904.95-2.19% -1.81%PVIS: 24+00.00PVIE: 905.90PVIS: 24+52.69PVIE: 904.95895 900 905 910 915 920 925 930 895 900 905 910 915 920 925 930 907.88907.114+50 908.12906.615+00 908.44906.515+50 908.76905.916+00 909.08905.516+50 17+00 40' - 15" CL V RCP @ 0.60% 51' - 15" CL V RCP @ 0.70% STCB-5124RIM: 908.06STA 15+29.67, 10.54' LT2'X3' CBINV: 904.10 (N)- R-30670.64%PVIS: 14+89.74PVIE: 908.05PVIS: 16+75.64PVIE: 909.24EVCS: 14+85EVCE: 908.02STCB-5123RIM: 907.96STA 14+78.34, 10.54' LT48" DIA MHINV: 903.74 (S)INV: 903.24 (E)INV: 903.14 (N)- R-1678-AK:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STST-PH1-PLAN.dwg 9/23/2022 10:55:15 AMSTREET & STORM PLAN AND PROFILE CG-110 AS SHOWN SJH JMSSJHNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 VANDERBIE STREET (28.0' BC-BC 60' RIGHT-OF-WAY)- MATCHLINE STA- SEE SHEET23+50CG-109SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709ALLEN AVENUESTREET H (24.0' BC-BC PRIVATE DRIVE)MATCHLINE STA -SEE SHEET -14+50CG-111- MATCHLINE STA - SEE SHEET 15+00 CG-113 STREET 4STREET 4- MATCHLINE STA - SEE SHEET 13+25 CG-113 BL 2015263748BL 2415263748BL 28142536BL 2112BL 25123456BL 29123456BL 310+00 11+00 12+00 13+00 14+00 19+0020+00SS>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>9+80 10+00 STCB-5127 STCB-5122STCB-5121 STCB-5128 STCB-5101 STMH-5100 24" CL III RCP 24" CL III RCP15" CL V RCP18" CL V RCP 15" CL V RCP18" CL V RCP15" CL V RCP>>||||||STCB-5115 BL-STREET H 895 900 905 910 915 920 906.09908.210+00 907.03908.210+50 907.71908.311+00 908.37908.211+50 908.75908.012+00 908.81908.012+50 908.57907.813+00 908.27907.513+50 907.97907.414+00 907.88907.114+50 BL-STREET H_EXTENSION 895 900 905 910 915 920 905.37908.19+80 906.09908.210+00 106' - 18" CL V RCP @ 1.61% STCB-5121RIM: 907.38STA 10+94.17, 10.54' LT48" DIA CBMHINV: 903.37 (W)INV: 900.59 (S)INV: 902.66 (E)INV: 900.49 (N)- R-3067344' - 18" CL V RCP @ 0.60% STCB-5122RIM: 907.63STA 14+38.55, 10.54' LT48" DIA CBMHINV: 903.10 (W)INV: 902.90 (S)INV: 902.65 (N)- R-3067STCB-5101RIM: 905.91STA 19+65.01, 11.54' LT60" DIA CBMHINV: 898.39 (W)INV: 898.79 (S)INV: 898.59 (E)INV: 898.29 (N)- R-3067-0.60% 2.00% 1.36%PVIS: 10+00.00PVIE: 906.09PVIS: 10+40.00PVIE: 906.89HP: 12+34.17EL: 908.83PVIS: 12+05 PVIE: 909.14 AD: -1.96% K: 76.39 150.00' VC BVCS: 11+30BVCE: 908.12EVCS: 12+80EVCE: 908.69LP: 14+38.55EL: 907.87PVIS: 14+40 PVIE: 907.73 AD: 1.24% K: 72.58 90.00' VC BVCS: 13+95BVCE: 908.00-0.60% 2.00% 1.36%PVIS: 10+00.00PVIE: 906.09PVIS: 10+40.00PVIE: 906.89HP: 12+34.17EL: 908.83PVIS: 12+05 PVIE: 909.14 AD: -1.96% K: 76.39 150.00' VC BVCS: 11+30BVCE: 908.12EVCS: 12+80EVCE: 908.69LP: 14+38.55EL: 907.87PVIS: 14+40 PVIE: 907.73 AD: 1.24% K: 72.58 90.00' VC BVCS: 13+95BVCE: 908.00K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STST-PH1-PLAN.dwg 9/23/2022 10:55:28 AMSTREET & STORM PLAN AND PROFILE CG-111 AS SHOWN SJH JMSSJHNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET H (24.0' BC-BC PRIVATE DRIVE)MATCHLINE STA -SEE SHEET -14+50CG-110SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 2STREET 2- MATCHLINE STA - SEE SHEET 20+40 CG-114 - MATCHLINE STA - SEE SHEET 18+65 CG-114 BL 2015263748BL 2415263748BL 28142536BL 32BL 3BL 3BL 1915263748BL 2315263748BL 2714253610+00 11+00 12+00 13+00 14+00 14+90 18+0019+0012+0013+00SSS>>>>>>>>>>>>>>>>>>>>>>>>>|||||||||||||||||||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>9+80 10+00 14+9015+00 15+20 STCB-5118 STCB-5119 STCB-5117STCB-5112 STCB-5113 STCB-5102 15" CL V RCP24" CL III RCP18" CL V RCP 15" CL V RCP18" CL V RCP 15" CL V RCP >>>>>>>>>>>>>>>>>>>>|||||||15" CL V RCP18" CL V RCP 15" CL V RCPSTCB-5115 STCB-5116 STCB-5114 905.40908.510+00 906.40908.410+50 907.40908.611+00 908.06908.411+50 908.28908.812+00 908.09908.412+50 907.79907.913+00 907.49907.213+50 907.19906.114+00 906.98905.314+50 15+00 895 900 905 910 915 920 925 895 900 905 910 915 920 925 905.28908.59+80 905.40908.510+00 14+50 906.92905.015+00 908.51904.915+20 STCB-5102RIM: 905.13STA 18+26.56, 11.54' LT60" DIA CBMHINV: 899.28 (S)INV: 899.18 (W)INV: 899.08 (E)- R-306752' - 15" CL V RCP @ 0.60% STCB-5117RIM: 906.71STA 14+50.00, 11.54' LT48" DIA CBMHINV: 902.81 (W)INV: 902.93 (S)INV: 902.56 (N)- R-3067279' - 18" CL V RCP @ 0.56% 49' - 18" CL V RCP @ 1.49% STCB-5118RIM: 906.84STA 13+00.98, 11.54' RT2'X3' CBINV: 903.24 (N)- R-3067-0.60%0.60% 2.00% 2.02%HP: 12+00.69EL: 908.28BVCS: 10+85BVCE: 907.11EVCS: 12+35EVCE: 908.18-0.60%0.60% 2.00% 2.02%PVIS: 10+00.00PVIE: 905.40PVIS: 14+89.74PVIE: 907.13PVIS: 10+40.00PVIE: 906.20HP: 12+00.69EL: 908.28PVIS: 11+60 PVIE: 908.63 AD: -2.62% K: 57.18 150.00' VC BVCS: 10+85BVCE: 907.11EVCS: 12+35EVCE: 908.18LP: 14+50.00 EL: 906.98 PVIS: 14+50 PVIE: 906.89 AD: 1.20% K: 50.00 60.00' VC BVCS: 14+20BVCE: 907.07EVCS: 14+80EVCE: 907.07134' - 18" CL V RCP @ 0.60% STCB-5114RIM: 907.93STA 11+71.15, 11.54' LT48" DIA CBMHINV: 901.01 (S)INV: 902.26 (E)INV: 902.26 (W)INV: 900.91 (N)- R-3067STCB-5112RIM: 905.91STA 10+37.59, 11.54' LT48" DIA CBMHINV: 901.92 (W)INV: 900.11 (S)INV: 900.01 (N)- R-3067K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STST-PH1-PLAN.dwg 9/23/2022 10:55:44 AMSTREET & STORM PLAN AND PROFILE CG-112 AS SHOWN SJH JMSSJHNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET G (26.0' BC-BC PRIVATE DRIVE) SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 2STREET 2- MATCHLINE STA - SEE SHEET 19+00 CG-114 - MATCHLINE STA - SEE SHEET 17+50 CG-114 MATCHLINE STA - SEE SHEET - 12+30 CG-113 STREET 4MATCHLINE STA - SEE SHEET - 13+75 CG-113 FUTURE ADDITION CCCCCCCohohohohohohohohohCCCCCCCohohohohohohohohoh6 BL 33 1 2 3 BL 32 1 2 3 BL 3 BL 3 BL 31 1 2 3 4 14+9015+0016+0012+00 13+00 14+00 15+00 15+6021+0022+00SSS>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||||||>>>>>>>>>>>>>>STCB-5125 STCB-5127 STCB-5122 STCB-5124 STCB-5123 STCB-5118 STCB-5119 STCB-511715" CL V RCP 15" CL V RCP 15" CL V RCP15" CL V RCP15" CL V RCP15" CL V RCP BEGIN CONSTRUCTION STA: 12+45.35 >>15" CL V RCPSTCB-5126 ||||||||| 890 895 900 905 910 915 920 925 890 895 900 905 910 915 920 925 907.74903.112+00 907.34904.312+50 907.11905.113+00 907.32905.513+50 907.75906.214+00 908.42907.114+50 909.34908.015+00 910.28909.115+50 15+80PVIS: 15+59.93PVIE: 910.47BVCS: 12+56BVCE: 907.29BVCS: 13+78.92BVCE: 907.55EVCS: 13+46EVCE: 907.29EVCS: 14+68.92EVCE: 908.76-0.80%0.80% 1.88% LP: 13+01.08 EL: 907.11 STCB-5118RIM: 906.84STA 13+00.98, 11.54' RT2'X3' CBINV: 903.24 (N)- R-3067PVIS: 13+01 PVIE: 906.93 AD: 1.60% K: 56.35 90.00' VC PVIS: 14+23.92 PVIE: 907.91 AD: 1.08% K: 83.05 90.00' VC STCB-5123RIM: 907.96STA 14+78.34, 10.54' LT48" DIA MHINV: 903.74 (S)INV: 903.24 (E)INV: 903.14 (N)- R-1678-A83' - 15" CL V RCP @ 0.60% STCB-5125RIM: 909.33STA 15+17.46, 12.90' LT48" DIA CBMHINV: 903.84 (N)INV: 903.74 (W)- R-3067K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STST-PH1-PLAN.dwg 9/23/2022 10:55:57 AMSTREET & STORM PLAN AND PROFILE CG-113 AS SHOWN SJH JMSSJH N SCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET 4 (26.0' BC-BC PRIVATE DRIVE) SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET HSTREET GMATCHLINE STA - SEE SHEET - 14+50 CG-111 MATCHLINE STA - SEE SHEET - 14+50 CG-112 STREET HMATCHLINE STA - SEE SHEET - 16+00 CG-110 MATCHLINE STA - SEE SHEET - 22+50 CG-109 MATCHLINE STA - SEE SHEET - 20+80 CG-109 VANDERBIE STREETFUTURE PHASE oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh BL 20 1 5 2 6 BL 21 1 2 BL 19 1 5 2 6 BL 34 1 2 310+0011+0010+0011+0018+00 19+00 20+00 21+00 22+0016+0017+00S SS >>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>9+8010+009+8010+00STMH-5204STCB-5208 STCB-5121STCB-5128 STCB-5206 STCB-5205 STCB-5131 STCB-5130 STCB-5112STCB-5113 STCB-5101STCB-5102 STMH-5100 FES-1 24" CL III RCP24" CL I I I RCP 15" CL V RCP 24" CL III RCP 18" CL V RCP15" CL V RCP18" CL V RCP15" CL V RCP 15" CL V RCP15" CL V RCP 15" CL V RCP15" CL V RCP15" CL V RCP15" CL V RCP END CONSTRUCTION STA: 21+43.10 BEGIN CONSTRUCTION STA: 17+64.89 >>>>>>>>>>>>>>>>>>>>|||||||||||||18" CL V RCP895 900 905 910 915 920 925 895 900 905 910 915 920 925 905.73908.617+50 905.44908.618+00 905.43908.318+50 905.73908.219+00 906.07908.219+50 906.41907.720+00 906.79908.420+50 907.41909.221+00 907.23908.621+50 907.77908.522+00BVCS: 17+84.37BVCE: 905.52EVCS: 18+74.37EVCE: 905.56-0.60% -1.25%1.08% 0.68% 1.94%PVIS: 21+31.00PVIE: 907.02PVIS: 20+47.00PVIE: 906.73PVIS: 20+89.16PVIE: 907.55LP: 18+26.56 EL: 905.39 PVIS: 18+29.37 PVIE: 905.25 AD: 1.28% K: 70.31 90.00' VC STCB-5102RIM: 905.13STA 18+26.56, 11.54' LT60" DIA CBMHINV: 899.28 (S)INV: 899.18 (W)INV: 899.08 (E)- R-3067138' - 24" CL III RCP @ 0.50% STCB-5101RIM: 905.91STA 19+65.01, 11.54' LT60" DIA CBMHINV: 898.39 (W)INV: 898.79 (S)INV: 898.59 (E)INV: 898.29 (N)- R-306782' - 15" CL V RCP @ 0.50% STCB-5130RIM: 906.37STA 20+46.68, 12.90' LT48" DIA CBMHINV: 899.10 (S)INV: 899.00 (W)- R-306772' - 24" CL III RCP @ -0.58% 15" CL V RCP INV: 903.0415" CL V RCP INV: 902.40 K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STST-PH1-PLAN.dwg 9/23/2022 10:56:09 AMSTREET & STORM PLAN AND PROFILE CG-114 AS SHOWN SJH JMSSJH N SCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET 2 (26.0' BC-BC PRIVATE DRIVE) SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET HSTREET GSTREET HMATCHLINE STA - SEE SHEET - 11+00 CG-112 STREET HSTREET GVANDERBIE STREETMATCHLINE STA - SEE SHEET - 11+00 CG-111 MATCHLINE STA - SEE SHEET - 17+50 CG-108 MATCHLINE STA - SEE SHEET - 15+70 CG-108 FUTURE PHASE FUTURE PHASE 2 5 3 6 2 5 3 6 BL 12 1 3 2 4 BL 15 1 3 2 4 15+00 16+00 17+0013+0014+00S>>>>>>>>>>>|||||||||||||||||>>>>>>>>>>>>>>>>>>>>>> STCB-5217 STCB-5218 STCB-5316 15" CL V RCP 15" CL V RCP15" CL V RCP15" CL V RCP END CONSTRUCTION STA: 16+60.74BEGIN CONSTRUCTION STA: 15+52.81 |895 900 905 910 915 920 895 900 905 910 915 920 908.32908.514+50 908.61908.215+00 908.90908.415+50 909.19908.416+00 908.97908.016+50 908.57908.417+00 908.19908.417+50 0.58%-0.80%1.00%PVIS: 16+13.02PVIE: 909.27PVIS: 17+48.94PVIE: 908.180.58%1.00%PVIS: 16+13.02PVIE: 909.27PVIS: 17+48.94PVIE: 908.18STCB-5217RIM: 908.89STA 16+48.32, 12.91' LT48" DIA CBMHINV: 904.66 (S)INV: 904.56 (E)- R-306772' 15" CL V RCP @ 0.50%70' - 15" CL V RCP @ 0.60% STCB-5316RIM: 908.65STA 15+64.28, 13.03' LT2'X3' CBINV: 904.85 (W)- R-306715" CL V RCP INV: 902.38 K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-STST-PH1-PLAN.dwg 9/23/2022 10:56:23 AMSTREET & STORM PLAN AND PROFILE CG-115 AS SHOWN SJH JMSSJH N SCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET 1 (26.0' BC-BC PRIVATE DRIVE) SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709FUTURE PHASEVANDERBIE STREETFUTURE PHASE MATCHLINE STA - SEE SHEET - 12+20 CG-107 MATCHLINE STA - SEE SHEET - 14+00 CG-107 COUNTY ROAD D EAST50'PETROLEUMEASEMENTohohohohohohohohohohohXXX|||||||||||petropetropetropetropetroCCCCCFFFFF8" DIPohohohohohohohohohohohXXX|||||||||||petropetropetropetropetroCCCCCFFFFF8" DIPBL 9142536BL 14123BL 121324BL 1512BL 131216+0010+00 11+00 12+00 13+00 14+00SS>>>>>>>>>>>>>>>>|||||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>8" PVC 8" DIP |ohohohohohohohohohohohXXX|||||||||||petropetropetropetropetroCCCCCFFFFF8" DIP>>>||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>|||||||||||||||||||||||||||||||||||||||||||||||||||||||||SANMH-6 SAN-STUB-2 SAN-STUB-1 SANMH-7 HYD-1 HYDRANT W/ 6" VALVE (SALVAGED) W-4 HYD-2 STUB-2 STUB-1 W-2 W-1 CS-1 CS-2 CS-7 CS-8 CS-3 CS-4 CS-5 CS-9 CS-12 CS-10 CS-11 CS-13 CS-6 895 900 905 910 915 920 895 900 905 910 915 920 10+00 906.96907.710+50 907.82908.311+00 907.71909.311+50 907.66908.912+00 908.48909.012+50 909.04908.613+00 908.72908.213+50 908.17908.214+00 907.94908.114+20 SANMH-6RIM: 909.04STA 13+11.88, 0.00'TYPE: 48" DIA.INV: 896.26 (W)INV: 896.26 (E)INV: 896.26 (N)INV: 896.26 (S)-SANMH-7RIM: 907.83STA 11+02.43, 0.00'TYPE: 48" DIA.INV: 899.17 (S)-186' - 8" DIP WMN K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 11:06:13 AMCU-101 AS SHOWN SJH/LCW KWHSJH/LCWNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 VANDERBIE STREET (28.0' BC-BC 60' RIGHT-OF-WAY)MATCHLINE STA -SEE SHEET -14+20CU-102SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 1STREET 1 ohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohBL 2112BL 2512345BL 34123456BL 3620+0021+0014+00 15+00 16+00 17+00 18+00SS>>>>>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>>>8" PVC >>>>>>>>>>>>>>>>>>>>|||||||||||ohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohohSANMH-4SANMH-5 SAN-STUB-3 HYD-3 W-27 W-10 W-9 W-11 STUB-4 CS-11 CS-13 W-26 895 900 905 910 915 920 907.94908.114+20 907.61908.214+50 907.12908.115+00 906.99908.515+50 907.24908.516+00 907.54909.316+50 907.84908.617+00 908.14909.117+50 908.44908.918+00 908.74909.318+50 SANMH-5RIM: 907.22STA 14+87.04, 0.00' LTTYPE: 48" DIA.INV: 895.57 (N)INV: 895.57 (S)-SANMH-4RIM: 907.55STA 16+50.97, 0.00'TYPE: 48" DIA.INV: 894.91 (N)INV: 894.92 (E)INV: 894.92 (S)-164' - 8" PVC SSWR @ 0.40% 301' - 8" PVC SSWR @ 0.40% 356' - 8" DIP WMN24" CL III RCP INV: 901.48 K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 11:06:38 AMSTREET UTILITY PLAN AND PROFILE CU-102 AS SHOWN SJH/LCW KWHSJH/LCWNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 VANDERBIE STREET (28.0' BC-BC 60' RIGHT-OF-WAY)- MATCHLINE STA- SEE SHEET14+20CU-101MATCHLINE STA -SEE SHEET -18+80CU-103SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 2STREET 2MATCHLINE STA - SEE SHEET - 20+00 CU-108 C C C C C C C C C C C C C C oh oh oh oh oh oh oh ohohohohohohohohoh ohohoh oh oh oh ohC C C C C C C C C C C C C C oh oh oh oh oh oh oh ohohohohohohohohoh ohohoh oh oh oh oh56BL 29123456BL 33123456BL 3BL 361215+0015+6019+00 20+00 21+00 22+00 23+00SS>>>>>>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||||>>>>>>>>>>||||||C C C C C C C C C C C C C C oh oh oh oh oh oh oh ohohohohohohohohoh ohohoh oh oh oh ohSS RM SS RM SS RM>>>>>>>>>|||||>>>>|||||||||||||||SANMH-2 SANMH-3 HYD-5 W-34 W-36 W-33 W-35HYD-4 W-28 CS-14 CS-15 CS-16 CS-17 895 900 905 910 915 920 895 900 905 910 915 920 908.92909.318+80 909.04909.319+00 909.34909.319+50 909.64909.320+00 909.94909.520+50 910.24909.621+00 910.48909.521+50 910.16909.122+00 909.19908.922+50 908.09908.423+00 907.00907.323+50 SANMH-3RIM: 909.35STA 19+52.20, 0.00' LTTYPE: 48" DIA.INV: 893.72 (N)INV: 893.72 (S)-SANMH-2RIM: 910.47STA 21+40.71, 0.00'TYPE: 48" DIA.INV: 892.97 (N)INV: 892.95 (W)INV: 892.97 (S)-189' - 8" PVC SSWR @ 0.40% 327' - 8" PVC SSWR @ 0.40% 509' - 8" DIP WMN K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 11:06:52 AMSTREET UTILITY PLAN AND PROFILE CU-103 AS SHOWN SJH/LCW KWHSJH/LCWNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 VANDERBIE STREET (28.0' BC-BC 60' RIGHT-OF-WAY)MATCHLINE STA -SEE SHEET -18+80CU-102SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 4- MATCHLINE STA- SEE SHEET23+50CU-104MATCHLINE STA - SEE SHEET - 14+70 CU-107 >>>>>>>>>>>>>>>>|||||||||||||||||||||C C C C 6" WM8" VCPohohohohoh>>>>S>>>>>>>>>>D|CCCCCCFFFFFF6" WM12" RCP| | | | | |RIM: 905.14INV: 887.54 EINV: 887.54 WINV: 887.64 SINV: 894.64 SINV: 887.74 NINV: 892.64 Noh oh oh oh oh oh oh oh >>>>>>>>>>>>>>>>|||||||||||||||||||||C C C C 6" WM8" VCPohohohohoh>>>>S>>>>>>>>>>D|CCCCCCFFFFFF6" WM12" RCP| | | | | |RIM: 905.14INV: 887.54 EINV: 887.54 WINV: 887.64 SINV: 894.64 SINV: 887.74 NINV: 892.64 Noh oh oh oh oh oh oh oh 24+00 24+68 S>>>>> ||||||||ST>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>|||||||||||||||||||||C C C C 6" WM8" VCPohohohohoh>>>>S>>>>>>>>>>D|CCCCCCFFFFFF6" WM12" RCP| | | | | |RIM: 905.14INV: 887.54 EINV: 887.54 WINV: 887.64 SINV: 894.64 SINV: 887.74 NINV: 892.64 Noh oh oh oh oh oh oh oh EX. SANMH-1 HYD-6 W-37 W-38 W-39 >>>>XXXXXXXXXXBL 33123456BL 3212345615+00 16+00 16+81 14+0015+00SS>>>>>>>>>>>>>>>>||||||||||||||||||||||>>>>>>>>>>||||||||XXXXX>>>>>>>>>>>>>>||||||||||||||||||||||||||SANMH-14 SANMH-11 HYD-10W-22 W-24 W-21 CS-50CS-49CS-48 CS-56 CS-55 CS-54 CS-51 CS-52 CS-53 CS-45 CS-46 CS-47 W-41 885 890 895 900 905 910 915 885 890 895 900 905 910 915 907.00907.323+50 905.90906.224+00 905.00905.024+50 25+00 EX. SANMH-1RIM: 904.85STA 24+67.6, 0.0'TYPE: 48" DIA.32' - 8" DIP WMN 327' - 8" PVC SSWR @ 0.40% 895 900 905 910 915 920 895 900 905 910 915 920 907.88907.114+50 908.10906.615+00 908.44906.515+50 908.76905.916+00 909.08905.516+50 908.58905.316+80 SANMH-11RIM: 908.03STA 21+38.87, 136.00' RTTYPE: 48" DIA.INV: 895.00 (W)INV: 895.00 (N)INV: 895.00 (S)INV: 895.00 (E)-SANMH-14RIM: 909.21STA 23+20.67, 136.00' RTTYPE: 48" DIA.INV: 901.21 (N)-182' - 8" PVC S S W R @ 3 . 4 2 % 244' - 8" DIP WMN K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 11:07:17 AMSTREET UTILITY PLAN AND PROFILE CU-104 AS SHOWN SJH/LCW KWHSJH/LCWNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 VANDERBIE STREET (28.0' BC-BC 60' RIGHT-OF-WAY)- MATCHLINE STA- SEE SHEET23+50CU-103SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709ALLEN AVENUESTREET H (24.0' BC-BC PRIVATE DRIVE)MATCHLINE STA -SEE SHEET -14+50CU-105- MATCHLINE STA - SEE SHEET 15+00 CU-107 STREET 4STREET 4- MATCHLINE STA - SEE SHEET 13+00 CU-107 BL 2015263748BL 2415263748BL 28142536BL 2112BL 25123456BL 29123456BL 310+00 11+00 12+00 13+00 14+00 19+0020+00SS>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>9+80 10+00 >>||||||>>>>>>>>>>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||SANMH-12 SANMH-13 W-25 W-12 CS-20 CS-22 CS-23 CS-21 CS-26 CS-24 CS-25 CS-27 CS-28 CS-33CS-32 CS-30 CS-29 CS-31 CS-34 CS-35 CS-36 CS-38 CS-37 CS-40 CS-39 CS-43CS-42 CS-44 CS-41 BL-STREET H 895 900 905 910 915 920 906.09908.210+00 907.03908.210+50 907.71908.311+00 908.37908.211+50 908.75908.012+00 908.81908.012+50 908.57907.813+00 908.27907.513+50 907.97907.414+00 907.88907.114+50 BL-STREET H_EXTENSION 895 900 905 910 915 920 SANMH-13RIM: 908.60STA 19+43.61, 136.00' RTTYPE: 48" DIA.INV: 897.63 (N)INV: 897.53 (S)-SANMH-12RIM: 906.69STA 16+79.13, 136.00' RTTYPE: 48" DIA.INV: 898.69 (S)-905.37908.19+80 906.09908.210+00 195' - 8" PVC SSWR @ 1.30% 434' - 8" DIP WMN 264' - 8" PVC SSWR @ 0.40%K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 10:58:14 AMSTREET UTILITY PLAN AND PROFILE CU-105 AS SHOWN SJH/LCW KWHSJH/LCWNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET H (24.0' BC-BC PRIVATE DRIVE)MATCHLINE STA -SEE SHEET -14+50CU-104SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 2STREET 2- MATCHLINE STA - SEE SHEET 20+50 CU-108 - MATCHLINE STA - SEE SHEET 18+50 CU-108 BL 2015263748BL 2415263748BL 28142536BL 32BL 3BL 3BL 1915263748BL 2315263748BL 2714253610+00 11+00 12+00 13+00 14+00 14+90 18+0019+0012+0013+00SSS>>>>>>>>>>>>>>>>>>>>>>>>>|||||||||||||||||||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>9+80 10+00 14+9015+00 15+20 >>>>>>>>>>>>>>>>>>>>|||||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||||||||||||||||||||||||>>SANMH-10 SANMH-9SANMH-8 SAN-STUB-4 HYD-9 W-19 W-20 W-17 HYD-7 HYD-8 W-23 W-16 STUB-3 W-15 W-13 W-14 CS-64 CS-60 CS-61 CS-62 CS-65 CS-66 CS-67 CS-63 CS-68 CS-72 CS-69 CS-73 CS-74 CS-70 CS-71 CS-75 CS-76 CS-79 CS-80 CS-77 CS-78 CS-81 CS-82 BL-STREET G 905.34908.510+00 906.31908.410+50 907.29908.611+00 908.12908.411+50 907.88908.812+00 906.95908.412+50 906.17907.913+00 906.24907.213+50 906.72906.114+00 907.19905.314+50 15+00 BL-STREET G_EXTENSION 895 900 905 910 915 920 BL-STREET G_EXTENSION 2 895 900 905 910 915 920 SANMH-8RIM: 906.00STA 16+77.30, 273.00' RTTYPE: 48" DIA.INV: 898.00 (S)-SANMH-9RIM: 907.81STA 19+43.61, 273.00' RTTYPE: 48" DIA.INV: 896.93 (N)INV: 896.83 (S)-905.28908.59+80 905.40908.510+00 14+50 906.92905.015+00 908.51904.915+20 SANMH-10RIM: 907.13STA 21+37.02, 273.00' RTTYPE: 48" DIA.INV: 895.55 (N)INV: 895.61 (W)INV: 895.55 (E)-266' - 8" PVC SSWR @ 0.40% 193' - 8" PVC SSWR @ 0.66% 504' - 8" DIP WMN K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 10:58:32 AMSTREET UTILITY PLAN AND PROFILE CU-106 AS SHOWN SJH/LCW KWHSJH/LCWNSCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET G (26.0' BC-BC PRIVATE DRIVE) SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET 2STREET 2- MATCHLINE STA - SEE SHEET 19+00 CU-108 MATCHLINE STA - SEE SHEET - 14+00 CU-107 CCCCCCCohohohohohohohohohCCCCCCCohohohohohohohohoh6 BL 33 1 2 3 BL 32 1 2 3 BL 3 BL 3 BL 31 1 2 3 4 14+9015+0016+0012+00 13+00 14+00 15+00 15+6021+0022+00SSS>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||||||>>>>>>>>>>>>>>14+9015+0015+20>>||||||||| |||||CCCCCCCohohohohohohohohohSS RM>>>>> > > >>>>>>>>>||||| | |||||||||||||||>>||||||||||SANMH-2SANMH-11 SANMH-10 SAN-STUB-4 HYD-5 W-34 W-36 W-33 W-35 W-22 W-24 W-21 HYD-9 W-19 W-20 W-18 W-17 CS-51 CS-52 CS-53 CS-45 CS-46 CS-47 CS-15 CS-78CS-81 CS-82 CS-44 CS-41 BL-STREET 4 890 895 900 905 910 915 890 895 900 905 910 915 908.00903.112+00 907.75904.312+50 907.51905.113+00 907.80905.513+50 908.10906.214+00 908.64907.114+50 909.38908.015+00 910.12909.115+50 15+80 SANMH-11RIM: 908.03STA 21+38.87, 136.00' RTTYPE: 48" DIA.INV: 895.00 (W)INV: 895.00 (N)INV: 895.00 (S)INV: 895.00 (E)-SANMH-2RIM: 910.47STA 21+40.71, 0.00'TYPE: 48" DIA.INV: 892.97 (N)INV: 892.95 (W)INV: 892.97 (S)-SANMH-10RIM: 907.13STA 21+37.02, 273.00' RTTYPE: 48" DIA.INV: 895.55 (N)INV: 895.61 (W)INV: 895.55 (E)-15" CL V RCP INV: 903.17 52' - 8" PVC SSWR @ 0.40%137' - 8" PVC SSWR @ 0.40% 136' - 8" PVC SSWR @ 1.51% 176' - 8" DIP WMN K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 10:58:47 AMSTREET UTILITY PLAN AND PROFILE CU-107 AS SHOWN SJH/LCW KWHSJH/LCW N SCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET 4 (26.0' BC-BC PRIVATE DRIVE) SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET HSTREET GMATCHLINE STA - SEE SHEET - 14+30 CU-105 MATCHLINE STA - SEE SHEET - 14+30 CU-106 STREET HMATCHLINE STA - SEE SHEET - 20+80 CU-103 MATCHLINE STA - SEE SHEET - 22+60 CU-103 oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh BL 20 1 5 2 6 BL 21 1 2 BL 19 1 5 2 6 BL 34 1 2 310+0011+0010+0011+0018+00 19+00 20+00 21+0016+0017+00S SS >>>>>>>>>>>>>>>||||||||||||||||||||||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>9+8010+009+8010+00>>>>>>>>>>>>>>>>>>>>||||||||||||| oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh > >>>>>>>>> >> | ||||||||| |||||||||SANMH-4 SANMH-12 SANMH-8 SAN-STUB-3 HYD-3 W-27 W-10 W-9 W-11 HYD-7 STUB-4 W-25W-12 W-16 STUB-3 W-15 W-13 W-14 W-26 CS-64 CS-60 CS-61CS-65 CS-20 CS-22 CS-23 CS-21 CS-24 895 900 905 910 915 920 895 900 905 910 915 920 905.79908.617+50 905.45908.618+00 905.42908.318+50 905.83908.219+00 906.24908.219+50 906.65907.720+00 907.08908.420+50 907.45909.221+00 906.71908.621+50 907.50908.522+00 SANMH-4RIM: 907.55STA 16+50.97, 0.00'TYPE: 48" DIA.INV: 894.91 (N)INV: 894.92 (E)INV: 894.92 (S)-15" CL V RCP INV: 902.40 15" CL V RCP INV: 903.04 64' - 8" PVC SSWR @ 2 . 2 5 % 324' - 8" DIP WMN K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 10:59:02 AMSTREET UTILITY PLAN AND PROFILE CU-108 AS SHOWN SJH/LCW KWHSJH/LCW N SCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET 2 (26.0' BC-BC PRIVATE DRIVE) SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709STREET HSTREET GSTREET HMATCHLINE STA - SEE SHEET - 15+60 CU-102 - MATCHLINE STA - SEE SHEET 17+50 CU-102 - MATCHLINE STA - SEE SHEET 11+00 CU-105 - MATCHLINE STA - SEE SHEET 11+00 CU-106 2 5 3 6 2 5 3 6 BL 12 1 3 2 4 BL 15 1 3 2 4 15+00 16+00 17+0013+0014+00S>>>>>>>>>>>|||||||||||||||||>>>>>>>>>>>>>>>>>>>>>>8" PVC|>>>>>>>>>>>>||||||||||||||||||||| ||| ||| SANMH-6 SAN-STUB-2SAN-STUB-1 W-4 HYD-2 STUB-2STUB-1 CS-5 CS-9 CS-12 CS-10 895 900 905 910 915 920 895 900 905 910 915 920 908.61908.215+00 908.90908.415+50 909.15908.416+00 908.97908.016+50 908.57908.417+00 SANMH-6RIM: 909.04STA 13+11.88, 0.00'TYPE: 48" DIA.INV: 896.26 (W)INV: 896.26 (E)INV: 896.26 (N)INV: 896.26 (S)-15" CL V RCP INV: 902.38 66' - 8" PVC SSWR @ 2.00%66' - 8" PVC SSWR @ 2.00% 79' - 8" DIP WMN K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 10:59:17 AMSTREET UTILITY PLAN AND PROFILE CU-109 AS SHOWN SJH/LCW KWHSJH/LCW N SCALE IN FEET 0 H: 20 40 SCALE IN FEET 0 V: 5 10 STREET 1 (26.0' BC-BC PRIVATE DRIVE) SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709FUTURE PHASEVANDERBIE STREETFUTURE PHASE - MATCHLINE STA - SEE SHEET 14+00 CU-102 - MATCHLINE STA - SEE SHEET 12+10 CU-101 K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-UTIL-PH 1-PLAN.dwg 9/23/2022 10:59:19 AMWATER AND SANITARY SEWER STRUCTURE TABLE CU-110 AS SHOWN SJH/LCW KWHSJH/LCW SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709ADD PHASE 1 WATER & SANITARY NETWORK TABLE VANDERBIE STREETVANDERBIE STREET50' PETROLEUM EASEMENT DESOTO STREEToh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh oh XXXXXXXXXXX MB >>>>>>>>>>>>>>>>S S S S S S >>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D D D D D D |||||||||||||||||||||||| | | | ||||||||||||||||||||||N00°56'17"W 1100.00S89°58'02"E 552.22 S00°47'50"E 1193.27S89°33'17"W 270.00N00°47'47"W 95.56N89°57'54"W 279.49 N00°47'50"W 1054.11S89°58'02"E 117.75 S00°49'52"E 254.13S89°58'02"E 151.02 S00°49'52"E 800.00ALLEN AVENUE 60 33TRUNK H I G H W A Y 3 5 E - 6 9 4 33 33 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED) PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN C C C C C C F F F F F F CCCCEX. CB RIM: 907.28 INV: 894.98 N INV: 894.98 E INV: 902.88 S EX. CB RIM: 906.42 INV: 903.42 NEX. STMH RIM: 903.34 INV: 900.44 W EX. CB RIM: 901.60 INV: 896.50 E (30") INV: 896.50 W (30") EX. CB RIM: 897.78 INV: 893.38 E (30") INV: 893.38 W (30") INV: 894.58 N (12") INV: 893.38 S (12") PIPELINE EASEMENT PER DOC. NO. 426628 6" DIP (PLAN)16" DIP (PLAN)8" DIP (P L A N ) 8" DIP 8" DIP 36" STORMSTORM15" RCP STORM 15" RCP STORM36" RCP 8" DIP COUNTY R O A D D E A S T 12" RCP12" RCP12" RCP 8" VCP 12" RCP 8" VCP STORMohohohohohX>>>>S S S D N89°57'56"W 269.39 60 3333C F EX. CB RIM: 904.26 INV: 899.56 E (30") INV: 899.46 W (30") EX. STMH RIM: 904.91 INV: 899.41 E (30") INV: 899.41 W (30") INV: 899.51 N (18") 6" WM 6" WM RIM: 907.55 INV: 893.55 S 8" VCP12" RCP15" RCPSTORMEX. CB RIM: 897.81 INV: 897.41 N (12") INV: 894.41 S (12") ALLEN AVENUE RIM: 905.14 ohohEX. CB RIM: 904.40 30" STORM 30" STORM 30" STORM 30" STORM 30" STORM STORMWATER POND oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh oh XXXXXXXXXXX MB >>>>>>>>>>>>>>>>S S S S S S >>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D D D D D D |||||||||||||||||||||||| | | | ||||||||||||||||||||||N00°56'17"W 1100.00S89°58'02"E 552.22 S00°47'50"E 1193.27S89°33'17"W 270.00N00°47'47"W 95.56N89°57'54"W 279.49 N00°47'50"W 1054.11S89°58'02"E 117.75 S00°49'52"E 254.13S89°58'02"E 151.02 S00°49'52"E 800.00ALLEN AVENUE 60 33TRUNK H I G H W A Y 3 5 E - 6 9 4 33 33 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED) PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN C C C C C C F F F F F F CCCCEX. CB RIM: 907.28 INV: 894.98 N INV: 894.98 E INV: 902.88 S EX. CB RIM: 906.42 INV: 903.42 NEX. STMH RIM: 903.34 INV: 900.44 W EX. CB RIM: 901.60 INV: 896.50 E (30") INV: 896.50 W (30") EX. CB RIM: 897.78 INV: 893.38 E (30") INV: 893.38 W (30") INV: 894.58 N (12") INV: 893.38 S (12") PIPELINE EASEMENT PER DOC. NO. 426628 6" DIP (PLAN)16" DIP (PLAN)8" DIP (P L A N ) 8" DIP 8" DIP 36" STORMSTORM15" RCP STORM 15" RCP STORM36" RCP 8" DIP COUNTY R O A D D E A S T 12" RCP12" RCP12" RCP 8" VCP 12" RCP 8" VCP STORMohohohohohX>>>>S S S D N89°57'56"W 269.39 60 3333C F EX. CB RIM: 904.26 INV: 899.56 E (30") INV: 899.46 W (30") EX. STMH RIM: 904.91 INV: 899.41 E (30") INV: 899.41 W (30") INV: 899.51 N (18") 6" WM 6" WM RIM: 907.55 INV: 893.55 S 8" VCP12" RCP15" RCPSTORMEX. CB RIM: 897.81 INV: 897.41 N (12") INV: 894.41 S (12") ALLEN AVENUE RIM: 905.14 ohohEX. CB RIM: 904.40 30" STORM 30" STORM 30" STORM 30" STORM 30" STORMSTREET HSTREET HSTREET GSTREET 2 STREET 2 STREET 4 STREET 1 STREET 1 STORMWATER POND NWL=900.0 HWL=903.9 MATCH LINE L103 MATCH LINE L104 PHASE 1 LIMITS PHASE 1 LIMITS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-LNSCP-PH 1-PLAN.dwg 9/23/2022 10:59:42 AMLS-101 AS SHOWN AM AMKT N SCALE IN FEET 0 H: 80 160 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709OVERALL LANDSCAPE PLAN DECIDUOUS BOTANICAL / COMMON NAME CONT QTY ARS Acer rubrum 'Franksred' TM / Red Sunset Maple 2" Cal B&B 18 CO Celtis occidentalis / Common Hackberry 2" Cal B&B 13 GI Gleditsia triacanthos inermis 'Skycole' TM / Skyline Honey Locust 2" Cal B&B 11 PT Populus tremuloides / Quaking Aspen 2" Cal B&B 8 QSW Quercus bicolor / Swamp White Oak 2" Cal B&B 14 EVERGREEN TREES BOTANICAL / COMMON NAME CONT QTY AB Abies balsamea / Balsam Fir 6` HT B&B 5 PBH Picea glauca densata / Black Hills Spruce 6` HT B&B 2 ORN. TREE BOTANICAL / COMMON NAME CONT QTY AG Amelanchier x grandiflora 'Autumn Brilliance' / Autumn Brilliance Apple Serviceberry 6` HT B&B 9 SR Syringa reticulata / Japanese Tree Lilac 1.5" Cal B&B 12 SHRUBS BOTANICAL / COMMON NAME SIZE QTY AR Amelanchier alnifolia 'Regent' / Regent Serviceberry 2 gal 95 BLC Aronia melanocarpa / Black Chokeberry 2 gal 24 AH Hydrangea arborescens 'Annabelle' / Annabelle Hydrangea 2 gal 30 HLL Hydrangea paniculata 'Jane' TM / Little Lime Panicle Hydrangea 2 gal 103 AJ Juniperus horizontalis 'Andorra' / Andorra Juniper 2 gal 30 GMC Ribes alpinum 'Green Mound' / Green Mound Alpine Currant 2 gal 36 AW Spiraea x bumalda 'Anthony Waterer' / Anthony Waterer Spirea 2 gal 42 NFS Spiraea x bumalda 'Neon Flash' / Neon Flash Spirea 2 gal 40 TAY Taxus x media 'Tauntonii' / Taunton's Anglo-Japanese Yew 2 gal 30 TEA Thuja occidentalis 'Techny Globe' / Techny Globe Arborvitae 2 gal 47 TR Thuja occidentalis `Rheingold` / Rheingold Arborvitae 2 gal 45 CAV Viburnum trilobum `Compactum` / Compact American Cranberrybush 2 gal 27 PERENNIALS BOTANICAL / COMMON NAME SIZE QTY PVG Geranium x 'Philippe Vapelle' / Philippe Vapelle Cranesbill #1 CONT.108 RSD Hemerocallis x 'Ruby Stella' / Ruby Stella Daylily #1 CONT.50 SD Hemerocallis x 'Stella de Oro' / Stella de Oro Daylily #1 CONT.56 HWF Hosta x `Frances Williams` / Frances Williams Hosta #1 CONT.56 PHASE 1 PLANT SCHEDULE PLANTING NOTES 1.VERIFY WITH THE PROJECT MANAGER AND UTILITY COMPANIES THE LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO START. REPAIR ALL DAMAGES TO EXISTING UTILITIES, CURBS, PAVEMENTS AND STRUCTURES WHICH OCCUR DURING THE CONSTRUCTION OF THE PROJECT OR AS A RESULT OF THE CONTRACTOR'S ACTIVITIES, AT NO ADDITIONAL COST TO THE OWNER. 2.SAFEGUARD ALL BUILDING SURFACES, EQUIPMENT AND FURNISHINGS. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE OR INJURY TO PERSONS OR PROPERTY WHICH MAY OCCUR AS A RESULT OF NEGLIGENCE IN THE EXECUTION OF WORK. 3.COORDINATE WITH ARCHITECTURE/ENGINEERING PLANS TO BECOME THOROUGHLY FAMILIAR WITH GRADING, SURFACE AND UNDERGROUND CONDITIONS AND UTILITIES. 4.ALL GRADES, DIMENSIONS AND EXISTING CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR ON-SITE BEFORE CONSTRUCTION BEGINS. BRING ANY DISCREPANCIES TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE PRIOR TO COMMENCING WORK. 5.ENSURE THAT THE LANDSCAPING WORK DOES NOT INTERRUPT ESTABLISHED OR PROPOSED DRAINAGE PATTERNS. OBTAIN APPROVAL ON THE FINAL GRADE BY THE OWNER'S REPRESENTATIVE PRIOR TO COMMENCING PLANTING OPERATIONS. FINISH GRADE BEFORE MULCHING SHALL BE +/- 3" BELOW FINISH SURFACE OF ADJACENT PAVING. 6.FINE GRADE AND SLOPE ALL LANDSCAPED AREAS TO A MINIMUM OF 2.0% TO DRAIN. POSITIVELY NO SETTLEMENT, EROSION, SEDIMENTATION OR OFF-PROPERTYDRAINAGE NUISANCE SHALL BE ACCEPTED. 7.ALL FILL MATERIAL FOR BACKFILLING TRENCHES OR EXCAVATIONS SHALL BE FREE-DRAINING, GRANULAR MATERIAL APPROVED BY THE OWNER'S REPRESENTATIVE. THE GRANULAR MATERIAL SHALL BE LEFT A MINIMUM OF 12" BELOW FINISH GRADE. 8.PROVIDE TOPSOIL THAT IS LOOSE, FRIABLE AND SHALL CONTAIN AN ORDINARY AMOUNT OF ORGANIC MATTER. IT SHALL CONTAIN NO LUMPS OF SOIL OR ROCKS LARGER THAN 1". IT SHALL BE SUFFICIENTLY FERTILE TO SUSTAIN NORMAL, HEALTHY PLAN GROWTH. PROVIDE A MINIMUM OF 4" OF TOPSOIL IN ALL LAWN AREAS. 9.TEST THE TOPSOIL AFTER ROUGH GRADING IS COMPLETE TO DETERMINE THE SOIL AMENDMENTS REQUIRED IN ORDER TO PROVIDE A GROWING MEDIUM AS DESCRIBED. SUBMIT A COPY OF ANALYSIS AND RECOMMENDATIONS TO THE OWNER'S REPRESENTATIVE FOR APPROVAL. 10.UTILIZE A PLANTING MIX OF TWO (2) PARTS TOPSOIL, ONE (1) PART AGED COMPOST, AND ONE (1) PART SAND IN ALL PLANTING BEDS FROM 12" BELOW FINISHED GRADE TO FINISHED GRADE. 11.COORDINATE WITH OTHER CONTRACTORS, AS NECESSARY, REGARDING LOCATION AND TIMING OF INSTALLATION OF PLANT MATERIALS. 12.PLANT MATERIALS SHALL BE FURNISHED IN THE QUANTITIES AND/OR SPACING AS SHOWN OR NOTED. IN CASE OF DISCREPANCIES BETWEEN THE PLAN AND THE PLANT SCHEDULE, THE PLAN SHALL DICTATE. 13.PLANT MATERIALS ARE DRAWN AT OR NEAR THEIR MATURE SIZE. UTILIZE THE CENTER POINT OF THE SYMBOL TO DETERMINE PROPER PLANT LAYOUT AND PLACEMENT. 14.LAYOUT PLANT LOCATIONS AND PLANTING BED EDGES AND OBTAIN APPROVAL BY THE OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. 15.ALL PLANTS ARE TO MEET OR EXCEED 'AMERICAN STANDARDS FOR NURSERY STOCK,' CURRENT EDITION, BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION. ALL PLANTS SHALL BE NURSERY-GROWN UNLESS OTHERWISE NOTED. 16.PLACE ALUMINUM EDGING (3 16" x 5-1/2", MILLED ALUMINUM, BLACK COLOR), TO BE PLACED BETWEEN LANDSCAPE BEDS AND LAWNS AS INDICATED ON THE DRAWINGS. 17.PLACE TYPAR 3301 WEED FABRIC IN ALL PLANTING BEDS. 18.PLANT FERTILIZER SHALL BE AGRIFORM (21 GRAM), 20-10-5 BY WEIGHT, APPLIED AT THE RATE RECOMMENDED BY SOIL TESTING AND SUITED TO THE SPECIFIED PLANTS. 19.PROVIDE 1-1/2" MINUS ROCK MULCH, 3" MINIMUM DEPTH FOR PLANTING BEDS. PROVIDE SOURCE AND SAMPLE FOR APPROVAL BY THE OWNER'S REPRESENTATIVE. 20.TREES LOCATED IN GRASS AREAS TO HAVE BARK MULCH RINGS AS PER DETAILS. 21.STAKE AND GUY ALL TREES IMMEDIATELY AFTER PLANTING. THE STABILITY AND PLUMB CONDITIONS OF ALL PLANT STOCK IS THE RESPONSIBILITY OF THE CONTRACTOR THROUGH THE WARRANTY PERIOD AND THE CONTRACTOR IS LIABLE FOR ANY DAMAGE CAUSED BY INSTABILITY OF ANY PLANT MATERIALS. 22.COORDINATE THE PLANTING WITH IRRIGATION SYSTEM LAYOUT. THE OWNER IS NOT RESPONSIBLE FOR DAMAGE CAUSED BY OTHER TRADES WHILE COMPLETING THIS WORK. 23.ALL SUBSTITUTIONS AND PLAN CHANGES MUST BE APPROVED BY THE LANDSCAPE ARCHITECT. NO SUBSTITUTIONS SHALL BE MADE WITHOUT WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE. 24.ANY WORK OR MATERIAL WHICH IN THE OPINION OF THE OWNER'S REPRESENTATIVE DOES NOT MEET THE REQUIREMENTS OF THE PLANS AND SPECIFICATIONS WILL BE CAUSE FOR REJECTION. ALL REJECTED WORK AND MATERIALS SHALL BE IMMEDIATELY REMOVED, DISPOSED AND REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 25.BEGIN MAINTENANCE AFTER EACH PLANT HAS BEEN INSTALLED AND CONTINUE UNTIL FINAL ACCEPTANCE BY THE OWNER'S REPRESENTATIVE. MAINTENANCE INCLUDES WATERING, PRUNING, WEEDING, MULCHING, REPLACEMENT OF SICK OR DEAD PLANTS AND ANY OTHER CARE NECESSARY FOR THE PROPER GROWTH OF PLANT STOCK. 26.DURING THE COURSE OF THIS WORK, REMOVE EXCESS WASTE MATERIAL DAILY FROM THE SITE AND UPON COMPLETION OF ALL WORK. 27.UPON COMPLETION OF ALL LANDSCAPING, A SUBSTANTIAL COMPLETION WALK-THROUGH OF THE WORK WILL BE HELD. THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE FOR SCHEDULING THE WALK-THROUGH AT LEAST SEVEN (7) DAYS PRIOR O THE ANTICIPATED DATE. 28.WARRANTY ALL PLANT STOCK AND WORKMANSHIP FOR 12 MONTHS FROM THE DATE OF FINAL ACCEPTANCE. REPLACEMENT PLANTS SHALL BE WARRANTED FOR AN ADDITIONAL 90 DAYS. 29.THE CONTRACTOR SHALL NOT BE RESPONSIBLE AT ANY TIME TO REPLACE OR HONOR ANY WARRANTY FOR THE LOSS OF ANY TREES, PLANTS, GROUND COVERS OR SOD CAUSED BY FIRE, FLOODS, LIGHTNING, WINDS ABOVE 70 MILES PER HOUR OR ANY OTHER NATURAL DISASTER, NOR SHALL THE CONTRACTOR BE HELD RESPONSIBLE FOR ACTS OF VANDALISM OR NEGLIGENCE ON THE PART OF THE OWNER. 30.PROVIDE TO THE OWNER'S REPRESENTATIVE A WRITTEN ANNUAL MAINTENANCE PROGRAM TO PROPERLY CARE FOR AND MAINTAIN THE LANDSCAPING. INCLUDE CONTACT INFORMATION REGARDING THE INSTALLERS AND SUPPLIERS OF THE MATERIALS ALONG WITH A WARRANTY CERTIFICATE. 31.SAFELY PRUNE AND PROTECT ALL LIMBS AND ROOT MASS OF EXISTING TREES TAGGED 'TO REMAIN'. 32.IRRIGATION SYSTEM: ALL PLANTING AREAS SHALL RECEIVE 100% DRIP IRRIGATION COVERAGE. ALL TURF AREAS TO RECEIVE 100% SPRAY HEAD COVERAGE. WATER SUPPLY, IRRIGATION CONTROLLER AND BACKFLOW PREVENTER SHALL BE LOCATED IN AND APPROVED LOCATION. IT IS THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO DESIGN, LAYOUT, COORDINATE, CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL PROVIDE TO THE OWNER ALL NECESSARY TRAINING, SHOP DRAWINGS, FIRST SEASON SET-UP AND WINTERIZATION TO THE IRRIGATION SYSTEM. 50' PETROLEUM EASEMENT oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohoh oh oh oh oh XXX X X X X X X X X X X X X X X X X X MB >>>>>>S S S >>>>>>>>>>>>>>>>D D D |||||||||||||||||||| | | | |||||||||||||||||||||||N00°56'17"W 1100.00S89°58'02"E 552.22 S00°47'50"E 1193.27N00°47'50"W 1054.11S00°49'52"E 254.13S89°58'02"E 151.02 S00°49'52"E 800.0060 TRUNK H I G H W A Y 3 5 E - 6 9 4 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED) PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN p e t r o C C C C C C C C C C C C F F F F F F F F F F F F F EX. CB RIM: 907.28 INV: 894.98 N INV: 894.98 E INV: 902.88 S EX. CB RIM: 906.42 INV: 903.42 N EX. STMH RIM: 903.34 INV: 900.44 W PIPELINE EASEMENT PER DOC. NO. 426628 6" DIP (PLAN)16" DIP (PLAN)8" DIP 15" RCP STORM 15" RCP STORM36" RCP COUNTY R O A D D E A S T 8" VCP15" RCPSTORM||STORMWATER POND oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohoh oh oh oh oh XXX X X X X X X X X X X X X X X X X X MB >>>>>>S S S >>>>>>>>>>>>>>>>D D D |||||||||||||||||||| | | | |||||||||||||||||||||||N00°56'17"W 1100.00S89°58'02"E 552.22 S00°47'50"E 1193.27N00°47'50"W 1054.11S00°49'52"E 254.13S89°58'02"E 151.02 S00°49'52"E 800.0060 TRUNK H I G H W A Y 3 5 E - 6 9 4 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 PIPELINE (FIELD LOCATED) PIPELINE (PLAN) PIPELINE ( P L A N ) PIPELINE (PLAN) FIBER OPTIC SIGN p e t r o C C C C C C C C C C C C F F F F F F F F F F F F F EX. CB RIM: 907.28 INV: 894.98 N INV: 894.98 E INV: 902.88 S EX. CB RIM: 906.42 INV: 903.42 N EX. STMH RIM: 903.34 INV: 900.44 W PIPELINE EASEMENT PER DOC. NO. 426628 6" DIP (PLAN)16" DIP (PLAN)8" DIP 15" RCP STORM 15" RCP STORM36" RCP COUNTY R O A D D E A S T 8" VCP15" RCPSTORM||VANDERBIE STREETSTREET 2 STREET 2 STREET 1 STREET 1 STORMWATER POND NWL=900.0 HWL=903.9 MATCH LINE L103 MATCH LINE L104 PHASE 1 LIMITS 3 AR 3 CAV 1 AW 5 RSD 3 AJ 3 AH SHRUB, SEE DETAIL DECIDUOUS TREE, SEE DETAIL METAL EDGING AND MULCH, SEE DETAIL 3 LS-109 2 LS-109 5 LS-109 ONLY PLANTINGS INSIDE OF PHASE 1 LINE ARE TO BE PLANTED IN PHASE 1 BENCH, SEE SITE PLAN TYP. 8 HLL 5 HLL 3 AR 2 SR 2 AG 2 AG 1 AG 2 ARS 3 QSW 2 GI 2 GI 6 SR 2 SR 6 AR 9 HLL 7 HLL 3 AR 12 HLL HLL 3 HLL 3 AR 7 AR 1 AG 12 HLL 6 AR 1 AG 1 CO 2 ARS 1 CO 2 SR 2 AG 2 ARS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-LNSCP-PH 1-PLAN.dwg 9/23/2022 10:59:51 AMLS-102 AS SHOWN AM AMKT N SCALE IN FEET 0 H: 40 80 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709ENLARGED LANDSCAPE PLAN-NORTH oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh XXXX>>>>>>>>>>>>>>>>D D |||||||||||||N00°56'17"W 1100.00S00°47'50"E 1193.27S89°33'17"W 270.00N00°47'47"W 95.56N89°57'54"W 279.49 S00°49'52"E 800.0033 33 33 17 CCCCCCCCEX. CB RIM: 901.60 INV: 896.50 E (30") INV: 896.50 W (30") EX. CB RIM: 897.78 INV: 893.38 E (30") INV: 893.38 W (30") INV: 894.58 N (12") INV: 893.38 S (12") 8" DIP 36" STORMSTORMohohohohohohohohoh ohohoh XXX>>S N89°57'56"W 269.39 60 EX. STMH RIM: 904.91 INV: 899.41 E (30") INV: 899.41 W (30") INV: 899.51 N (18") RIM: 907.55 INV: 893.55 S EX. CB RIM: 897.81 INV: 897.41 N (12") INV: 894.41 S (12")||||ohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh XXXX>>>>>>>>>>>>>>>>D D |||||||||||||N00°56'17"W 1100.00S00°47'50"E 1193.27S89°33'17"W 270.00N00°47'47"W 95.56N89°57'54"W 279.49 S00°49'52"E 800.0033 33 33 17 CCCCCCCCEX. CB RIM: 901.60 INV: 896.50 E (30") INV: 896.50 W (30") EX. CB RIM: 897.78 INV: 893.38 E (30") INV: 893.38 W (30") INV: 894.58 N (12") INV: 893.38 S (12") 8" DIP 36" STORMSTORMohohohohohohohohoh ohohoh XXX>>S N89°57'56"W 269.39 60 EX. STMH RIM: 904.91 INV: 899.41 E (30") INV: 899.41 W (30") INV: 899.51 N (18") RIM: 907.55 INV: 893.55 S EX. CB RIM: 897.81 INV: 897.41 N (12") INV: 894.41 S (12")||||ohVANDERBIE STREETSTREET HSTREET HSTREET GSTREET 2 STREET 2 STREET 4 MATCH LINE L103 MATCH LINE L104 PHASE 1 LIMITS DECIDUOUS TREE, SEE DETAIL SHRUB, SEE DETAIL METAL EDGING AND MULCH, SEE DETAIL 2 LS-109 3 LS-109 5 LS-109 ONLY PLANTINGS INSIDE OF PHASE 1 LINE ARE TO BE PLANTED IN PHASE 1 BENCH, SEE SITE PLAN TYP. EVERGREEN TREE, SEE DETAIL6 LS-109 2 AG 1 AG 5 PT 3 GI 2 CO 2 ARS 3 PT 4 QSW 2 ARS 3 ARS 3 GI 2 ARS 2 ARS 3 QSW 2 GI 3 ARS 2 QSW 2 QSW 5 CO 2 AB 2 GI 3 CO 4 AR 3 TR 6 TR 4 AR 5 HLL 6 HLL 5 TR 6 AR 3 HLL 6 TR 4 AR 6 HLL 5 TR 3 AR 3 TR 6 HLL 6 TR 4 AR 6 HLL 5 TR 3 HLL 3 AR 9 AR 3 HLL 3 HLL 3 AR 3 AR 9 HLL 6 TR 7 2 QSW 1 GI 1 CO 1 QSW 2 PBH 3 AB 2 SR 2 AG 2 ARS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-LNSCP-PH 1-PLAN.dwg 9/23/2022 11:00:00 AMLS-103 AS SHOWN AM AMKT N SCALE IN FEET 0 H: 40 80 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709ENLARGED LANDSCAPE PLAN-SOUTH STREET TREES IDENTIFIED ON SHEET L104 4 LS-109 3 LS-109 2 AR 6 GMC 4 BLC 6 GMC 2 AR 2 NFS 2 NFS 2 AR 5 TAY 4 BLC 5 TAY 2 AR 2 NFS 2 NFS PERENNIAL, SEE DETAIL SHRUB, SEE DETAIL 12 PVG 2 TEA 2 TEA 3 TEA 3 TEA 2 TEA 2 TEASTREET HSTREET TREES IDENTIFIED ON SHEET L104 2 AR 6 GMC 4 BLC 6 GMC 2 AR 2 NFS 2 NFS 2 NFS 2 TEA 2 NFS 14 PVG 2 NFS 2 TEA 2 NFS 2 NFS 2 TEA 2 NFS 2 AR 5 TAY 4 BLC 5 TAY 2 AR 10 PVG 10 PVG 2 TEA 2 TEA 3 TEA 2 TEA 2 TEA K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-LNSCP-PH 1-PLAN.dwg 9/23/2022 11:00:14 AMLS-104 AS SHOWN AM AMKT N SCALE IN FEET 0 H: 10 20 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709COLONIAL MANOR LANDSCAPE PLAN 8 UNIT COLONIAL MANOR LANDSCAPE PLAN TYP.1 LS-104 6 UNIT COLONIAL MANOR LANDSCAPE PLAN TYP.2 LS-104 STREET HSTREET TREES AND SHRUBS IDENTIFIED ON SHEET L104 4 LS-109 6 CAV 3 AH 3 AJ 1 AW 5 RSD 7 HWF 4 AW 7 SD 7 HWF 4 AW 7 SD 1 AW 5 RSD 3 AJ 3 AH PERENNIAL, SEE DETAIL S00°47'50"E 1193.27S00°47'50"E 1193.27STREET TREES AND SHRUBS IDENTIFIED ON SHEET L104 3 LS-109 3 AH 3 AJ 1 AW 5 RSD 3 CAV 1 AW 5 RSD 3 AJ 3 AH SHRUB, SEE DETAIL K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-LNSCP-PH 1-PLAN.dwg 9/23/2022 11:00:29 AMLS-105 AS SHOWN AM AMKT N SCALE IN FEET 0 H: 10 20 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709TOWNHOME LANDSCAPE PLAN 6 UNIT TOWNHOME LANDSCAPE PLAN TYP.1 LS-105 2 UNIT TOWNHOME LANDSCAPE PLAN TYP.2 LS-105 VANDERBIE STREETVANDERBIE STREET50' PETROLEUM EASEMENT DESOTO STREEToh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh oh XXXXXXXXXXX MB >>>>>>>>>>>>>>>>S S S S S S >>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D D D D D D |||||||||||||||||||||||| | | | ||||||||||||||||||||||N00°56'17"W 1100.00S89°58'02"E 552.22 S00°47'50"E 1193.27S89°33'17"W 270.00N00°47'47"W 95.56N89°57'54"W 279.49 N00°47'50"W 1054.11S89°58'02"E 117.75 S00°49'52"E 254.13S89°58'02"E 151.02 S00°49'52"E 800.00ALLEN AVENUE 60 33TRUNK H I G H W A Y 3 5 E - 6 9 4 33 33 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o C C C C C C F F F F F F CCCC6" DIP (PLAN)16" DIP (PLAN)8" DIP (P L A N ) 8" DIP 8" DIP 8" DIP COUNTY R O A D D E A S T 12" RCP12" RCP12" RCP 8" VCP 12" RCP 8" VCP ohohohohohX>>>>S S D N89°57'56"W 269.39 60 3333C F 6" WM 6" WM 12" RCP ALLEN AVENUE RIM: 905.14 ohohSTORMWATER POND oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohohohohohohohohohoh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh ohohohohoh oh oh XXXXXXXXXXX MB >>>>>>>>>>>>>>>>S S S S S S >>>>>>>>>>>>>>>>>>>>>>>>>>>>D D D D D D D D |||||||||||||||||||||||| | | | ||||||||||||||||||||||N00°56'17"W 1100.00S89°58'02"E 552.22 S00°47'50"E 1193.27S89°33'17"W 270.00N00°47'47"W 95.56N89°57'54"W 279.49 N00°47'50"W 1054.11S89°58'02"E 117.75 S00°49'52"E 254.13S89°58'02"E 151.02 S00°49'52"E 800.00ALLEN AVENUE 60 33TRUNK H I G H W A Y 3 5 E - 6 9 4 33 33 33 17 3317 p e t r o p e t r o p e t r o p e t r o p e t r o p e t r o C C C C C C F F F F F F CCCC6" DIP (PLAN)16" DIP (PLAN)8" DIP (P L A N ) 8" DIP 8" DIP 8" DIP COUNTY R O A D D E A S T 12" RCP12" RCP12" RCP 8" VCP 12" RCP 8" VCP ohohohohohX>>>>S S D N89°57'56"W 269.39 60 3333C F 6" WM 6" WM 12" RCP ALLEN AVENUE RIM: 905.14 ohohSTREET HSTREET HSTREET GSTREET 2 STREET 2 STREET 4 STREET 1 STREET 1 STORMWATER POND NWL=900.0 HWL=903.9 TYPE 1 SEED MIX SEE SPEC PHASE 1 LIMITS TYPE 2 SEED MIX SEE SPEC PHASE 1 LIMITS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-SEED-PH 1-PLAN.dwg 9/23/2022 11:00:49 AMLS-106 AS SHOWN AM AMKT N SCALE IN FEET 0 H: 80 160 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709OVERALL SEEDING PLAN SEED MIX SPECIFICATIONS ·TYPE I SEED MIX- SOD ·TYPE II SEED MIX - MNDOT COVER CROP AND RAPID STABILIZATION PER DURATION REQUIRED, REFERENCE MNDOT SEEDING MANUAL 2014 EDITION. LEGEND TYPE II SEED MIX TYPE I SEED MIX PROPOSED CONTOUR96 5 EXISTING CONTOUR EXISTING DECIDUOUS TREE EXISTING CONIFER TREE CONSTRUCTION LIMITS ROCK MULCH TYP. SEE DETAIL5 LS-109STREET HROCK MULCH TYP. SEE DETAIL5 LS-109 K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-SEED-PH 1-PLAN.dwg 9/23/2022 11:01:01 AMLS-107 AS SHOWN AM AMKT N SCALE IN FEET 0 H: 80 160 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709COLONIAL MANOR MATERIALS PLAN 8 UNIT COLONIAL MANOR LANDSCAPE PLAN TYP.1 LS-107 6 UNIT COLONIAL MANOR LANDSCAPE PLAN TYP.2 LS-107 LEGEND ROCK MULCH TYPE I SEED MIX PROPOSED CONTOUR96 5 EXISTING CONTOUR EXISTING DECIDUOUS TREE EXISTING CONIFER TREE CONSTRUCTION LIMITS ROCK MULCH TYP. SEE DETAIL5 LS-109 ROCK MULCH TYP. SEE DETAIL5 LS-109 S00°47'50"E 1193.27S00°47'50"E 1193.27ROCK MULCH TYP. SEE DETAIL5 LS-109 ROCK MULCH TYP. SEE DETAIL5 LS-109 K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-SEED-PH 1-PLAN.dwg 9/23/2022 11:01:11 AMLS-108 AS SHOWN AM AMKT N SCALE IN FEET 0 H: 10 20 SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709TOWNHOME MATERIALS PLAN 6 UNIT TOWNHOME LANDSCAPE PLAN TYP.1 LS-108 2 UNIT TOWNHOME LANDSCAPE PLAN TYP.2 LS-108 LEGEND ROCK MULCH TYPE I SEED MIX PROPOSED CONTOUR96 5 EXISTING CONTOUR EXISTING DECIDUOUS TREE EXISTING CONIFER TREE CONSTRUCTION LIMITS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-LNSCP-PH 1-PLAN.dwg 9/23/2022 11:01:24 AMLS-109 AS SHOWN AM AMKT SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709LANDSCAPE DETAILS 1/2"NOTES: 1.ROOTS OF ALL BALLED AND BURLAPPED STOCK SHALL FILL THE SOIL BALL, BE FREE OF KINKS, CIRCLING AND GIRDLING, AND THE UPPERMOST ROOTS SHALL NOT BE MORE THAN FOUR INCHES BELOW THE TOP OF THE SOIL BALL. TRANSPORT ROOTS SHALL BE SYMMETRICAL AROUND THE TRUNK / STEM OF THE PLANTS. SOIL BALLS MUST BE CENTERED OR NO MORE THAN 10% OFF CENTER. 2.WHEN MOVING PLANTS, LIFT FROM BENEATH THE ROOT BALL, DO NOT LIFT BY THE TRUNK AND DO NOT BREAK OR LOOSEN THE ROOTBALL. 3.BACKFILL PLANTING PIT WITH ORIGINAL SOIL HALFWAY TO THE TOP OF THE ROOTBALL. BREAK UP CLODS OF SOIL. IF SOILS ARE POOR (I.E. HEAVY CLAYS, SAND, OR COMPACTED), BACKFILL CAN BE A MIXTURE OF 1/3 SOIL AMENDMENT MIXED WITH 2/3 ORIGINAL SOIL. DO NO USE PEAT AS PART OF BACKFILL IN CLAY SOILS. REMOVE ALL ROCKS AND DEBRIS FROM BACKFILL AND THEN WATER PLANT AND BACKFILLED AREA TO SETTLE PLANTS AND FILL VOIDS. 4.REMOVE ALL WIRE BASKETS FROM THE TOP 1/2 OF THE ROOTBALL AND CONTINUE BACKFILLING REMAINING PLANTING PIT WITH ORIGINAL SOIL. 5.WATER THOROUGHLY A SECOND TIME TO SETTLE PLANTS AND FILL VOIDS WITHIN TWO HOURS OF PLANTING. PLACE SPECIFIED MULCH WITHIN 48 HOURS OF THE SECOND WATERING. PROVIDE SUPPORT IF NECESSARY. 6.STAKING OF TREES SHALL BE THE CONTRACTORS OPTION. THE CONTRACT IS RESPONSIBLE FOR INSURING THAT ALL PLANTINGS ARE INSTALLED PLUMB AND REMAIN PLUMB THROUGHOUT THE WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION, WHICHEVER IS GREATER. 7.IF STAKING IS INSTALLED ALL COMPONENTS SHALL BE REMOVED BY THE CONTRACTOR AT THE END OF THE WARRANTY PERIOD. REMOVE EXCESS SOIL / ROOTS FROM THE TOP OF SOILBALL TO EXPOSE THE FIRST MAIN LATERAL ROOT. PRUNE ALL ENCIRCLING ROOTS. EACH TREE MUST BE PLANTED WITH THE FIRST MAIN LATERAL ROOT AT FINISH GRADE. TREES WITH THE FIRST MAIN LATERAL ROOT NOT VISIBLE WILL BE REJECTED. REMOVE ALL TWINE AROUND THE STEM.VERTICAL SLITS SHOULD BE CUT IN REMAINING NON-SYNTHETIC BURLAP 16" O.C. ALL SYNTHETIC BURLAP MUST BE REMOVED. TOP 13 OF NON-SYNTHETIC BURLAP MUST BE CUT OFF AND REMOVED COMPLETELY, NOT FOLDED DOWN. TOP 13 OF WIRE BASKET MUST BE CUTOFF AND REMOVED COMPLETELY - DO NOT BEND IT BACK. TREE PLANTING - BALLED & BURLAPPED STOCK1 LS-109 NOTES: 1.SEE BALLED AND BURLAPPED PLANTING STOCK DETAIL FOR FURTHER NOTES. TREE MUST MEET OR EXCEED ANSI Z60.1 (AMERICAN STANDARD FOR NURSERY STOCK.) ONE DOMINANT LEADER MUST BE MAINTAINED THROUGH THE WARRANTY PERIOD. 4" HIGH EARTH SAUCER BEYOND EDGE OF ROOTBALL, FOR 360°. SET ROOTBALL ON 4"-6" MOUND OF UNDISTURBED / NATIVE SOIL TO PREVENT SETTLING. MULCH RING SHOULD BE MIN. 3" DEEP. KEEP MULCH 4" AWAY FROM TRUNK BASE. EACH TREE MUST BE PLANTED SUCH THAT THE ROOT FLARE IS VISIBLE AT THE TOP OF THE ROOTBALL AND LEVEL WITH FINISH GRADE. DIAMETER OF HOLE SHALL BE TRIPLE THE DIAMETER OF THE ROOTBALL. THE SIDES SHOULD SLOPE GRADUALLY. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOTBALL IN 6" LIFTS. DO NOT OVER COMPACT. AFTER BACKFILLING, POUR WATER AROUND ROOTBALL TO SETTLE THE SOIL. RUBBER / NYLON STRAPPING TIGHTENED ONLY ENOUGH TO PREVENT SLIPPAGE. FLAG FOR VISIBILITY. FABRIC GUYING STRAP WITH HOSE CHAFING GUARD AMENDED PLANTING SOIL. SEE SPECIFICATIONS FOR DETAILS METAL STAKES, 2"x24" LONG DRIVEN BELOW FINISH GRADE. DECIDUOUS TREE PLANTING2 LS-109 SET ROOTBALL ON 4"-6" MOUND OF UNDISTURBED / NATIVE SOIL TO PREVENT SETTLING. METAL STAKES, 2"x24" LONG DRIVEN BELOW FINISH GRADE. DIAMETER OF HOLE SHALL BE TRIPLE THE DIAMETER OF THE ROOTBALL. THE SIDES SHOULD SLOPE GRADUALLY. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOTBALL IN 6" LIFTS. DO NOT OVER COMPACT. AFTER BACKFILLING, POUR WATER AROUND ROOTBALL TO SETTLE THE SOIL. RUBBER / NYLON STRAPPING TIGHTENED ONLY ENOUGH TO PREVENT SLIPPAGE. FLAG FOR VISIBILITY. FABRIC GUYING STRAP WITH HOSE CHAFING GUARD AMENDED PLANTING SOIL. SEE SPECIFICATIONS FOR DETAILS TREE MUST MEET OR EXCEED ANSI Z60.1 (AMERICAN STANDARD FOR NURSERY STOCK.) ONE DOMINANT LEADER MUST BE MAINTAINED THROUGH THE WARRANTY PERIOD. MULCH RING SHOULD BE MIN. 3" DEEP. KEEP MULCH 4" AWAY FROM TRUNK BASE. EACH TREE MUST BE PLANTED SUCH THAT THE ROOT FLARE IS VISIBLE AT THE TOP OF THE ROOTBALL AND LEVEL WITH FINISH GRADE. 4" HIGH EARTH SAUCER BEYOND EDGE OF ROOTBALL, FOR 360°. CONIFEROUS TREE PLANTING6 LS-109 THIN BRANCHES AND FOLIAGE (NOT ALL END TIPS) BY 1/3 RETAINING NORMAL PLANT SHAPE, THINNING, NOT REQUIRED ON EVERGREENS. MOUND PLANTING SOIL 4" TO FORM SAUCER REMOVE BURLAP FROM TOP 1/3 OF BALL REMOVE CONTAINERIZED PLANTS FROM THEIR CONTAINERS MIXTURE PLANTING SOIL EXISTING GRADE 3" MULCH 6"12"12" NOTES: 1.PLANT SHRUBS IN LOCATIONS PER PLAN AND APPROVED BY LA/E. SHRUB PLANTING3 LS-109 PLAN 3" DEPTH HARDWOOD MULCH, SEE SPECIFICATIONS PLANTING SOIL MIXTURE PERENNIAL OR GROUND COVER (TYPICAL)4"RECOMMENDED SPACING 12"NOTES: 1.PLANT PERENNIALS AND GROUNDCOVERS IN LOCATIONS PER PLAN. SECTION PERENNIAL & GROUNDCOVER4 LS-109 METAL EDGE AND MULCH5 LS-109 NOTES: 1.SEE BALLED AND BURLAPPED PLANTING STOCK DETAIL FOR FURTHER NOTES. 8" STAPLES TO ANCHOR WEED BARRIER AT 3' O.C.; 12" O.C. AT SEAMS AS REQUIRED MULCH, TYPE AND DEPTH AS SPECIFIED WEED BARRIER FABRIC, AS SPECIFIED METAL EDGING, AS SPECIFIED. INSTALL ACCORDING TO MANUFACTURER'S SPECIFICATIONSDEPTHVARIESFINISH GRADE, LAWN K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GENL-PH 1-DETL.dwg 9/23/2022 11:01:37 AMCS-501 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709CIVIL DETAILS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GENL-PH 1-DETL.dwg 9/23/2022 11:01:45 AMCS-502 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709CIVIL DETAILS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GENL-PH 1-DETL.dwg 9/23/2022 11:01:55 AMCS-503 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709CIVIL DETAILS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GENL-PH 1-DETL.dwg 9/23/2022 11:02:05 AMCS-504 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709CIVIL DETAILS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GENL-PH 1-DETL.dwg 9/23/2022 11:02:16 AMCS-505 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709CIVIL DETAILS K:\019789-000\Cad\Plan\PHASE 1\019789-000-C-GENL-PH 1-DETL.dwg 9/23/2022 11:02:25 AMCS-506 AS SHOWN SJH KWHSJH SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONPIONEER COMMONSLENNAR HOMES - LITTLE CANADA, MINNESOTA019789-000 KYLE W. HOFF09/23/202259709CIVIL DETAILS SHEET 1 OF 3 SHEETS PIONEER COMMONS PIONEER COMMONS SURVEYOR'S CERTIFICATE I, Jeffrey J. Rolfson, Professional Land Surveyor, do hereby certify that I have surveyed or directly supervised the survey of the property described on this plat, prepared this plat or directly supervised the preparation of this plat; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments on the exterior boundary have been correctly set and that all other monuments indicated on this plat will be correctly set within one year of the recording of this plat; that all water boundaries and wet lands as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of the surveyor's certification are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this ________ day of _______________, 20___. _____________________________________ Jeffrey J. Rolfson, Professional Surveyor Minnesota License No. 49003 STATE OF MINNESOTA COUNTY OF OLMSTED This instrument was acknowledged before me on ______________________ by Jeffrey J. Rolfson. _______________________________________ __________________________ Notary Public, ____________ County, Minnesota Notary Printed Name My commission expires __________________ KNOW ALL PERSONS BY THESE PRESENTS: That U.S. Home, LLC, a Delaware limited liability company, owner of the following described property: Lot 12, Block 2, GERVAIS HEIGHTS, Ramsey County, Minnesota. ALSO Lots 1, 2, 3, 4, 5, 6, 7, 8 and 9, Block 1, and Lots 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 20, 21, 22, 23, 24, 25 and 26, Block 2, GERVAIS HEIGHTS, Ramsey County, Minnesota. ALSO Lot 16, Block 2, GERVAIS HEIGHTS, Ramsey County, Minnesota. ALSO Lot 17, Block 2, GERVAIS HEIGHTS, Ramsey County, Minnesota. ALSO Lot 18, Block 2, GERVAIS HEIGHTS, Ramsey County, Minnesota. ALSO Lot 19, Block 2, GERVAIS HEIGHTS, Ramsey County, Minnesota. ALSO All that part of the W. 179 feet of the E. 730 feet of the N. 254.10 feet of the E 1/2 of W 1/2 of Sec. 5, T. 29, R. 22, which lies between the E. line of Vanderbie Street produced N. to N. line of said Sec. 5, and the W. line of said Lot 1, Block 1, GERVAIS HEIGHTS, Ramsey County, Minnesota, produced N. to N. line of said Sec. 5. Has caused the same to be surveyed and platted as PIONEER COMMONS and does hereby dedicate to the public for public use forever the public ways and easements for drainage and utility purposes as shown on this plat. In witness whereof, said U.S. Home, LLC, a Delaware limited liability company, has caused these presents to be signed by its proper officer this _______day of ______________, 20___. SIGNED: U.S. Homes, LLC ____________________________________________ XXXXXXXX, XXXXXXXXXXXXXX STATE OF ____________ COUNTY OF ____________ This instrument was acknowledged before me on ____________________ by XXXXXXXXXXX, XXXXXXXXXXXXXX of U.S. Home, LLC, a Delaware limited liability company. ___________________________________ __________________________ Notary Public, ____________ County, Minnesota Notary Printed Name My commission expires __________________ 3701 40th Avenue NW Rochester, MN 55901 507-218-3745 www.wsbeng.com CITY OF LITTLE CANADA We do hereby certify that on the ______day of ___________________, 20___, the City Council of the City of Little Canada, Minnesota, approved this plat. Also the conditions of Minnesota Statutes, Section 505.03, Subd. 2, have been fulfilled. ___________________________________ ___________________________________ Mayor Manager RAMSEY COUNTY SURVEYOR Pursuant to Minnesota Statutes, Section 383A.42, this plat is approved this _______ day of _______________, 20___. ________________________________________________ Daniel D. Baar, L.S. Ramsey County Surveyor PROPERTY TAX, RECORDS AND ELECTION SERVICES DEPARTMENT Pursuant to Minnesota Statues, Section 505.021, Subd. 9, taxes payable in the year 20___ on the land hereinbefore described have been paid. Also pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this ________ day of ___________________, 20___. Heather L. Bestler, Ramsey County Auditor/Treasurer By ___________________________________, Deputy COUNTY RECORDER COUNTY OF RAMSEY, STATE OF MINNESOTA I hereby certify that this plat of PIONEER COMMONS was filed in the office of the County Recorder for public record on this ________ day of ____________________, 20___, at _______ o'clock ___M., and was duly filed in Book ____________ of Plats, Pages _______, _______ and _______, and as DOCUMENT NUMBER _______________________. __________________________________ Deputy County Recorder REGISTRAR OF TITLES COUNTY OF RAMSEY, STATE OF MINNESOTA I hereby certify that this plat of PIONEER COMMONS was filed in the office of the Registrar of Titles for public record on this ________ day of ____________________, 20___, at _______ o'clock ___M., and was duly filed in Book ____________ of Plats, Pages _______, _______ and _______, and as DOCUMENT NUMBER _______________________. __________________________________ Deputy Registrar of Titles ELECTRIC TRANSMISSION EASEMENT PER DOC. NO. 639490 N00°56'17"W 1100.00S89°58'02"E 552.22 S00°47'50"E 1193.27S89°33'17"W 270.00N00°47'47"W95.56N89°57'54"W 279.49 N00°47'50"W 1054.11S89°58'02"E 117.75 S00°49'52"E 254.13S89°58'02"E 151.02 S00°49'52"E 800.00N89°57'56"W 269.39 S89°58'35"W 74.19N00°47'50"W28.00N89°58'35"E 37.38 N00°47'50"W 461.73S89°58'35"W 47.05N00°47'50"W28.00N00°47'50"W 188.45N89°58'35"E 551.53 OUTLOT A OUTLOT C OUTLOT D OUTLOT B OUTLOT EOUTLOT E(SEE SHEET 3 FOR DETAILS)49.80610.73211.60245.2032.47145.57 406.65 211.59277.11150.50903.61123.17130.96N77°24'51 " E 1 4 8 . 6 1 L =11 9 .1 8 R =1 8 5 5 .7 2 Δ =3 °4 0 '4 7 " Chd=N80°35 ' 3 5 " E Chd L=119.1 6 (ALL OF OUTLOT C IS A DRAINAGE AND UTILITY EASEMENT)254.10NE COR. NW 14 SEC. 5, T.29N, R.22W CAST IRON MONUMENT N. LINE NW 14 SEC. 5, T.29N, R.22W E. LINE VANDERBIE ROAD(F.K.A. VANDERBIE STREET)179W. LINE E. 730 FEET E 12 W 12 SEC. 5, T.29N, R.22W 50 FOOT UTILITY EASEMENTPER DOC. NO. A04957310W. LINELOT 1N89°58'35"E 255.85 N00°01'25"W25.00N89°58'35"E 60.00 S00°01'25"E25.00N89°58'35"E 149.46N00°01'25"W25.00N89°58'35"E60.00S00°01'25"E25.00N89°58'35"E 25.708.92246.93 TRUNK HIGHWAY 35E-694 TRUNK H I G H W A Y 3 5 E - 6 9 4 S. LINE N. 254.10 FEET R/W LINE R/W LINE NW COR. NE 14 NW 14 SEC. 5, T.29N, R.22W S89°58'02"E 1314.66S89°58'02"E 1314.66 NW COR. NW 14 SEC. 5, T.29N, R.22W CAST IRON MONUMENT SHEET 2 OF 3 SHEETS PIONEER COMMONS PIONEER COMMONS NOTE: ALL MONUMENTS SHOWN THUS: ARE SET 5/8" I.D. CAPPED PIPES WITH LICENSE NO. 49003 WHICH WILL BE SET WITHIN 1 YEAR AFTER RECORDING OF THIS PLAT. ALL MONUMENTS SHOWN THUS: ARE FOUND 5/8" PIPES UNLESS OTHERWISE NOTED. N SCALE IN FEET 0 80 160 3701 40th Avenue NW Rochester, MN 55901 507-218-3745 www.wsbeng.com BASIS OF BEARING SYSTEM : ALL BEARINGS ARE IN RELATIONSHIP WITH THE NORTH LINE OF THE NORTHWEST QUARTER OF SECTION 5, TOWNSHIP 29, RANGE 22, WHICH IS ASSUMED TO BE S89°58'02"E. PROPERTY LOCATION MAP SECTION 5, TOWNSHIP 29N, RANGE 22W 56 7 8 5 45 98 3231 3332 56 45 NOT TO SCALE SITE 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 1 2 1 2 3 4 5 6 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 S00°47'50"E 1193.27S89°33'17"W 270.00N00°47'47"W 95.56N89°57'54"W 279.49 N89°57'56"W 269.39 74.19N00°47'50"W28.00N89°58'35"E 37.38 N00°47'50"W 461.73S89°58'35"W 47.05N00°47'50"W28.00N00°47'50"W 461.73N00°47'50"W 461.73N00°47'50"W 461.73N89°58'35"E 109.01 N89°58'35"E 92.01 N89°58'35"E 92.01 N00°47'50"W 187.42S00°47'50"E 187.79S89°58'35"W 174.39 100.20 N00°47'50"W 162.00N89°12'10"E 72.00 S00°47'50"E 162.00S89°12'10"W 72.00N00°47'50"W 162.00N89°12'10"E 72.00 S00°47'50"E 162.00S89°12'10"W 72.00S89°12'10"W 90.00 N89°12'10"E 90.00 S89°12'10"W 90.00N00°47'50"W 148.00S00°47'50"E 148.00N89°12'10"E 90.00 S89°12'10"W 90.00N00°47'50"W 148.00S00°47'50"E 148.00N89°12'10"E 90.00 N89°12'10"E 72.00 N00°47'50"W 62.00S00°47'50"E 62.00S89°12'10"W 72.00 N89°12'10"E 72.00 N00°47'50"W 162.00S00°47'50"E 162.00S89°12'10"W 72.00 N00°47'50"W 116.00S00°47'50"E 116.00S89°12'10"W 92.00 S89°12'10"W 92.00 N89°12'10"E 109.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.0045.00 42.0032.0032.0042.0042.0032.0032.0042.00N89°12'10"E 109.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.0045.00 42.0032.0032.0042.0042.0032.0032.0042.0042.0032.0032.0042.0042.0032.0032.0042.0042.0032.0042.0045.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 42.0032.0042.0042.0032.0042.0031.0031.0031.0031.0072.00 31.0025.0025.0025.0025.0031.0031.0025.0025.0025.0025.0031.0072.00 72.00 72.00 72.00 72.00 31.0025.0025.0025.0025.0031.0031.0025.0025.0025.0025.0031.0072.00 72.00 72.00 72.00 72.00 31.0025.0025.0025.0025.0031.0031.0025.0025.0025.0025.0031.0072.00 72.00 72.00 72.00 72.00 2 3 4 5 6N00°47'50"W 162.00N89°12'10"E 72.00 S00°47'50"E 162.00S89°12'10"W 72.00 31.0025.0025.0025.0025.0031.0031.0025.0025.0025.0031.0072.00 72.00 72.00 72.00 72.0025.00N00°47'50"W 188.451 S61° 1 6' 3 0" W 20.59 N 4 8 ° 0 4 ' 3 6 "W 2 4 . 7 6 S 4 7 ° 3 8 ' 2 1 " E 1 3 . 7 1N32°07'04"E18.40S18°09'34"E33.51S16°59'57"E32.26N66°4 6' 3 5 " E 9.74 S67 ° 5 4 ' 2 4 " E 9.7 7 S67 ° 5 4 ' 2 4 " E 9.77 N66°4 6' 3 5 " E 9.74 N66°4 1' 0 5 " E 9.74 N51° 29' 40" E 12.64 S 4 8 ° 4 8 ' 3 6 " E 1 3 . 4 5 N47°11'31" E 13.46S 4 8 ° 4 8 ' 3 6 " E 1 3 . 4 5 N47°10'43" E 13.4649.80 100.20 28.00 92.00 28.0028.00186.83203.00180.0178.73OUTLOT B (ALL OF OUTLOT C IS A DRAINAGE AND UTILITY EASEMENT) OUTLOT D OUTLOT E OUTLOT E(ALL OF OUTLOT E IS A DRAINAGE AND UTILITY EASEMENT)OUTLOT FOUTLOT GOUTLOT LOUTLOT MOUTLOT JOUTLOT IOUTLOT EOUTLOT EOUTLOT E1 2 3 4 5 6 7 8 N89°58'35"E 255.85 N00°01'25"W25.00N89°58'35"E 60.00 S00°01'25"E25.00N89°58'35"E 149.46 N00°01'25"W25.00S00°01'25"E25.00N89°58'35"E 25.70 8.92246.93 N89°58'35"E 60.00 S89°58'35"W 25.63 N00°01'25"W22.00S89°58'35"W 60.00 N00°01'25"W22.00S89°58'35"W 23.38 S89°58'35"W 36.73 S89°58'35"W 32.00 S00°01'25"E 22.00 S89°58'35"W 23.28(ALL OF OUTLOT E IS A DRAINAGEAND UTILITY EASEMENT)OUTLOT HOUTLOT KOUTLOT C SHEET 3 OF 3 SHEETS PIONEER COMMONS PIONEER COMMONS N SCALE IN FEET 0 40 80 3701 40th Avenue NW Rochester, MN 55901 507-218-3745 www.wsbeng.com NOTE: ALL MONUMENTS SHOWN THUS: ARE SET 5/8" I.D. CAPPED PIPES WITH LICENSE NO. 49003 WHICH WILL BE SET WITHIN 1 YEAR AFTER RECORDING OF THIS PLAT. ALL MONUMENTS SHOWN THUS: ARE FOUND 5/8" PIPES UNLESS OTHERWISE NOTED. BASIS OF BEARING SYSTEM : ALL BEARINGS ARE IN RELATIONSHIP WITH THE NORTH LINE OF THE NORTHWEST QUARTER OF SECTION 5, TOWNSHIP 29, RANGE 22, WHICH IS ASSUMED TO BE S89°58'02"E.