My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-2023 Council Packet
>
City Council Packets
>
2020-2029
>
2023
>
09-13-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2023 4:22:40 PM
Creation date
9/20/2023 4:19:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STAFF REPORT <br /> <br /> <br /> <br />TO: Mayor Fischer and Members of the City Council <br /> <br />FROM: Eric Seaburg, P.E., City Engineer <br /> <br />DATE: September 13, 2023 <br /> <br />RE: Partial Payment #3 – Twin Lake Boulevard Improvements <br /> Change Order #2 – Twin Lake Boulevard Improvements <br /> <br /> <br />ACTIONS TO BE CONSIDERED: <br />Motion to approve Partial Pay Estimate No. 3 to Minnesota Paving and Materials in the amount <br />of $503,720.65. <br /> <br />Motion to approve Change Order No. 2 to Minnesota Paving and Materials in the amount of <br />$41,059.14. <br /> <br />BACKGROUND: <br />The total amount earned by the Contractor to date is $976,352.28. The amount paid previously is <br />$423,814.02. Withholding a 5% retainage, the amount due is $503,720.65. <br /> <br />The proposed Change Order 2 includes all non-routine construction-related changes or additions <br />that have developed through the project to-date. Change Order 2 includes the following project <br />modifications: <br /> <br />1. Removal and replacement of a deteriorated corrugated metal roadway culvert. <br />a. This will be a shared cost between Little Canada and Vadnais Heights in <br />accordance with the Cooperative Agreement. <br /> <br />2. Reconstruction of an off-street sanitary manhole, including earthwork and grading to <br />make the manhole more accessible to maintenance staff. <br />a. This will be a City of Little Canada cost. <br /> <br />3. The addition of an above-grade flushing hydrant to facilitate easier flushing of the shared <br />inter-City emergency watermain connection. <br />a. This will be a shared cost between Little Canada and Vadnais Heights in <br />accordance with the Cooperative Agreement. <br /> <br />4. Cleaning, jetting, and televising of 36” storm sewer that was scheduled for replacement. <br />The pipe was filled with sediment, concrete, and asphalt chunks and had been a <br />maintenance problem for years. Cleaning and televising the pipe allowed staff to inspect
The URL can be used to link to this page
Your browser does not support the video tag.