Laserfiche WebLink
MEMORANDUM <br />TO: Joel Hanson <br />FROM: Jerry Bourdon <br />DATE: May 25, 1994 <br />VIA FAX: 484-4538 <br />SUBJECT: Trail and Walk Costs <br />Jackson Street / Old Co. Rd. C / Lake Shore Ave. <br />At the May 11 Council meeting, Council ordered the inclusion <br />of trails and/or walks in this project. Costs for these <br />improvements were not in the original scope of the <br />feasibility study. Provided herein are rough cost estimates <br />for consideration. <br />I have divided the trail issue into three segments. Attached <br />is a drawing illustrating the routes of these segments. <br />The following summarizes the cost estimates for these <br />segments. <br />Segment 1: 8' bituminous trail $ 40,000 <br /> 5' concrete walk 43,230 <br /> 6' concrete walk 49,240 <br />Segment 2: 8' bituminous trail $ 34,200 <br /> 5' concrete walk 39,140 <br /> 6' concrete walk 42,275 <br />Segment 3: 8' bituminous trail $ 5,150 <br /> 5' concrete walk 5,345 <br /> 6' concrete walk 6,040 <br />We are proceeding with incorporating this work into the plans <br />and specifications which will be presented to Council for <br />approval at the June 7 Council meeting. This information is <br />provided to get confirmation of our understanding of <br />Council's direction and provide any additional direction that <br />Council or staff may feel is necessary. <br />Page 9 <br />